172 R2P2 - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

172 R2P2

Description:

Major Equipment and Aircraft required. Scheme of maneuver by phase. Fire Support ... XO. CO. Enclosure (1) COA Check and Adjustment. Ouputs. COA Decision ... – PowerPoint PPT presentation

Number of Views:657
Avg rating:3.0/5.0
Slides: 23
Provided by: matthewc157
Category:

less

Transcript and Presenter's Notes

Title: 172 R2P2


1
172 R2P2
MISSION ANALYSIS
COA DEVELOPMENT
COA CHECK AND ADJUSTMENT
DETAILED PLANNING
CONFIRMATION BRIEF
Enclosure (1)
2
Mission Analysis
  • Attendees Command Group, Principal Staff,
    Company COs
  • Brief
  • S-2 (S-3) Orientation, Intelligence (Enemy Sit)
  • S-3
  • ROE in effect
  • Concurrent Ops/Friendly Situation
  • HHQ Mission Statement
  • Specified/Implied/Essential Tasks
  • Constraints/Restraints/Shortfalls (S-4 inputs
    equipment piece)
  • Assumptions
  • RFIs
  • Recommended CCIRs
  • Recommended Restated Mission Statement

Enclosure (1)
3
Mission Analysis, Contd
  • CO Intent and Initial Planning Guidance
  • Intent Purpose, Method, Endstate, MOE
  • Appoint Mission Commander(s)
  • COA Guidance
  • Guidance by Warfighting Function
  • Intel, Maneuver, Fires, Logistics, C2, FP
  • S-3
  • Contingency Mission Alert Status
  • Planning Timeline
  • ID planning cell requirements

Enclosure (1)
4
Mission Analysis, Contd
  • Outputs
  • Mission Statement
  • Intent
  • Planning Guidance
  • Contingency Mission Alert Status
  • Planning Timeline
  • Planning Cell Identified
  • Warning Order
  • Assumptions
  • CCIRs
  • RFIs
  • Restraints/Constraints
  • Resource Shortfalls

Enclosure (1)
5
172 R2P2
MISSION ANALYSIS
COA DEVELOPMENT
COA CHECK AND ADJUSTMENT
DETAILED PLANNING
CONFIRMATION BRIEF
Enclosure (1)
6
COA Development
  • Planners develop broad COA using
  • METT-TSL
  • Threat and friendly capabilities
  • Methods of insertion/movement
  • Answer two fundamental questions
  • What do I want to do?
  • How do I want to do it?
  • For us, the primary planners are the S-3 (and his
    staff) and the supported (i.e. mission) commander
    and supporting commanders (or designated reps)

Enclosure (1)
7
COA Development
  • Each COA must be
  • Suitable
  • Feasible
  • Acceptable
  • Distinguishable
  • Complete
  • 1 COA is OK for us, unless the sit begs more

Enclosure (1)
8
COA Development
Mech Raid
  • Output

If there are multiple missions, this will be more
broad
Phase 3
OBJ
Phase 2
Phase 4
BLS
BLS
Phase 5
WHIDBEY ISLAND
Phase 1
Loss of 3 or
1. Mass

1. Lack of Surprise

more AAVs

2. Firepower

2. Canalized

Enemy Co or
3. Mobility

3. Logistics

greater

4. Speed





9
COA Development
  • Output
  • Graphic Depiction
  • The title of the COA
  • Table of Organization
  • Major Equipment and Aircraft required
  • Scheme of maneuver by phase
  • Fire Support
  • Estimated Timeline
  • Go/No Go Criteria
  • Advantages/Disadvantages

Does not include a COA narrative
Enclosure (1)
10
172 R2P2
MISSION ANALYSIS
COA DEVELOPMENT
COA CHECK AND ADJUSTMENT
DETAILED PLANNING
CONFIRMATION BRIEF
Enclosure (1)
11
COA Check and Adjustment
  • Roll Call
  • Identify the restated mission approved in Mission
    Analysis
  • S-2 (S-3) gives an intelligence and information
    update

Enclosure (1)
12
COA Check and Adjustment
  • COA Presentation
  • Conducted by the S-3, or Mission Commander if
    there is only one mission
  • Focused on highlights
  • Comparison and Decision
  • 1st Time the COAs are being compared against each
    other
  • Staff makes estimates of supportability, even if
    there is only 1 COA presented

Enclosure (1)
13
COA Check and Adjustment
Enclosure (1)
14
COA Check and Adjustment
  • Ouputs
  • COA Decision
  • Estimates of supportability
  • Commanders updated planning guidance for
    detailed planning
  • Mission Commander identifies his planning cell
  • Timeline Update

Enclosure (1)
15
172 R2P2
MISSION ANALYSIS
COA DEVELOPMENT
COA CHECK AND ADJUSTMENT
DETAILED PLANNING
CONFIRMATION BRIEF
Enclosure (1)
16
Detailed Planning
  • Mission Commander(s) assembles the planning cell
  • Mission Commanders guidance
  • Develop confirmation brief
  • Template slides and SOPs are critical to success
  • Digital vs. Paper

Enclosure (1)
17
Detailed Planning
  • Ouputs
  • Detailed, integrated plan
  • Small unit leaders commence briefing down chain,
    preparing equipment, pre-op checks, ammunition
    draw, staging, etc.
  • Confirmation Brief

Enclosure (1)
18
172 R2P2
MISSION ANALYSIS
COA DEVELOPMENT
COA CHECK AND ADJUSTMENT
DETAILED PLANNING
CONFIRMATION BRIEF
Enclosure (1)
19
Confirmation Brief
  • Purpose
  • Confirm the plan to the Commander
  • Ensures everyone involved understands the mission
    details
  • Ensures coordination and synchronization was
    conducted throughout the squadron and with
    supporting/supported units

Enclosure (1)
20
Confirmation Brief
  • Use a template (available from the 3)
  • Products developed throughout the planning
    process are utilized in in the confirmation brief
  • Focus on stressing the integration and
    coordination
  • Brief by exception to SOPs
  • Tell the story via pictures

Enclosure (1)
21
R2P2 Keys to Success
  • Concurrent
  • Planning occurs at all levels of the squadron
  • Parallel
  • Planning takes place between the squadron and
    supporting/supported commands
  • Conduct detailed planning from the objective out
  • Wide dissemination of outputs from each step of
    the process

Enclosure (1)
22
R2P2 Keys to Success - SOPs
  • Comprehensive SOPs at all levels
  • Specific mission profiles with pre-planned
    packages
  • R2P2 SOP
  • Standardized pre-formatted slides
  • SOPs slide into the confirmation brief
  • Comm Plans
  • Link-up Procedures
  • Accountability procedures

Enclosure (1)
Write a Comment
User Comments (0)
About PowerShow.com