Cleveland Innerbelt
  • Viaduct Alignment Issues

2
Questions for today
  • Why the Innerbelt?
  • Why the Viaduct?
  • Why the northern vs. southern alignment for
    Viaduct?

3
Why the Innerbelt?
  • Unavoidable infrastructure decisions
  • Bridges, pavements nearing 50th year
  • 26 bridges need rehab or replacement
  • Innerbelt carries 128,000 vehicles
  • Central Interchange, Trench among Ohios highest
    crash locations
  • Rebuild as is, or improve?

4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
Back to the Future
Region celebrated Viaducts Opening Would rue
its closing
8
Crash Summary
  • Two-mile section of I-90 comprising the Central
    Interchange and Innerbelt Trench ranks FIRST out
    of 139 freeway segments on ODOTs Freeway Hot
    Spot List.

9
Crash Summary
  • The Innerbelt has 787 crashes annually
  • That equates to two crashes a day

10
Why the Viaduct?
  • Built in 1959
  • Carries 128,000 vehicles
  • Needs a new deck
  • Requires long-term perspective of how to repair
    the Viaduct for Clevelands future

11
The Viaduct
12
(No Transcript)
13
(No Transcript)
14
Why a second bridge?
West End Slope at Pier 1
15
(No Transcript)
16
Process to Date
  • Began in 2000 with Inner Belt Scoping Committee
  • Held more than 47 public or committee meetings
  • Held hundreds of small-group meetings
  • Studied 13 alternatives
  • Spent 8 million to get to basic concept of
    project

17
Citizens, ODOTGoals
  • Intelligent renewal of infrastructure
  • Preserve neighborhoods
  • Help economy
  • Not disrupt Cleveland during construction
  • Protect the natural and human environment
  • Promote safety

18
Historic Sites
  • Protecting the
  • heritage and quality of the neighborhoods was
    deemed critical

19
Project Scope
  • New WB bridge
  • Rehab Viaduct as EB bridge
  • Improve Central interchange
  • Improve Trench
  • Add frontage roads

20
TRAC Approved
  • 700 million for Innerbelt including
  • New Viaduct
  • Improvements on I-77 south of Viaduct
  • Improved Central Interchange
  • Mid-Town safety, capacity improvements
  • Rebuilt Innerbelt Curve

21
TRAC Also Approved
  • 50 million for West Shoreway
  • 5.3 million to plan Opportunity Corridor
  • 2.6 million for Cuyahoga Valley Intermodal
    Corridor
  • 10.5 million for Quigley Connector
  • Sen. Voinovich secured another 104 million for
    Viaduct

22
Why the Northern Alignment?
  • Primary concern of protecting Tremont
  • Wanted alternative with least impact upon
    diverting traffic to residential streets during
    construction
  • Least impact on motorists
  • Cost

23
West End
East End
24
Tremont picture
25
Tremont picture
26
Tremont picture
27
ExistingAlignment
28
ModifiedSouthernAlignment
29
ODOTsNorthernAlignment
30
Why not the Southern Alignment?
  • Push into Tremont on south
  • Either take or impinge upon Greek Church of the
    Annunciation
  • Take Sokolowskis
  • Or, build on existing location and close
    Innerbelt for two years or more
  • Closure equals neighborhood gridlock

31
Central Interchange Impacts
  • Extended closures of ramps into downtown
  • Plans calls to depress, or sink them
  • Would cut off I-77, 9th, 14th, 22nd ramps
  • Plan to eliminate loops ramps to free land is
    impractical and unsafe

32
(No Transcript)
33
Signature Bridge Concern
  • All new major bridges are signature bridges
  • ODOT is building four signature cable-stayed
    bridges right now

34
Maumee River Crossing, Toledo
35
Portsmouth, Ohio
  • Portsmouth

36
Ironton, Ohio
37
Ironton at night
38
Pomeroy Mason Bridge
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
Dodge Island Bridge
43
(No Transcript)
44
The Skyline is Important
  • Consideration of setting, appearance will be key
  • Citizen input is needed
  • ODOT has had success in Toledo and elsewhere

45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
A city of bridges
  • The new bridge will join a family of notable
    structures

50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
(No Transcript)
55
Conclusion
  • ODOT recommends northern alignment
  • Has less impact on Tremont
  • Has less impact on region during construction
  • Significantly cheaper
  • ODOT will build a signature bridge, with
    community input

56
Thank you
  • Questions?