Title: Saint Catherine of Siena Facilities Study Group
1Saint Catherine of SienaFacilities Study
Group
- REPORT TO PARISH COMMUNITY
- OCT 28 NOV 2, 2008
2PRESENTATION OUTLINE
- ? Getting Started
- gt Facilities Study Group Action Plan
- gt Objective
- ? Information Gathering
- gt Development of Parish Program Plan
- gt Condition Survey Feasibility Study Results
- ? Where do we go from here ?
- gt Cost and Program-Sizing Options
- ? Parishioner Participation
- gt Questions, Comments and Reactions
-
3GETTING STARTED
4ACTION PLAN DEVELOPED BY FACILITIES STUDY GROUP
- The FSG action plan included three studies
- gt a Parish Program study which identified
the space and time - usage needs of currently active and
planned programs and - activities
- gt a Condition Survey which identified
probable costs to alleviate - conditions (maintenance code
etc.) requiring attention in - 2 to 10 years and
- gt a Feasibility Study which determined
the reasonableness of - accommodating the recommended
program activities AND the - probable costs of
- 1) renovating all or a portion of the
existing structure AND/OR - 2) constructing new space to fit the program
-
5FACILITIES STUDY GROUP OBJECTIVE
- The development of a facilities plan which is
both - ? adequate to effectively and efficiently support
the liturgical, educational, faith formation,
social, community service / outreach and
administrative activities of the parish, and - ? affordable for the parish membership to support
the capital costs required for the renovation /
construction phase and the maintenance phase for
the lifetime of the facility. -
6INFORMATION GATHERING
7PARISH CENTER PROGRAMMATIC NEEDS
- Parish Center Program Needs
- gt additional small large meeting rooms
- gt a mixture of private shared staff
offices w/ workstations - gt more flexibility in scheduling seminars,
classes, meetings, etc. - gt larger service kitchen appropriate
equipment - gt interior connections to meeting rooms,
staff offices, etc. - gt privacy in / around chapel, offices and
lounges - gt larger space for social, educational,
liturgical and other activities -
-
8CHURCH PROGRAMMATIC NEEDS, contd
- Church Program Needs
- gt Greeting gathering space (narthex) located
adjacent to - the Church serves as the
primary entryway to Church - gt more than one restroom is needed
- gt larger (and possibly relocated) family crying
room - gt more visible baptismal font with capability
for the immersion - of adults
- gt storage space for music other program
materials
9CONDITION SURVEY RESULTS
- Physical Condition of Parish Center Church
- gt For Immediate Action --- carbon monoxide
monitoring in Church - and interim roof repair in Parish
Center large lounge - gt Significant deferred maintenance on Parish
Center Church roofs - gt Both heating / ventilating systems Church
A/C system are at the end - of their life cycles will likely
need replacement by 2010 - gt Building obsolescence due to progressive
energy, code and safety - standards
- gt Required Occupancy Code review changes for
Parish Center - e.g., the number of rest rooms lack of
ADA-approved rest rooms - gt Safety and egress problems for Parish
Center - gt West wall Parish Center windows are in
poor condition
10CONDITION SURVEY RESULTS, contd
- Minimum Project Costs
- These are rough project cost estimates taken
from the Condition - Survey Report with soft costs added to
provide a total. Soft - costs include Architecture / Engineering
fees Furniture, Fixture - Equipment costs, etc.
-
- gt Church building --- Roof HVAC replacement
750,000 - gt Parish Center --- Roof HVAC
replacement 700,000 - Includes only roof, HVAC and minor ADA
/ code changes - Does not include window
replacement, major interior wall changes or - major code changes (residential
to assembly code use) addition of rest - rooms electrical, plumbing,
kitchen, lighting, flooring or sound-proofing - upgrades etc.
-
11FEASIBILITY STUDY RESULTSFOR PARISH CENTER
CHURCH
- Concept 2 Narthex attached to Church not
attached to Parish - Center accommodation of
full parish activities - program within a
renovated, expanded Center - Concept 7 Narthex attached to both the Church
Parish Center - accommodation of full
parish activities program - in a new, expanded Parish
Center located in two - building wings flanking
the west-facing main entrance - to the narthex
-
- Concept 8 Narthex attached to both Church
Parish Center - accommodation of full
parish activities program - in a new, expanded Parish
Center located in two-story - north wing adjacent to a
narthex
12FEASIBILITY STUDY RESULTS, contd
- Concept 8 was preferred
- 1) accommodates existing planned parish
programs - 2) an 18,000 SF Parish Center including
private shared staff - offices a 3,600 SF reception hall
expanded kitchen chapel - areas and large small meeting and
lounge rooms, etc. AND - 3) a greeting and gathering space (narthex) of
1,600 SF -
- Additional benefits of Concept 8 during
construction - 4) allows use of the existing Parish Center
- 5) eliminates the dollar people-time cost
of identifying, - scheduling and relocating to
alternative program spaces - 6) keeps staff and volunteers on campus
-
13FEASIBILITY STUDY RESULTS, contd
- gt Each of the three concepts, which include
major work on the - parish center, church and narthex, will cost
at least 6.25M - gt HOWEVER this level of project cost could be
beyond the - capability for the parish community to
support, given the reduction - in the number of parishioners
- gt It is important to note that the charge to the
Facilities Study - Group was to research the current status
future use of - parish buildings within the context of the
parish program. - No decision has been made on a specific
design concept, - capital cost or renovation amount to expend.
-
-
-
14WHERE DO WE GO FROM HERE ?
15COST PROGRAM-SIZING OPTIONS
- A) Minimum Cost Option -----
1,500,000 - Church Parish Center roof and HVAC
- replacement minor ADA/code issues
- other necessary expenditures related
- to the work noted above
- B) Full Parish Program Option -----
6,250,000 - Construction of Narthex and new Parish
- Center connected to Church Church
- roof HVAC replacement safety
- other code issues
- C) The Somewhere-in-Between Option
(refer to - next slide)
16COST PROGRAM-SIZING OPTIONS, contd
- C) Somewhere-in-Between Options
- gt The costs for these mid-range options
would depend on - which and how many of the
programmatic space needs are - either down-sized, deleted or
combined with other parish - program activities
- gt Further decisions regarding these
mid-range options vs. - programmatic space needs are the
responsibility of the Pastoral - Council
- Examples What would be the impact on cost
program if one - or more of the following changes were
made in the program plan? - 1) delete the narthex ?
- 2) delete the choir rehearsal room ?
- 3) combine the narthex large social gathering
space ? - 4) delete the chapel space planned for the
center ? -
17COST PROGRAM-SIZING OPTIONS, contd
- More Examples
- 5) reduce the number of planned meeting
rooms by 25? - by 33? by 50?
- 6) for Concept 8, locate lower half of 1st
floor underground - thus reducing the cost of a
2-story building to 1-1/2 story - 7) the existing Parish Center was renovated
--- BUT the Center - square footage was either
- a) not increased beyond the current
size OR - b) increased to a square footage
appreciably less - than the program
target of approx 18,000 SF? - 8) a new Parish Center was constructed,
similar in size to the - existing center demolish the
existing center - 9) the construction / renovation plan
was segmented and - phased over a multiple year
period? -
18PARISHIONER DISCUSSION AND INPUT