Steve Nunnington - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Steve Nunnington

Description:

... responded to via the Information Exchange (IX) ... Restrictions apply to the number of meter reads per MRF. Response sent by ... to set up datalogger on ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 9
Provided by: MB858
Category:

less

Transcript and Presenter's Notes

Title: Steve Nunnington


1
SPA Processes for NDM DM Sites
  • Steve Nunnington
  • Service Delivery

2
Supply Point Administration Process
  • xoserve (on behalf of GTs) manage the SPA
    process.
  • The basic concepts behind Supply Point
    Administration are
  • Driven by Shippers
  • Monitored by xoserve
  • Automated process, batch file requests received
    from Shippers into UKLink system which then
    validates generates the appropriate response.
  • Gas Transporters (via UKLink system) interface
    with Shippers to ensure the Supply Point Register
    is maintained.
  • All SPA files are issued responded to via the
    Information Exchange (IX).
  • The following slides demonstrate how this process
    operates, and the industry players that are
    involved

3
Site Set Up Process NDM Sites
Shipper/Supplier
IX
IX
IX
Email/ConQuest
Email/ConQuest
IX
UKLink
B
IX
IX
IX
IX
xoserve
Email/ConQuest
Email/ConQuest
Network
IX
IX
4
Site Set Up Process cont. NDM Sites
New Shipper/Supplier
IX
IX
B
UKLink
IX
IX
IX
Old Shipper/Supplier
IX
5
Site Set Up Process DM Sites
Shipper/Supplier
IX
email
IX
Email to NGM
IX
UKLink
B
IX
IX
IX
Xoserve/NGM
Email
email
Network
IX
IX
6
Site Set Up Process cont. DM Sites
New Shipper/Supplier
IX
IX
IX
UKLink
B
IX
IX
IX
IX
Old Shipper/Supplier
IX
7
Meter Read Loading
  • NDM
  • Shipper submits a file via IX (UMR)
  • System limit is 400,000 Meter Reads per day
  • Notional limit of 40,000 Meter Reads per day per
    Shipper
  • Meter Reads must be submitted within D10 of
    meter read date
  • Restrictions apply to the number of meter reads
    per MRF
  • Response sent by xoserve via URS file
  • Includes Rejections Accepted reads
  • DM
  • Automated Daily Reads received per datalogger by
    NGM
  • Estimated where applicable
  • Monitored maintained by a specialist team

8
Summary
  • Installation of Daily Read Equipment (DRE) is
    requested via email to NGM, manual process
  • It may be required for a dummy datalogger to be
    set up on UKLink to enable the shipper to
    nominate as DM
  • Manual process to set up datalogger on UKLink
  • Nomination Confirmation process is generally
    the same for both NDM DM IC sites.
Write a Comment
User Comments (0)
About PowerShow.com