Checkout of Grassed Waterways - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Checkout of Grassed Waterways

Description:

Checkout of Grassed Waterways. Beth E. Clarizia, P.E. ... If rock outlet pad is at downstream end, include in waterway checkout. Alternative designs ... – PowerPoint PPT presentation

Number of Views:522
Avg rating:3.0/5.0
Slides: 18
Provided by: amiewhi
Category:

less

Transcript and Presenter's Notes

Title: Checkout of Grassed Waterways


1
Checkout of Grassed Waterways
  • Beth E. Clarizia, P.E.
  • Agricultural Engineer

2
Standard Requirements
  • Waterways designed to handle a minimum capacity
  • Must have a stable outlet
  • Flow velocities targeted for a reasonable range,
    but kept below 5 fps
  • When design velocity gt3 fps, ECB is required
  • Seeding dates 3/1-5/15 or 8/1-9/30

3
Checkout Requirements
  • Measured constructed length
  • Center and low bank shot every 100 feet
  • Full cross section every 300 feet

4
Design
  • The whole design storm must fit inside the
    designed flow section, and the velocity when this
    design section flows full cannot exceed 5 fps.

5
Cross-sections
  • Must show that water drains to the waterway.

6
Cross-sections
  • Can assume a tenth or two of depth of fill along
    the sides, but be careful.

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Survey methods
  • Use actual, surveyed cross sections and
    centerline points. Do not interpolate from a
    generated contour.

13
Waterway Inlets and Outlets
  • Upstream and downstream ends must
  • grade out to existing stable ground
  • meet a structure
  • If rock outlet pad is at downstream end, include
    in waterway checkout

14
Alternative designs
  • Not eligible

15
Seeding
  • Indicate whether you have done the seeding or not
    above your signature on the survey notes page
  • If installing ECB, fill out ECB installation
    report (you should always be confirming seeding
    if installing ECB)

16
Rates
  • Grassed Waterway 320 per waterway

17