City of Santa Monica Green Building Ordinance - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

City of Santa Monica Green Building Ordinance

Description:

New Construction Plan Check / Permit process, Demonstration of Irrigation system operation. Retrofits irrigation system work requires plumbing permit ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 12
Provided by: gregr8
Category:

less

Transcript and Presenter's Notes

Title: City of Santa Monica Green Building Ordinance


1
City of Santa Monica Green Building Ordinance
  • City Council Meeting
  • April 8, 2008
  • Susan Munves
  • Energy Green Building Program Administrator

2
Summary
3
Energy Efficiency Requirements
4
LEED Grant Program
5
Landscaping Changes
  • Provide mechanism for enforcement of water
    conservation regulations during irrigation
    installation and retrofits.
  • Clarify definitions (high water use, hydrozoning,
    irrigation system, landscaping)
  • No sprinkler irrigation within 18 inches of
    hardscape
  • Maximum precipitation rate of 0.75 inches / hour
  • 20 turfgrass limitation
  • Installation costs the same as a traditional
    system
  • Annual Savings
  • 50,000 gallons of water
  • 400 pounds of yard waste
  • 60 hours of maintenance labor
  • 200 in water/sewer alone

6
Landscaping Changes
  • Enforcement
  • New Construction Plan Check / Permit process,
    Demonstration of Irrigation system operation
  • Retrofits irrigation system work requires
    plumbing permit
  • Enforcement based on permanent irrigation system,
    not plantings
  • Planting changes may be difficult to enforce, but
    as long as permanent irrigation system standards
    are enforced, water conservation benefits are
    still significant (e.g. hand watering)
  • Mechanism addresses both Efficiency (irrigation
    performance) and Total Use (planting irrigation
    needs).

7
Examples
8
Examples
9
Examples
10
Examples
11
CD Waste proposal
  • Broad changes remain 65 diversion, exclude
    inerts
  • No Change proposed for New Construction
  • Changes only proposed for Demo-only permits
  • No minimum trigger (current 1000 sf)
  • Security 1 per square foot
  • Small Demo projects not a high value, but
    they create lots of waste
Write a Comment
User Comments (0)
About PowerShow.com