Title: Laboratory and Field testing
1Laboratory and Field testing
João Mendes
2Summary
- Sample preparation
- Compaction
- Wetting and drying procedure
- Field instrumentalization
3Laboratory testing
- Compact samples
- Measure initial suction
- Wet/dry to required water content and measure new
suction - Consolidate
- Shear
4Bionics Soil - Sample Preparation
Air drying to atmosphere
20mm Sieve
2.80mm Sieve
Oven drying
Preparation of 4 bags with 1000g of soil each
Addition of water to the desired water content
Period of equalisation of 24 hrs
Compaction
Determination of final water content
5Bionics Soil - Sample Preparation
- Water content determination
- - 6 layers (1 to 6)
- - 3 zones
- - outer ring
- - middle ring
- - core or center
6Bionics Soil - Sample Preparation
Initial water content 22 Final
average21.7 Sieved material 2.80mm
Note positon axis - 1 correspond to the outer
ring 2 for the middle ring and 3 represents the
core of the layer
7Bionics Soil - Compaction
- British Standard procedure BS-1377
- Light compaction hammer (2.5 kg)
- Heavy compaction hammer (4.5 kg)
- Differing
- Height of 200 mm
- Number of layers 6 instead of 3
- Total number of blows 276 instead of 273
- Sieve 2.80 mm
-
8Bionics Soil - Compaction
- Compaction curves
- BS light compaction (BSL 100)
- BS heavy compaction (BSH 100)
- BS light compaction 200mm (BSL 200)
- BS heavy compaction 200mm (BSH 200)
- BS light compaction 200mm recycled (BSL 200 R)
- BS light compaction 200mm/2.80mm sieve (BSL 200
S) - BS light compaction 200mm/2.80mm sieve recycled
(BSL 200 SR)
9Bionics Soil - Compaction
Sr 100
10Bionics Soil Wetting procedure
- Samples compacted with the proctor light hammer
- Humidification provided by the humidification
chamber - Equalisation for two weeks or more
- Wraped in cling film
- Final water content determination
11Bionics Soil Wetting procedure
- Humidification chamber
- Reservoir with distiled water
- 2 mini foggers
12Bionics Soil Wetting procedure
(Test 1)
(Test 3)
(Test 2)
13Bionics Soil Wetting procedure
Original material Equalisation time 2
weeks Initial water content 15 Final
average19.8 Horizontal variation 1 Vertical
variation 3.5
Note in the positon axis - 1 correspond to the
outer ring 2 for the middle ring and 3
represents the core of the sample
14Bionics Soil Wetting procedure
Sieve material Equalisation time 2
weeks Initial water content 15 Final
average19.1 Horizontal variation
1.5 Vertical variation 2.5
15Bionics Soil Wetting procedure
Original material Equalisation time 2
weeks Initial water content 15 Final
average19.1 Horizontal variation
0.5 Vertical variation 1
16Bionics Soil - Drying Procedure
- Samples compacted with the proctor light hammer
- Air drying to atmosphere until it reaches desired
water content (usually 5-7 days) - Equalisation
- Wraped in cling film
- Final water content determination
17Bionics Soil - Drying Procedure
18Bionics Soil - Drying Procedure
19Field Instrumentalization
- Field equipment
- 2 borehole probe locators with 5 probes each
- 10 tensiometers
- 10 plugs
- Logger
- Computer
- Power source
- 100 meters cable
- Saturation vessel.
20Field Instrumentalization
- Not ready
- 2nd borehole probe locator
- Logger
- Tensiometers (saturation and calibration
undergoing).
21Field Instrumentalization
- Suction Measurement of the bentonite mixture
22Field Instrumentalization
23Field Instrumentalization
Bentonite mix
Soil
Soil
Bentonite mix
24Field Instrumentalization