Description:

If prices are different on the electrical buses at a generation site, there will ... Need to validate that current modeling supports obtaining a Resource Node price ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 11
Provided by: DT66
Category:

less

Transcript and Presenter's Notes

Title: TPTF Net Metering Discussion


1
TPTF Net Metering Discussion
  • April 11, 2006

2
PB
PA
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
Option 1 Apply Resource Node Price to net
generation of Each Generation Resource
  • Use current allocation method of determining
    generation injection into the grid (SCADA split)
  • Payment to generators based on net generation and
    Resource Node Prices
  • Netting load swapped as energy only
  • Requires Resource Node price only

7
Option 2 Apply Price Adjustment Factor (this is
the proposal from 2-7-06)
  • Use current allocation method of determining
    generation injection into the grid (SCADA split)
  • Payment or Charge for Facility based on
    generation/import and load/export at metered
    points.
  • Each generator is paid for the net generation at
    the adjusted Resource Node price.
  • Requires Meter Point price and Resource Node price

8
Option 3 Pay at the Resource Node Price and
charge costs pro rata generation
  • Use current allocation method of determining
    generation injection into the grid (SCADA split)
  • Payment or Charge for Facility based on
    generation/import and load/export at metered
    points.
  • Each generator is paid the SCADA generation at
    the resource node price and charged costs
    proportional to the generation.
  • Requires Meter Point price and Resource Node price

9
Option 1 Apply Resource Node Price to net
generation of Each Generation Resource
  • Questions identified to date
  • None
  • Concern
  • Need to validate that current modeling supports
    obtaining a Resource Node price for each
    Generation Resource in private networks.
  • Do we have details that show the electrical bus
    that generation is connected to for private
    networks?

10
Options 2 and 3 Applies Meter Point Price to
Metered Amount
  • Questions identified to date
  • What price should be utilized in settlements for
    metering that utilizes a parallel current
    transformer configuration?
  • What electrical bus should the meter be assigned
    to?
  • What is the definition for Meter Point price?
  • Concern
  • If prices are different on the electrical buses
    at a generation site, there will be a difference
    in settlements between metering utilizing a
    parallel current transformer configuration and
    those that do not utilize this configuration
  • Need to validate that current modeling supports
    obtaining a Resource Node price for generation in
    private networks.
  • Do we have details that show the electrical bus
    that generation is connected to for private
    networks?