AMS2 JCrate TopLevel DAQ Computer Status at CSIST

Description:

Almost all parts are ready for flight acceptance test except JSBC and new JBUX. After JSBC is ready, we will test one FM set first for AMS-02 integration. ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 5
Provided by: YWB
Category:

less

Transcript and Presenter's Notes

Title: AMS2 JCrate TopLevel DAQ Computer Status at CSIST


1
AMS-2 J-Crate (Top-Level DAQ Computer) Status
at CSIST
  • Wei-Ping Yang -CSIST
  • Jul.4Jul.7, 2006

2
Remaining Tasks for J-crate FM
  • Re-Make JSBC F6 and burning RHROM
  • JBU FPGA areas have been coated
  • JBP
  • 3 JBP (1FM2FS) PCA , coating process and PCB ESS
    have been finished
  • JHIF
  • Broken sleeves of JHIF 94001F has been repaired
    by Dr. Chu
  • Functional test pass by MIT/CERN and return to
    CSIST
  • J-crate mechanics
  • Assembly (with JBP) and inspection by MIT and
    CSIST
  • CSIST has prepared hanging cards for each box
  • J-crate FM control documents
  • Board control documents are maintained by Dr. Cai
  • Crate control documents are maintained by Justin
    Yen

3
Summary of J, JT, JPD FM/FS Status
  • We will produce and qualify two sets of JJT
    JPD.
  • Almost all parts are ready for flight acceptance
    test except JSBC and new JBUX.
  • After JSBC is ready, we will test one FM set
    first for AMS-02 integration.
  • The second FM set will be made with JBUX.
  • Then the first FM J-crate will be qualified with
    JBUX.
  • Cables will be assembled from next week

4
JJTJPD schedule
OCT.6 and OCT. 10 are CSIST Holidays. When is the
next CSIST TEM?