Description:

To produce a 20-year forecast of avoidable ancillary service costs ... In lieu of sophisticated modeling, we can conclude that efficiency programs do ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 6
Provided by: brian75
Category:
Tags: cpuc | avoided | cost | modeling | run | up | workshop

less

Transcript and Presenter's Notes

Title: CPUC Avoided Cost Workshop


1
CPUC Avoided Cost Workshop
  • Reliability Multiplier

2
Objectives
  • To produce a 20-year forecast of avoidable
    ancillary service costs
  • Why not include an adder for reliability of firm
    load service?
  • Short-run avoided cost methodology assumes
    surplus
  • Long-run methodology assumes equilibrium
    condition
  • Why not include adder for planning reserve
    requirement?
  • E3 methodology already results in 15-19 margin
    (8 planned and unplanned outage rate, 7-10
    capacity for ancillary services)

3
Do efficiency programs reduce A/S costs?
  • Quantities of A/S supplied to CA-ISO vary by hour
    of day
  • In lieu of sophisticated modeling, we can
    conclude that efficiency programs do result in
    avoided incremental A/S purchases
  • May see additional effect through reduced prices

4
Historical Ancillary Service prices
  • Price range before and after crisis period
  • 5-20 per MWh of A/S supplied to ISO
  • 0.50 - 2.00 per MWh of load
  • 1 - 5 of total energy costs

5
Ancillary Services (A/S) Costs
  • Average of A/S costs as percent of total energy
    costs, during non-crisis period (8/99-5/00,
    8/01-7/03) 2.84
  • Apply 2.84 to shaped hourly energy price
  • 2004 2.84 45.57/MWh 1.29/MWh of load
  • 2005 2.84 46.65/MWh 1.32/MWh of load
  • 2013 2.84 60.00/MWh 1.70/MWh of load