Ontarios Permit to Take Water Program

Description:

Water is taken directly from the Great Lakes or connecting channels ... There is a high density of permitted takings in a given area. Reporting ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 16
Provided by: Sim4169
Category:

less

Transcript and Presenter's Notes

Title: Ontarios Permit to Take Water Program


1
  • Ontarios Permit to Take Water Program

Presented to Walter Duncan Gordon
Foundation Munk Centre Program on Water
Issues January 20, 2006
2
Legislation
  • Ontario Water Resources Act
  • Water Taking and Transfer Regulation (O. Reg.
    387/04)
  • Permit to Take Water (PTTW) Manual

3
General Exemptions
  • Taking lt 50,000 L per day
  • Works installed before March 29, 1961
  • Ordinary household purposes
  • Direct watering of livestock or poultry
  • Firefighting

4
Permit Classification
  • Category 1
  • Low risk
  • Renewals of existing permits
  • No scientific assessment
  • Category 2 3
  • Higher risk
  • Most new and increased takings
  • Evaluation by qualified person

5
Permit Approval
  • Director must consider
  • Need to protect natural functions of the
    ecosystem
  • Water availability
  • Water use
  • Other issues

6
Permit Approval
  • Natural Functions of the Ecosystem
  • Minimum stream flow
  • Habitat dependant on flow or water level
  • Ground and surface water inter-relationships

7
Permit Approval
  • Water Availability
  • Water balance
  • Existing planned uses
  • Location in high use or medium use watersheds

8
Permit Approval
  • Water Use
  • Conservation measures in place
  • Purpose of the water taking

9
High Use Watersheds
  • Applications to remove water from the watershed
    shall be refused if theyre for
  • Beverage manufacturing
  • Fruit vegetable canning or pickling
  • Ready-mix concrete manufacturing
  • Aggregate processing (if forming a slurry)
  • Product manufacturing (if gt50,000 L per day)

10
High Use Watersheds
  • Unless..
  • An existing permit is renewed
  • Applicant is a municipality
  • Water is taken directly from the Great Lakes or
    connecting channels
  • Purpose is the manufacture of pulp and paper or
    ethanol

11
(No Transcript)
12
(No Transcript)
13
Water Conservation
  • Water Conservation Schedule
  • Required with all new applications
  • Must include
  • All water conservation best management practices,
    and how/when they will be applied
  • Sources of information used to develop BMPs

14
Cumulative Impacts
  • Director can initiate an assessment of a group of
    takings on water balance and sustainability when
  • Low water conditions have been declared in 2 of
    the past 5 years
  • Significant decline in hydraulic head has
    occurred over the past 5 years
  • Watershed is high or medium use
  • There is a high density of permitted takings in a
    given area

15
Reporting
  • Every permit holder will be required to record
    and report the actual volume of water taken daily
  • This requirement is being phased in over 3 years