Saint Catherine of Siena Facilities Study Group - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Saint Catherine of Siena Facilities Study Group

Description:

a Parish Program study which identified the space and time ... FEASIBILITY STUDY RESULTS, cont'd Each of the three concepts, which include major work on the ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 19
Provided by: ILR278
Category:

less

Transcript and Presenter's Notes

Title: Saint Catherine of Siena Facilities Study Group


1
Saint Catherine of SienaFacilities Study
Group
  • REPORT TO PARISH COMMUNITY
  • OCT 28 NOV 2, 2008

2
PRESENTATION OUTLINE
  • ? Getting Started
  • gt Facilities Study Group Action Plan
  • gt Objective
  • ? Information Gathering
  • gt Development of Parish Program Plan
  • gt Condition Survey Feasibility Study Results
  • ? Where do we go from here ?
  • gt Cost and Program-Sizing Options
  • ? Parishioner Participation
  • gt Questions, Comments and Reactions

3
GETTING STARTED
4
ACTION PLAN DEVELOPED BY FACILITIES STUDY GROUP
  • The FSG action plan included three studies
  • gt a Parish Program study which identified
    the space and time
  • usage needs of currently active and
    planned programs and
  • activities
  • gt a Condition Survey which identified
    probable costs to alleviate
  • conditions (maintenance code
    etc.) requiring attention in
  • 2 to 10 years and
  • gt a Feasibility Study which determined
    the reasonableness of
  • accommodating the recommended
    program activities AND the
  • probable costs of
  • 1) renovating all or a portion of the
    existing structure AND/OR
  • 2) constructing new space to fit the program

5
FACILITIES STUDY GROUP OBJECTIVE
  • The development of a facilities plan which is
    both
  • ? adequate to effectively and efficiently support
    the liturgical, educational, faith formation,
    social, community service / outreach and
    administrative activities of the parish, and
  • ? affordable for the parish membership to support
    the capital costs required for the renovation /
    construction phase and the maintenance phase for
    the lifetime of the facility.

6
INFORMATION GATHERING
7
PARISH CENTER PROGRAMMATIC NEEDS
  • Parish Center Program Needs
  • gt additional small large meeting rooms
  • gt a mixture of private shared staff
    offices w/ workstations
  • gt more flexibility in scheduling seminars,
    classes, meetings, etc.
  • gt larger service kitchen appropriate
    equipment
  • gt interior connections to meeting rooms,
    staff offices, etc.
  • gt privacy in / around chapel, offices and
    lounges
  • gt larger space for social, educational,
    liturgical and other activities

8
CHURCH PROGRAMMATIC NEEDS, contd
  • Church Program Needs
  • gt Greeting gathering space (narthex) located
    adjacent to
  • the Church serves as the
    primary entryway to Church
  • gt more than one restroom is needed
  • gt larger (and possibly relocated) family crying
    room
  • gt more visible baptismal font with capability
    for the immersion
  • of adults
  • gt storage space for music other program
    materials

9
CONDITION SURVEY RESULTS
  • Physical Condition of Parish Center Church
  • gt For Immediate Action --- carbon monoxide
    monitoring in Church
  • and interim roof repair in Parish
    Center large lounge
  • gt Significant deferred maintenance on Parish
    Center Church roofs
  • gt Both heating / ventilating systems Church
    A/C system are at the end
  • of their life cycles will likely
    need replacement by 2010
  • gt Building obsolescence due to progressive
    energy, code and safety
  • standards
  • gt Required Occupancy Code review changes for
    Parish Center
  • e.g., the number of rest rooms lack of
    ADA-approved rest rooms
  • gt Safety and egress problems for Parish
    Center
  • gt West wall Parish Center windows are in
    poor condition

10
CONDITION SURVEY RESULTS, contd
  • Minimum Project Costs
  • These are rough project cost estimates taken
    from the Condition
  • Survey Report with soft costs added to
    provide a total. Soft
  • costs include Architecture / Engineering
    fees Furniture, Fixture
  • Equipment costs, etc.
  • gt Church building --- Roof HVAC replacement
    750,000
  • gt Parish Center --- Roof HVAC
    replacement 700,000
  • Includes only roof, HVAC and minor ADA
    / code changes
  • Does not include window
    replacement, major interior wall changes or
  • major code changes (residential
    to assembly code use) addition of rest
  • rooms electrical, plumbing,
    kitchen, lighting, flooring or sound-proofing
  • upgrades etc.

11
FEASIBILITY STUDY RESULTSFOR PARISH CENTER
CHURCH
  • Concept 2 Narthex attached to Church not
    attached to Parish
  • Center accommodation of
    full parish activities
  • program within a
    renovated, expanded Center
  • Concept 7 Narthex attached to both the Church
    Parish Center
  • accommodation of full
    parish activities program
  • in a new, expanded Parish
    Center located in two
  • building wings flanking
    the west-facing main entrance
  • to the narthex
  • Concept 8 Narthex attached to both Church
    Parish Center
  • accommodation of full
    parish activities program
  • in a new, expanded Parish
    Center located in two-story
  • north wing adjacent to a
    narthex

12
FEASIBILITY STUDY RESULTS, contd
  • Concept 8 was preferred
  • 1) accommodates existing planned parish
    programs
  • 2) an 18,000 SF Parish Center including
    private shared staff
  • offices a 3,600 SF reception hall
    expanded kitchen chapel
  • areas and large small meeting and
    lounge rooms, etc. AND
  • 3) a greeting and gathering space (narthex) of
    1,600 SF
  • Additional benefits of Concept 8 during
    construction
  • 4) allows use of the existing Parish Center
  • 5) eliminates the dollar people-time cost
    of identifying,
  • scheduling and relocating to
    alternative program spaces
  • 6) keeps staff and volunteers on campus

13
FEASIBILITY STUDY RESULTS, contd
  • gt Each of the three concepts, which include
    major work on the
  • parish center, church and narthex, will cost
    at least 6.25M
  • gt HOWEVER this level of project cost could be
    beyond the
  • capability for the parish community to
    support, given the reduction
  • in the number of parishioners
  • gt It is important to note that the charge to the
    Facilities Study
  • Group was to research the current status
    future use of
  • parish buildings within the context of the
    parish program.
  • No decision has been made on a specific
    design concept,
  • capital cost or renovation amount to expend.

14
WHERE DO WE GO FROM HERE ?
15
COST PROGRAM-SIZING OPTIONS
  • A) Minimum Cost Option -----
    1,500,000
  • Church Parish Center roof and HVAC
  • replacement minor ADA/code issues
  • other necessary expenditures related
  • to the work noted above
  • B) Full Parish Program Option -----
    6,250,000
  • Construction of Narthex and new Parish
  • Center connected to Church Church
  • roof HVAC replacement safety
  • other code issues
  • C) The Somewhere-in-Between Option
    (refer to
  • next slide)

16
COST PROGRAM-SIZING OPTIONS, contd
  • C) Somewhere-in-Between Options
  • gt The costs for these mid-range options
    would depend on
  • which and how many of the
    programmatic space needs are
  • either down-sized, deleted or
    combined with other parish
  • program activities
  • gt Further decisions regarding these
    mid-range options vs.
  • programmatic space needs are the
    responsibility of the Pastoral
  • Council
  • Examples What would be the impact on cost
    program if one
  • or more of the following changes were
    made in the program plan?
  • 1) delete the narthex ?
  • 2) delete the choir rehearsal room ?
  • 3) combine the narthex large social gathering
    space ?
  • 4) delete the chapel space planned for the
    center ?

17
COST PROGRAM-SIZING OPTIONS, contd
  • More Examples
  • 5) reduce the number of planned meeting
    rooms by 25?
  • by 33? by 50?
  • 6) for Concept 8, locate lower half of 1st
    floor underground
  • thus reducing the cost of a
    2-story building to 1-1/2 story
  • 7) the existing Parish Center was renovated
    --- BUT the Center
  • square footage was either
  • a) not increased beyond the current
    size OR
  • b) increased to a square footage
    appreciably less
  • than the program
    target of approx 18,000 SF?
  • 8) a new Parish Center was constructed,
    similar in size to the
  • existing center demolish the
    existing center
  • 9) the construction / renovation plan
    was segmented and
  • phased over a multiple year
    period?

18
PARISHIONER DISCUSSION AND INPUT
Write a Comment