HERA recommissioned after long shut down without too many unpleasant surprises ... the IR vacuum with beam thereby troubler shooting RF and Damping systems ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 8
Provided by: DESY150
Category:

less

Transcript and Presenter's Notes

Title: HERA Status F' Willeke, DESY


1
HERA Status F. Willeke, DESY
  • HERA-Experiments Collaboration Meeting
  • September 10 2003

2
Commissioning
  • HERA recommissioned after long shut down without
    too many unpleasant surprises within planned time
  • Beams in both accelerators injected and
    accelerated
  • Machine physics program carried out
  • Spent last 3 weeks by conditioning the IR vacuum
    with beam thereby troubler shooting RF and
    Damping systems

3
(No Transcript)
4
Development of dynamic Pressure in the IR NR
5
Released Gas Load from GO/GG
  • H1 July 2002 from 40K 5 x 10-2
    mbar l
  • H1 Nov 2002 from 120K 2 x 10-3 mbar
    l
  • H1 Aug27 2003 from 40K 8 x 10-3 mbar l
  • H1 Sept04 2003 from 40K 4 x 10-3 mbar l