Title: CR5 Dimuon Spectrometer


1
CR5 Dimuon Spectrometer
  • General status
  • Tracking H. Borel
  • Trigger A. Musso
  • Conclusion

2
Status
  • All detectors on production and on time (see
    separate presentations)
  • No technical problems on detectors
  • Magnet has been tested
  • some insulating work has to be done but
    basically on track
  • Is being moved to final position
  • Structures (FASS, ) all in progress in the
    cavern (see session on Alice structures)

3
Status II
  • Trigger electronics ok
  • Tracking electronics still some delays
  • Manas chip Indian company at Shandigarh and
    packaging in Singapore. Samples to be tested
    arrived last week. A special group of 2 people
    has been appointed to follow up and help (and
    travel)
  • Manu (card supporting Manas) a lot of
    administrative delays in France

4
Status III
  • Tracking has been reorganized to fit with
    production phase H. Borel sub-project leader

5
GMS
  • Optical lines
  • Links between stations BCAM
  • Links between chambers PROX
  • Links between chamber 9 and walls BCAM
  • Control of plans BCAM
  • Optical devices on platforms

6
GMS status
  • Integration of lines through ST 3-4-5 passage of
    coil supports done
  • Integration of lines through ST 1-2-3 setup
    between FA and ST 1 done
  • Integration of lines toward walls April 2005
  • Testbench 1 for method of platform alignment
    done
  • Testbench 2 for temperature effect study ready
    in September 2005
  • First drawings ready in March 2005
  • Realisation of the mechanics starting in April
    2005
  • Installation starting in October 2005 (6 months)
  • BUT still not totally financed (France has not
    yet given a pledge on all CtC)

7
Conclusion
  • Detectors on schedule
  • Tracking electronics is late
  • Assembling and storage space is becoming an
    urgent problem