MC Production Status Rachid Mazini University of Toronto PowerPoint PPT Presentation

presentation player overlay
1 / 6
About This Presentation
Transcript and Presenter's Notes

Title: MC Production Status Rachid Mazini University of Toronto


1
MC Production StatusRachid MaziniUniversity of
Toronto
  • CDF Simulation Meeting
  • Status
  • Ongoing Future production

2
Infos
  • Priority list
  • http//www-cdf.fnal.gov/internal/mcProduction/Pr
    iority 20040625 2.txt
  • Datasets
  • http//hep.physics.utoronto.ca/RachidMazini/cdf/
    cdfmcprod.html
  • for now, only completed datasets, with logfiles,
    DFC infos
  • Future requests will be added when priority list
    is done.

3
Recently 5.3.3 Completed Samples
  • Run dependant 0 Min. Bias
  • jqcd1g HERWIG dijet pT18 (5M)
  • Production completed, Concatenation in Progress
    at FNAL
  • jqcd2g HERWIG dijet pT40 (5M)
  • Production completed, Concatenation in Progress
    in Toronto
  • btop4a Low pT, b-tag scale factors (2M)
  • Completed, Dataset in DFC
  • wewkee PYTHIA W-gte? (2M)
  • Completed, Only a fraction on DFC
  • jqcdog PYTHIA Z born Term (1M)
  • Production Completed in Alberta, waiting for
    transfer concatenation.

4
Recently 5.3.3 Completed Samples
  • Run dependant 1 Min. Bias
  • ttop0v HERWIG ttbar (100K)
  • ttop1v PYTHIA ttbar (100K)
  • wtop1v PYTHIA W?e? (200K)
  • wtop2v PYTHIA W??? (200K)
  • wtop3v PYTHIA W?? ? (200K)
  • ztop1v PYTHIA Z?ee (200K)
  • ztop2v PYTHIA Z??? (200K)
  • ztop3v PYTHIA Z??? (100K)
  • All completed, Concatenation in Progress in
    Toronto

5
Recently 5.3.3 Completed Samples
  • Run dependant 2 Min. Bias
  • ttop2v HERWIG ttbar (100K)
  • ttop3v PYTHIA ttbar (100K)
  • wtop4v PYTHIA W?e? (200K)
  • wtop5v PYTHIA W??? (200K)
  • wtop6v PYTHIA W?? ? (200K)
  • ztop4v PYTHIA Z?ee (200K)
  • ztop5v PYTHIA Z??? (200K)
  • ztop6v PYTHIA Z??? (100K)
  • All completed, Concatenation in Progress in
    Toronto

6
Plans for next 5.3.3 productions
  • QCD dijet with 0 Min. Bias
  • PYTHIA dijet pT0, 10, 60, 90, 120, 150, 200,
    300. 400, 500
  • Alberta, DCAFs and Toronto 13M in total
  • Within 2 weeks from now
  • ALPGENPYTHIA bbar pT8, 20, 70
  • ALPGENHERWIG bbar pT8
  • ALPGENPYTHIA ccbar pT20, 70
  • Probably in Toronto, 2.5M CDFSIM Only
  • Waiting for HEPGs and run sections.
Write a Comment
User Comments (0)
About PowerShow.com