Title: WG3 Presentation to SC4 Closing Plenary


1
WG3 Presentation to SC4 Closing Plenary
  • Gerald Radack, Convener
  • Valencia, Spain
  • 2005-06-17
  • 0900 1100

2
Hot Topics
  • Configuration management of modules
  • Plan of action for ISO 16792

3
ISO 16792
  • Discussed in WG3/WG12 Modules Team meeting
  • Lea Irwin of UGS, the TC10 liaison to SC4, gave a
    demonstration of 16792 annotation in I-DEAS
  • Agreed that STEP should support the data
    requirements of 16792
  • Will require updates to Integrated Resources, new
    modules
  • Agreed to form an ad hoc group to progress this
  • Exploder to be established on SC4ONLINE

4
Sessions in HangZhou
  • WG3 Plenary
  • Monday 1030 1200
  • Thursday 1530 1700
  • WG3 WG12 Modules
  • Tuesday 0800 1700

5
WG3 Teams
  • T01 Shape Representation
  • Goult, Ray J LEADER
  • T04 Materials
  • Moreno, Anna LEADER
  • Swindells, Norman DEPUTY
  • T08 Product Life Cycle
  • King, Timothy LEADER
  • U'ren, Jim DEPUTY
  • T09 Engineering Analysis
  • Hunten, Keith LEADER
  • T10 Electrical/Electronics
  • Klein, Lothar LEADER
  • Thurman, Thomas R DEPUTY
  • T19 Mechanical Products
  • Ungerer, Max LEADER
  • T22 Building and Construction
  • Haas, Dr. Wolfgang LEADER
  • Kim, Inhan DEPUTY
  • Terai, Tatsuo DEPUTY
  • T23 Ships
  • Mays, James L LEADER
  • Barter, Mike LEADER
  • T24 Manufacturing
  • Hardwick, Martin LEADER
  • Sakamoto, Chiaki DEPUTY
  • T25 Oil, Gas, Process and Power
  • Sandsmark, Nils LEADER
  • van Exel, Paul DEPUTY

6
Teams Meeting in HangZhou
7
T01 Shape Representation
  • Accomplishments in Valencia
  • 15926-3 Geometry and topology
  • Resolved remaining Change Mgmt issues jointly
    with T25 and Change Mgmt
  • NWI-CD-TS ballot to begin 2005-06
  • PDQ-Shape
  • Reviewed working draft

8
T01 Shape Representation
  • Plans between now and HangZhou
  • 15926-3 Geometry and topology
  • NWI-CD-TS ballot to begin 2005-06
  • PDQ-Shape
  • Prepare draft of CD for discussion in HangZhou

9
T04 Materials
  • Accomplishments in Valencia
  • 10303-235 Materials information
  • Completed Convenor review
  • Identified items for revision
  • Agreed completion strategy for the document
  • Developed proposals for Education and Outreach to
    adopt training methods for the dissemination of
    knowledge of SC4 standards

10
T04 Materials
  • Plans between now and HangZhou
  • ISO 10303-235 Materials information
  • Editorial revision of document
  • Complete A235 document
  • Work on development of distance learning packages
    for SC standards
  • Develop proposals for the standardisation of
    reference dictionaries for AP235

11
T10 Electrical/Electronics
  • Accomplishments in Valencia
  • Reviewed AP 210 (Electronic assembly interconnect
    and packaging design) status with WG12
  • Provided presentation on modularization process
    to WG12/AP 233
  • Submitted Requirements for STEPMOD Configuration
    Management Project to WG12

12
T10 Electrical/Electronics
  • Accomplishments in Valencia
  • Reviewed L. Klein paper Criticism of STEP in
    WG12
  • Identified opportunity to clarify Product
    Classification in STEP by adding ABSTRACT
    Information_product due to issues related to
    legacy ISO 10303 standards
  • Agreed to survey AP projects to gather rationale
    for current product subtypes and rules in
    product, version and view definition.
  • Reviewed AP 210/ AP 233/AP 239 harmonization
    (primarily issue with usage of external
    classification schemes for product
    identification)

13
T10 Electrical/Electronics
  • Accomplishments in Valencia
  • Other interesting Issues to be addressed
  • Variant product structure needed for AP 210
  • Software to be included in the Product needed for
    AP 210

14
T10 Electrical/Electronics
  • Future plans
  • AP 210 TS modules Ballot Resolution Workshop
    planned
  • Week of 2005-09-12 to 2005-09-16
  • Charleston, NC, USA
  • SC4 review timeline for AP210 TS modules through
    2005-10-31
  • Preliminary submittal of document reflecting
    current usage of product subtypes
  • Submit issue on product identification problem in
    Part 41

15
T19 Mechanical Products
  • Accomplishments in Valencia
  • AP 214 ARM walkthrough
  • Participated in meetings with T1 on PDQ-S and
    Parametrics
  • Participated in the ad hoc group on the
    transposition of the SASIG Product Data Quality
    Guidelines

16
T19 Mechanical Products
  • Plans between now and HangZhou
  • AP 214
  • Technical completion of 3rd edition
  • Possible issue resolution workshop with experts
    from SC4 and SASIG
  • AP 203 ed 2 Configuration controlled 3D design of
    mechanical parts and assemblies (modular
    version)?
  • Proposed to submit for DIS ballot by 2005-07-15

17
T23 Ships
  • Accomplishments in Valencia
  • Ship STEP Implementation Forum status briefing
  • The focus of testing will remain with 216 until
    it is rigorously tested and then the will change
    to AP 227
  • Test data available at www.nsrp.org/t23/
  • New version of TWR test geometry to be published

18
T23 Ships
  • Accomplishments in Valencia
  • Presentation on the status of the ISE projects
  • Proposed activities
  • AP 212 Electrical investigations
  • AP 215 Ship arrangements
  • Steel processing (AP 218 and AP 238)
  • Engineering analysis

19
T23 Ships
  • Plans between now and HangZhou
  • ISE4 two research announcements expected
  • Mid July
  • End of October
  • AP 227 ed 2 publication expected 2005-07
  • UK (DLO) to investigate use of AP 212 to
    consolidate LPD electrical information
  • CADDS 5 Geometry
  • ICEpic Cabling data
  • Aim to interface with US-led AP 212 work with a
    joint meeting in San Diego, USA, 2005-09

20
T25 Oil, Gas, Process and Power
  • Accomplishments in Valencia
  • Reviewed and planned progress on
  • Implementation of AP 227 ed 2 IS
  • ISO CD/TS 15926 parts 3 and 7
  • ISO register for reference data including ISO
    15926 parts 4, 5 and 6
  • Presented and achieved approval from Change Mgt
    Committee
  • NWI-PAS Gellish Table
  • NWI-CD-TS 15926-3
  • Progressed co-operation with eOTD ECCMA
  • Presented and discussed OWL representation of ISO
    15926
  • Resolved ballot comments issues for ISO CD/TS
    15926-4 Initial reference data
  • Participated in drafting a resolution on the TC
    10 NWI for product properties lists for process
    equipment
  • Participated in the ad hoc work group on a MA for
    reference data

21
T25 Oil, Gas, Process and Power
  • Plans between now and HangZhou
  • AP 221
  • Follow up DIS ballot
  • AP 227 Edition 2
  • Updated Usage Guide to support ed 2 published
  • ISO 15926-3 and 7
  • Follow up NWI/CD/TS ballot
  • ISO PAS Gellish Tables
  • NWI/PAS proposal will be modified on basis of
    university study comparing various inplementation
    methods
  • ISO NWI/TS 15926-4 Initial reference data
  • Prepare a pilot ballot resolution
  • Send the pilot to the convener for distribution
    to Norway, US and UK for evaluation
  • Resolve ballot issues. Planned completed by
    2005-12-31
  • Participate in the ad hoc work group on a MA for
    reference data

22
T25 Oil, Gas, Process and Power
  • Plan for HangZhou
  • Review advanced ballot comment for AP 221 DIS
  • Report on demonstrations of AP227 ed 2 pilot
    implementations
  • Conduct a CD-TS 15926-3 Ballot Comments Workshop
    (joint with T1 and WG12)
  • Conduct a CD-TS 15926-4 Ballot Comments Workshop
  • Review ballot comment for ISO15926-7 CD-TS
  • Review progress and plan further work on the PAS
    for Gellish Tables
  • Review progress and plan further work on the PWI
    for Process Monitoring Data
  • Review progress on co-operation between ECCMA,
    eOTD and T25
  • Participate in the ad hoc work group on a MA for
    reference data