Title: Asia Urbs Dutangs Residence Revitalizing by Restoring
1Asia UrbsDutangs Residence Revitalizing by
Restoring
2 Wenzhou
3 Wenzhou
4 Approching the village
5The Village
6 Towards the Dutang Residence
7Outside of the main entrance were accumulated the
wood elements for covering. (Working yard must be
delimited in a better way especially for safety).
8Other materials accumulated inside the working
yard (material for covering and recovered wood
pieces)
9Workers hanging up Welcome messages.
10View of working yard even inside than outside
workers used Devices Protection Individual
(helmet, gloves and shoes)
11On left and fore part of the residence, the work
was going on here the wood structure.
12The centrl part of the Residence was already
covered.
13Wood structure particulars in fore area of the
Residence.
14All the recovered pieces from the old structure
have been numerated and moved under the recovered
covering, where old restores made the restoring.
15Residence side area not interested at the
restoring yet.
16Residence back area where wood pieces were
restored.
17Ancient axe masters were using traditional
instruments in their working they still respect
the former techniques.
18Each piece was shaped according to the
necessities.
19Each piece was shaped according to the
necessities.
20Each piece was shaped according to the
necessities.
21Cartoon shapes of the elaborate shelves were
hanged up to the columns.
22Restored pieces were located in original
location will be important suggest them that
they have to show on the project which are the
original and the substituted pieces.
23View from the inside the new structure must be
different from the original to allowed a correct
reading of the opera.
24Old beam accumulated, ready to be used. Some come
from the Residence, other from the different
buildings.
25On the project is important to show the
substitutions made with ancien material.
26Carpenter on working
27Carpenter on working
28Some substituted parts (maybe they could try to
consolidate the origianal parts).
29Some substituted parts (maybe these parts were
missing).
30Particular of the substituted pine-tree part. The
interventetion is too radical only the capital
is original.(maybe wood pieces were missing)
31In the opposite twin has been substituted only
the capital.
32Internal subdivisions building particulars
33Beam particular thats shows a serious xilofagi
insects aggression Its basic to carry out a
special anti-parasite treatment
34Another beam particular with a massive xilofagi
insects aggression
35Paper stripes stratified inside the boarding
tamponades they are typical of revolution
time.We suggest to preserve these papers
36Particulars of the inscriptions on paper
37Pulled away zones must be re-located they have
to consider if to finish or not the missing
inscription.
38Internal areas have been reconstracted with
bamboo canes structures suitable for the coat
plaster.
39Same interventation some particulars
40A worker is preparing bamboo stripes.
41Wall inscriptions particular on the internal
courtyard wall.
42Particular same wall (its not necessary remove
it completely, it only must be integrated in
missing parts)
43Fore side area the wood structure is
rebuiltlittle walls for basement under
construction
44Same area particular
45Internal part of the wood structure it will be
tamponaded by the walling (a coat of pitch will
be spread on it guarantees impermeability and
protection against humidity and biological
aggressions (mould and insects)
46Fore side area the wood structure is rebuilt
little walls for basement under construction
47Details during workbrick operation
48Details during workbrick operation (the base of
the mix is lime grassello and the adding of
cement is debatable). Beside the medley with
cement is recognizable, its darker)
49Details during workbrick operation tub for
containing the lime.
50Details during workbrick operation
51Former walling particular
52Details during workbrick operation
53Town-wall under construction particular.
54Left side areaits not involved in restoring
activity
55Details portion of the roof during the restore
56Detailinternal roof portion restored interno
della copertura già risanata strutturalmente,
(olny canes tamponades missing))
57Central portion of the roof restored
58Photograph in front of the workyard.
59The group in front of the poster of Asia Urbs
project
60Meeting after the visit at the workyard
61Meeting after the visit at the workyard
62After some hours the project cames executive
projects.
63Some project details
64Lively discussiion on the project with the
engeneer and the enterprise
65Project on the tablesexplainations
66Land surveyor enterprise explanations
67Elucidations of the land surverìyor
68Meeting details
69End of the intensive day. Ready to leave for
Vietnam to see other projects.