HICCUPS AND COMMON ERRORS IN STRATA TITLE - PowerPoint PPT Presentation

1 / 72
About This Presentation
Title:

HICCUPS AND COMMON ERRORS IN STRATA TITLE

Description:

All instances taken from my experience as Accredited Certifier-Strata ... Changes from the DA plans used for pre-construction draft Strata Plans. Walls. Balconies ... – PowerPoint PPT presentation

Number of Views:195
Avg rating:3.0/5.0
Slides: 73
Provided by: gordo95
Category:

less

Transcript and Presenter's Notes

Title: HICCUPS AND COMMON ERRORS IN STRATA TITLE


1
HICCUPS AND COMMON ERRORS IN STRATA TITLE
  • PREPARED BY
  • GORDON WREN
  • FOR ISNSW TWILIGHT SEMINAR
  • MAY 2002

2
Where are my comments coming from?
  • These comments are not from theoretical musings
  • All instances taken from my experience as
    Accredited Certifier-Strata
  • Since Dec 2000, looked at over 80 strata plans,
    producing over 1800 lots

3
Comments relate to Strata Plans, but do not
include
  • Sec 88B instruments
  • Schedule of By-Laws
  • Strata Development Contracts
  • Strata Management Statements

4
Some areas where hiccups have occurred
  • Changes to structure by builder after draft
    strata plans prepared
  • Interpretation of DA plans
  • Development Consent conditions
  • Plan preparation

5
Changes to the structure by the builder
  • Changes from the DA plans used for
    pre-construction draft Strata Plans
  • Walls
  • Balconies
  • Carspaces

6
Walls
  • Internal walls between lots have been amended
  • Exhaust ducts moved or deleted
  • External walls changed
  • Sec 96 Modifications
  • Structures (eg courtyard walls) not constructed,
    but shown on plan

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Balconies
  • Ground floor balcony amended by builder where
    roof of carpark basement steps out
  • Shape of balcony changed

16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
Carspaces
  • Spaces swapped around
  • Visitor Spaces shown on plan

24
(No Transcript)
25
(No Transcript)
26
2) Interpretation of DA plans
  • Plans prepared by surveyor from DA plans, error
    occurred in interpreting DA plan, generally where
    no Draft Strata Plans in Council Approval (ie
    Architects plans)
  • Errors not picked up by Councils Strata Dev
    Approval
  • No Strata Consent
  • Complying Development Certificate
  • Error not picked up when final inspection was
    made

27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
3) Development Consent Conditions
  • Most common is missing restrictions and/or
    positive covenants for on-site stormwater
    detention (OSD) systems
  • Consolidation of titles
  • Road dedication splay corner
  • Also items that affect the client
  • DA but no Strata DA
  • Survey reports required during construction

35
No Strata DA
  • At my inspection, building was ready but no DA
    for Strata
  • 5 weeks to get DA from Council
  • Needed new Sec 73 Certificate, only 1 week delay
  • All up, delayed client by 6 weeks

36
SC057 consent 73
37
4) Plan preparation
  • Incorrect Plan Form 1 (Strata Certificate doesnt
    show accredited certifier)
  • Missing or incorrect information

38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
(No Transcript)
55
(No Transcript)
56
(No Transcript)
57
(No Transcript)
58
(No Transcript)
59
(No Transcript)
60
(No Transcript)
61
(No Transcript)
62
(No Transcript)
63
(No Transcript)
64
(No Transcript)
65
(No Transcript)
66
(No Transcript)
67
(No Transcript)
68
(No Transcript)
69
(No Transcript)
70
(No Transcript)
71
Possible Remedies
  • Always insist on a copy of the Development
    Consent
  • Prior to final inspection, ask the builder/client
    whether any Sec 96 modifications were made
  • When you make your final inspections, ensure the
    structures shown on your Strata Plan have been
    constructed