Scope Page 2 1 - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Scope Page 2 1

Description:

... the inspection report, updates carrier summary information, computes carrier ... Carrier Internet Browser / web-based front end for TransPort system ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 16
Provided by: JDHa
Category:
Tags: inspection | page | scope

less

Transcript and Presenter's Notes

Title: Scope Page 2 1


1
S1 Welcome and Introduction S2 Model Deployment
State CVISN System Design S3 System Design
Guidelines/ Pre-Work Review S4 Panel
Discussion S5 Safety Information
Exchange S6 Credentials Administration S7 Conforma
nce Assurance Process/Questions S8 Electronic
Screening S9 Scope Workshop Recap S10 Work
Session Consultation S11 State
Presentations S12 Feedback and Next Steps
Session 2 Model Deployment State CVISN Design
2
Goals for Arizona CVISN Project
  • Improve customer service by reducing redundancy
    and paperwork for both motor carriers and state
    CVO agencies
  • Collect safety inspection and Accident data
    electronically from the roadside and upload to
    SAFETYNET
  • Provide electronic application and credentials
    issuance capabilities to motor carriers and
    service bureaus in the following areas
  • International Registration Program (IRP)
  • International Fuel Tax Agreement (IFTA)
  • Intrastate vehicle registration
  • Oversize/overweight permitting

3
Goals for Arizona CVISN Project (cont.)
  • Develop an interface between state systems and
    the IRP Clearinghouse
  • Develop an interface between state systems and
    the IFTA Clearinghouse
  • Provide electronic clearance at a limited number
    of fixed and mobile sites
  • Use dedicated short range communications (DSRC)
    and Variable Message Signs (VMS) at roadside
    inspection facilities to electronically identify
    vehicles and motor carriers for verification of
    safety information

4
Key Features of Arizona CVISN Design
  • Integrated CI/CVIEW Installation
  • Implement Electronic Screening and
    Weigh-In-Motion at eight Weigh Station Facilities
  • WEB access to process Tax, Registration, and
    Permit transactions for Carriers and ADOT
    officials
  • Replace IFTA Legacy System
  • Implement PRISM for Safety rating information
  • Automated applications for Safety and Accident
    reporting.

5
Arizona CVISN System Design Template
6
Arizona Operational Scenario Record Inspections
7
AZ Record Inspections
8
AZ Carrier to State Interfaces
9
AZ Carrier to State Interfaces
10
AZ Interfaces among State Systems
11
AZ Interfaces among State Systems
12
AZ State System Interfaces
13
Arizona State Interfaces with CVISN Core
Infrastructure
14
Arizona Physical CVISN Design
15
Arizona Summary of System Changes
16
Arizona Summary of System Changes
17
Arizona Major Actions, Decisions, and Issues
  • Actions
  • Have contracted WIM project, just getting
    underway.
  • Decisions
  • Will Replace TARGATS with IFTA vendor software.
  • Issues
  • CVIEW, xCVIEW, or PreVIEW
  • PRISM Build vs. Buy

18
Completion of Arizona Workshop Presentation Than
k You
Write a Comment
User Comments (0)
About PowerShow.com