KLM - Operations at Schiphol: how does ASAS fit? - PowerPoint PPT Presentation

About This Presentation
Title:

KLM - Operations at Schiphol: how does ASAS fit?

Description:

Growth versus environmental constraints, need for fixed routes and enhanced arrival management. ... Cros regional ATM Pilots. AMS Airport CDM. KDC research. 5 ... – PowerPoint PPT presentation

Number of Views:439
Avg rating:3.0/5.0
Slides: 15
Provided by: asast
Learn more at: https://asas-tn.org
Category:
Tags: asas | klm | cros | fit | operations | schiphol

less

Transcript and Presenter's Notes

Title: KLM - Operations at Schiphol: how does ASAS fit?


1
KLM - Operations at Schiphol how does ASAS fit?
  • ASAS TN2 final seminar, 14-15 April, Paris
  • E. Kleiboer
  • Sr. Manager Strategy ATM

2
TOC
  • Background
  • Background KDC
  • Explain KLM role in ATM developments
  • Introduction to KDC ASAS study
  • Specific challenges Schiphol Airport
  • Growth versus environmental constraints, need for
    fixed routes and enhanced arrival management.
  • KLM View on ASAS
  • Airspace User vision Areas where ASAS could
    help
  • Decentralization separation tasks, ATCO workload,
    small deviations from optimized business
    trajectory
  • Sequencing and Merging
  • Ground maneuvering
  • Current status of the project
  • Summary / conclusions / possible next steps

3
Background KDC
  • Focuses on joint research for Schiphol mainport
    development
  • Meeting market and environmental challenges.
  • Relations / partners

http//www.kdc-mainport.nl/
4
KLM role in ATM
  • Air France / KLM only group airline registered in
    both DOW JONES SUSTAINABILITY INDEXES
  • KLM is pushing innovation in the airline industry
    further along by setting examples in innovation.
  • Active role in
  • SESAR Definition / Development phase
  • EU AIRE Initiative
  • FAB EC
  • Cros regional ATM Pilots
  • AMS Airport CDM
  • KDC research

5
KDC ASAS studyObjectives / timing
  • Launched in February 2008
  • To study if and how the Airborne Separation
    Assistance System (ASAS) could benefit the
    Schiphol concept evolution.
  • 6 Workshops addressing specific problem areas and
    ASAS functions.
  • The result should be a short list of applications
    with recommendations for a more detailed /
    focused research and focus on implementation.

6
Specific challenges Schiphol (1)
7
Specific challenges Schiphol (2)
8
Airspace User vision
  • Endorsed User Vision by all User Associations
  • Addresses also airborne decision making aids
    required to increase pilot situational awareness
    and safety and to enable the flight crew to
    provide separation under well defined conditions
    and precise division of tasks between the pilot
    and air traffic control.
  • Vision secured on SESAR Concept of Operations
  • Allowing increased ATC productivity, more
    efficient use of airspace (smaller footprint) and
    enabling aircraft to fly closer to optimum
    trajectories. It also shows potential to increase
    safety.
  • Implementation will be driven by safety /
    business cases.

9
KLM view on Schiphol benefitsOn Ground /
Departure
  • On Ground under LVC
  • Safety
  • Separation responsibility with flight crew
  • Vacation of sensitive area
  • Departure
  • Slow traffic, GS awareness

10
KLM view on Schiphol benefitsArrival
  • Peak hour capacity / Fixed routes/ CDAs
  • 4D arrival management necessary
  • SM
  • Spacing

11
Electronic Flight Bag Experience with Airport
Map Application
  • Driver reduce runway incursions risk
  • Class C s/w to aid flight crew positional
    awareness only.
  • No other traffic shown, own ship only

12
Electronic Flight BagExperience with Airport Map
Application
  • 251.000 hours / 29.000 flight cycles since EIS
    2003
  • Airport Map appreciated by pilot community
  • 25 rated excellent
  • 45 rated very good
  • No issues related to navigation
  • Improved SA
  • _at_ complex airports
  • in LVC
  • RWY Incursion prevention
  • No Air Safety Reports, meaning?

13
Next Steps
  • ADS-B Out
  • SES IR for 2015?
  • Incentives needed
  • Airport Map with traffic info and Airport Map
    with taxi routes?
  • ASAS Operational trial
  • Need for focused RD

14
Summary
  • ASAS a key enabler in SESAR Target ATM Concept
  • Supported by airlines.
  • Driven by Safety / Business cases.
  • KDC ASAS project launched in February 08.
  • ASAS could be a potential enabler for supporting
    CDAs / RNAV routes and meeting capacity /
    efficiency / safety and environmental targets.
  • Conclusions / recommendations pending
  • KLM Flight Crew
  • Positive attitude regarding new system
    capabilities and changed responsibilities.
  • Opportunity rather than threat.
Write a Comment
User Comments (0)
About PowerShow.com