Title: ALEPH in 1999 Alain Blondel, Ecole Polytechnique
1Most of the accelerator collaborations are rather
informal. How does one go beyond this? gt
Muon Concertation and oversight committee
(see C. Wyss talk) The
creation of a collaborative structure for
neutrino factory RD follows a proposal by L.
Maiani to organize a world-wide cooperation. The
first step is the creation of a European Muon
Coordinating Group MCOG The steering group
expressed that it is crucial that CERN takes
a leading role, and its desire to have this
structure set-up rapidly. Minutes of MUG
31-08-2001 gt times when CERN would finance
accelerator RD largely by itself are over! Need
to find collaborators and new sources of
financing (e.g. European Union, member states,
etc..) funding and manpower at the present
level needed to maintain ability to form these
collaborations!
2International collaborations for NUFACT RD
preliminary list
SPL IPHI , acceleration to 120 MeV CEA
Saclay, INFN Legnaro Recirculator and
accumulator RAL Target Isolde, BNL, EPFL
Lausanne, Grenoble, PSI Horn Uni Crakow,
discussions with France (Orsay?) Phase rotation
and cooling MICE RLA, Storage ring
FNAL, Frascati FFAG (Japan, RAL) HARP (24
Institutes) MUSCAT (10 Institutes)
MICE (40 Institutes signed the LOI)
Host Lab RAL Beam RAL PSI H2
absorbers MUCOOL (US, Japan, Oxford) RF
cavities US, RF power CERN/RAL/FNAL
Spectrometer detectors read-out, software
European institutions TOFMilano-Padova
TPG
Legnaro-Gva
sci-fi ICL/RAL-FNAL open
issues spectrometer solenoids
(Saclay?/Frascati?) focus
solenoids (RAL/Oxford? ) more
modern RF power, LiH absorbers ..