Title: How Engineering Supports Manufacturing
1How Engineering Supports Manufacturing
Peavey Electronics March 28, 2000
2Introduction
- Senior Design
- Larry E. Hand, MEE PE MCSE
- Master Electrical Engineering, Auburn University
1977 - Harris Corporation, Melbourne Fl. 1977-83
- Peavey Electronics, 1983-Present
3Proof of Concept..
4After Proof of Concept, What Next?
- Vacation
- Big Bonus
- Two Attaboys
- Another Project
- Physical Design and Transition to Manufacturing
5Life After Prototyping
- Physical Design and PC Layout
- Parts Procurement
- Costing
- Agency Approvals
- Documentation, Literature and Manuals
6More things to consider
- Mechanical Design and Packaging
- Manufacturing Deliverables
- Murphys Law- ECNs and rework
- Its Always yours..
7Printed Circuit Board Design
- Component Placement
- Input/Output locations
- Mounting Considerations
- Technology Selection
- Restricted areas
- Minimize crossing count
- Thermal Management
8Printed Circuit Board Design
- Electrical Considerations
- High Impedance Nodes
- Differential signal pairing
- Shielding for Magnetic and Capacitive Coupling
- Transmission Line Effects- OverShoot and Ringing
- EMI/EMC
- Ground is NOT Ground......
9Printed Circuit Board Design
- Manufacturing Considerations
- Component Spacing
- Orientations
- Hole Sizes
- Insertion Tooling Restrictions
- Tooling Holes
- Panelization
10(No Transcript)
11(No Transcript)
12Parts Approval and Procurement
- Standard Parts
- Multiple Sourced
- Cost Effective
- Minimal Specifications required
- Improved response to demand changes
- Note Not all parts are created equal....
- Single Sourced
- Unique or Patented Technical Advantage
- An Act of Nature could shut you down!
- Know Who Youre Dealing With
13(No Transcript)
14Parts Approval and Procurement
- Custom Parts
- Product Differentiation
- Protect Trade Secrets and Intellectual Property
- Extensive Specifications/Documentation
- If you change your mind, Theyre still yours
- Requires Accurate Forecasting
15Parts Approval and Procurement
- Approved Vendor List (AVL)
- Lead Times
- Minimum Quantities
- Packaging/Delivery Options
- Bulk
- Tape and Reel
- Tape and Ammo
- Trays or Tubes
16How is Cost Determined
- Material Cost
- Labor Cost
- Manufacturing Burden
- SGA
17How Much does it Cost
- Material Cost---52 of Total Cost
- Unit Price Quantity for all BOM items
- Labor Cost --- 8 of Total Cost
- Direct labor or value added labor required to
manufacture the product
18How Much Does it Cost
- Manufacturing Burden --- 17 of Cost
- Indirect Labor
- Utilities
- Facilities
- Employee Benefits
- Depreciation, rent, etc..
19How Much Does it Cost
- Sales/General and Administrative -- 23
- Cost of Selling the Product
- Sales commission
- Advertising
- Service and Warranty
- Corporate Management
- Research and Development
- IS, Bad Debt, etc..
20Agency Approvals
- UL
- CSA
- FCC
- NOM
- CE
- NEMKO
- DEMKO
- VDE
- IRAM
- SASO
- SANZ
- SAA
- JIS
- and more.....
21Documentation
- User Manual
- Technical Specifications
- Service Manual
- Assembly Directions
- Marketing Support
- Advertising Copy
22Packaging
- Protect Unit During Shipment
- Attractive at Point of Sale
- Advertising
- OEM or Consumer packaging
23PCB Manufacturing Flow
- Top Side SMT
- DIP ICs and Sockets
- Axial leaded components
- Bottom side SMT
- Radial leaded components
- Hand Assembly
- Wave Solder
- Touchup and Inspect
- Precheck
24Manufacturing Deliverables
- Programs for Automated Assembly Equipment
- Axial Sequencer and Insertion
- Radial Insertion
- DIP Socket and IC insertion
- Surface Mount Chips, ICs, Odd Shaped Components
- GenRad Automated Test
25Manufacturing Deliverables
- PCB Assembly Drawings
- Gerber Files
- Mechanical Fabrication Drawings
- Functional Test Procedure
- Technical Specifications
- Trouble Shooting procedures
- Your Experience and Knowledge
26Oops....
- Tolerances
- Incomplete Beta Testing
- Parts Availability
- Poor Manufacturing Yield
- Poor Reliability
- Marketing Redirection/Feature Addition
27Engineering Change Orders
- ECOs document a change that manufacturing will
implement - Disposition of existing inventory
- Disposition of Work In Process
- Reason for Change
- Cost/Performance/Schedule Impacts
28Engineering Change Orders
- Safety - Liability
- Recall, Disposition of units already sold
- Obsolete inventory
29Sustaining Engineering
- If you birth it, Its always your baby
- Customer complaints
- Obsolete Parts
- Unique Parts
- Warranty claims and Field Failures
- Specification changes in standard components