Title: COST CONSIDERATIONS


1
COST CONSIDERATIONS
Problems 7
2
COST CONSIDERATIONS
  • TYPES OF COSTS
  • CONVERTING BETWEEN TYPES OF COSTS
  • COMPARING OVERALL COSTS

3
INTRODUCTORY COMMENTS
  • FOR ALL ENGINEERING WORK COST IS A KEY
    CONSIDERATION
  • A BENEFIT IS SIMPLY A NEGATIVE COST
  • VARIOUS TYPES OF COSTS
  • CAPITAL
  • ANNUAL
  • OPERATING
  • SALVAGE

4
INTRODUCTORY COMMENTS
  • MUST FIND A COMMON BASIS FOR COSTS TO MAKE
    SENSIBLE COMPARISONS BETWEEN ALTERNATIVES

5
TYPES OF COSTS
  • CAPITAL COSTS
  • lt FIRST COST
  • lt COST OF PURCHASING INITIAL ITEMS
  • lt INVESTMENT COST
  • ANNUAL COSTS
  • lt ONGOING, YEARLY, COSTS
  • lt MAINTENANCE
  • lt INSURANCE
  • lt REPAIRS
  • lt SALARIES

6
TYPES OF COSTS
  • SALVAGE
  • lt RESALE VALUE AT THE END
  • lt COST OF DECOMMISSIONING PROJECT
  • EQUIVALENT UNIFORM ANNUAL COST (EUAC)
  • lt COST/BENEFIT EXPRESSED AS A UNIFORM ANNUAL COST
  • lt A WAY TO COMPARE ALL COSTS ON AN EQUAL BASIS

7
CONVERTING BETWEEN COSTS
  • HOW DO YOU COMPARE SOMETHING WITH, SAY,
  • A HIGH CAPITAL COST AND LOW ANNUAL COST
  • TO SOMETHING ELSE WITH
  • A LOW CAPITAL COST AND A HIGH ANNUAL COST?

8
CONVERTING BETWEEN COSTS
  • HOW DO YOU COMPARE ...
  • CONVERT ALL COSTS TO THE SAME TYPE

9
CONVERTING BETWEEN COSTS
  • PRESENT VALUE (PV) TO A FUTURE VALUE (FV)
  • FV FROM A PV
  • EUAC OF A PV

10
FV OF A SINGLE PAYMENT
  • FV ?
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV Known
  • FOR 1 YEAR FV1 PV (1 i)
  • FOR 2 YEARS FV2 FV1 (1 i) PV (1 i)
    (1 i)
  • FV2 PV (1 i)2
  • FOR n YEARS FVn PV (1 i)n

11
FV OF A SINGLE PAYMENT
  • FV ?
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV Known
  • PAYMENT OCCURS AT THE START OF YEAR 1, COLLECT AT
    THE END OF n YEARS
  • FOR EXAMPLE PV 3000, n 15 yrs, i 10/YR
  • FV 3000 (1 0.10)15 12,531.74

12
PV OF A FUTURE PAYMENT
  • FV KNOWN
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV ?
  • PV FV / (1 i)n

13
PV OF A SERIES OF EQUAL PAYMENTS
  • A
  • A
  • A
  • A
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV ?
  • PV A / (1 i)1 YEAR 1
  • A / (1 i)2 YEAR 2
  • A / (1
    i)n YEAR n

14
PV OF A SERIES OF EQUAL PAYMENTS
  • A
  • A
  • A
  • A
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV ?
  • (1 i ) n - 1
  • PV A ----------------------
  • i ( 1 i ) n

15
PV OF A SERIES OF EQUAL PAYMENTS
  • A
  • A
  • A
  • A
  • 1
  • 0
  • 2
  • 3
  • n
  • Time
  • PV ?
  • Example A 3000/yr, n 15 years, i 10/yr
  • (1 0.10 ) 15 - 1
  • PV 3000 -------------------------- 3000
    7.606
  • 0.10 ( 1 0.10 )15
  • PV 22,818.23

16
EQUIVALENT UNIFORM ANNUAL COST (EUAC)
  • WITHIN ANY PROJECT ONE WILL HAVE ALL KINDS OF
    COSTS
  • ONE APPROACH TO ALLOW COMPARISON IS TO CONVERT
    ALL COSTS AND BENEFITS TO THE SAME TYPE OF COSTS,
    EITHER PV, FV OR EUAC AND ADD THEM UP
  • THE COST COMPARISON IS THEN MADE ON THE BASIS OF
    SIMILAR COSTS

17
EXAMPLE
18
COST CONSIDERATIONS
Problems 7