RF Stability Requirements in ILC: Instrumentation Issues - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

RF Stability Requirements in ILC: Instrumentation Issues

Description:

Transverse deflecting (crab) structures. Single pulse triggering. Cavity Beam ... 0.2 for undamped e 5 MeV .005 TTF 20 MeV. 200. 10. 5000. eV ~ 1.6 L P ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 11
Provided by: mcr966
Category:

less

Transcript and Presenter's Notes

Title: RF Stability Requirements in ILC: Instrumentation Issues


1
RF Stability Requirements in ILC
Instrumentation Issues
  • Marc Ross
  • LLRF Meeting
  • 17-Feb-2006

2
Instrumentation
  • Cavity BPMs
  • S-band for linac
  • X/C band for BDS
  • L-band for SCRF HOM
  • Buttons for DR
  • Lasers
  • Transverse deflecting (crab) structures
  • Single pulse triggering

3
Cavity Beam Position monitor
  • 1000 ? large compared to existing installations
  • Good LO phase
  • Excellent clock

4
(No Transcript)
5
Integration is the key
  • Transverse structures may be in the middle of
    nowhere with minimal RF infrstructure
  • Example
  • TTF VUV FEL S-band deflection system
  • 80 meters of open waveguide

6
Instrumentation
  • Example
  • Deflecting cavity, like the TTF S-band LOLA
    structure
  • Warm, 2856 MHz, single bunch from within a train,
    20MV peak, 100KeV/100 um, 10x nominal divergence
    at TTF, s_z/(?/2p) 1e-4 ?0.1deg, short pulse
    (1us)

7
S-band deflectors
200 10 5000
  • 0.001 for the BC, ? 1MeV ok
  • 0.2 for undamped e ? 5 MeV
  • .005 TTF ? 20 MeV

The size of this gives an indication of the
required phase stability
eV 1.6 L vP
8
Mode-locked Laser wire
  • High Q, feedback stabilized needs excellent RF
    source (100 MHz)
  • Locked to 1300, resynchronizable
  • (TTF 54 MHz)

9
Valerie Ayvazyan, TTF
10