MIS portal Update - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

MIS portal Update

Description:

A dashboard style application for display of Market Participant specific information. ... a review of existing content & functionality for what should move to new MIS ... – PowerPoint PPT presentation

Number of Views:112
Avg rating:3.0/5.0
Slides: 16
Provided by: KateH4
Category:
Tags: mis | checkout | portal | update

less

Transcript and Presenter's Notes

Title: MIS portal Update


1
MIS portal Update
  • Pat Harris

A portal is a web site or service that offers a
broad array of resources and services such as
e-mail, forums, search engines, and on-line
reference material.
2
Agenda
  • Phase 1
  • Current Status we have a vendor!
  • Plan when? what?
  • Phase 2
  • Expectations whats next
  • Prototypes a preview opportunity
  • Next Steps
  • How you can help
  • What well be doing until next briefing

3
Phase 1 Current Status we have a vendor!
  • Check out Enterpulse at www.Enterpulse.com
  • Why Enterpulse?
  • Response included approach, references
  • Proposed project team did the presentation very
    professional
  • Emphasis on quality, testing, frequent review
    cycles
  • Focus on human factors and web site usability
  • References were excellent
  • Areas of Expertise
  • Specialty in web solutions
  • Service Oriented Architecture (SOA)

4
Phase 1 Statement of Work
  • Covers Conceptual Design
  • Goes through December to reach Conceptual Design
  • Review points are Requirements, Use Cases, Wire
    Frames, Site Map and Test Cases
  • Final deliverable will be a Conceptual Design
    document plus a plan, timeline and budget
    estimate for Phase 2

5
Phase 1 Milestones and timeline
We are HERE
Phase 1 Timeline Worm
6
MIS portal Project Objectives (scope)
Configurable MyPage, for content access
according to user preferences. Authentication
System that enables levels of access to
data/applications by role Single sign on
capability, passing credentials through to
applications as they are loaded Categorization
of data as PUBLIC, SECURE, and CERTIFIED. Dynamic
-update area, where data such as temperature,
load requirements and forecasts, and system
information may be captured either automatically
or posted manually by ERCOT. Search engine and
query tools
A content area, where data such as Engineering
Studies, monthly reports, policies and
procedures, special forms, etc. can be posted and
accessed. A messaging system for posting
notifications and requests. Authenticated
access to applications (a launch pad) as
described in the Protocols. Nice to haves A
dashboard style application for display of Market
Participant specific information. Replacement of
TML site.
7
Phase 1 Budget Tradeoffs require Change
Request
  • A dashboard style application for display of
    Market Participant specific information.
  • PJM system would serve as a model
  • Includes capability to download Market
    Participant-specific data for local data review,
    analysis, manipulation
  • Requires documentation of exactly what data,
    presentation methods, and clear requirements
  • Estimated cost 500,000
  • Replacement of TML site.
  • Requires a review of existing content
    functionality for what should move to new MIS
  • Requires that we re-evaluate all pre-Nodal
    protocols for content expectations
  • Requires Protocol revision
  • Estimated cost 500,000 - 700,000

8
Phase 1 VVHLD
9
Phase 2 Expectations
  • Phase 2 timeline worm

10
Phase 2 Sample wire frame My Page
Only entities with access to secure or certified
information may access the MIS. The MIS, however,
will contain links to all information public,
secure and certified specified in the
protocols.
11
Phase 2 Sample Reports Extracts Landing Page
Landing page for Reports and Extracts displays
user-defined reports Left navigation displays
protocol sections clicking a section expands
the menu to display subsections
12
Phase 2 Sample Reports and Extracts subsection
Clicking a subsection displays all reports and
extracts available for this role/company (secure
and certified) Users can select reports to
display on My Reports or My MIS page Or, click
the report name to view or download.
13
Phase 2 Sample Reports and Extracts data request
This is an example of a daily report that may be
viewed as a web page, downloaded or requested via
web service. Older reports may be accessed by
clicking Archives.
14
Next Steps What we need from TPTF
  • Active participation from the MIS Task Force
  • Reviews and timely approvals at specified points
  • Requirements review Sept 29
  • Site Map Wire frames Oct 15
  • User Roles / Authentication model Nov 1
  • Use Cases Nov 15
  • Conceptual Design Dec 1

15
Next Steps
  • Finalize the vendor Statement of Work this week
  • Vendor onsite Sept. 21
  • Integrate them into the team
  • Sited together
  • Participate in meetings w/task force
  • Design! Build! Document! Review!
Write a Comment
User Comments (0)
About PowerShow.com