Title: MT' VIEW 4102009 Friday
1MT. VIEW 4-10-2009 - Friday
Current events include the following
Logan Paint is varnishing bamboo paneling in the
auditorium
2Painter has applied finish coats on the walls of
the band room
east elevation
south elevation
north elevation
western elevation
3air balancer is working in the HS basement making
adjustments to dampers
4air handler units are being cleaned in MECH C205
5adjustments to things like floor clean-outs and
concrete elevation height below egress door
C124C are being make on the north end of the
cafeteria floor area in room C124 for
preparation to QTZ flooring installation
6bamboo paneling has been screwed to underside of
stair carriage on stairway in the HS lobby /
corridor H137 screws have been counter- sunk,
heads have been covered with wood bungs/plugs,
and sanded flush with surface
7Trico has cased the display case in corridor EM100
8 Library C109 counter shade has been set over
book drop area of the circulation desk as
indicated on Drawing A702 and detailed on
Drawing 15 16 / A720 next photo shows another
view
9(No Transcript)
10Eastern Fire has been mounting sprinkler heads
is SAT ceiling in the EM wing as seen above
corridor EM100
11water faucets continue to be set in the science
labslike room M104
12bathroom partitions have been set in Boys
locker room H130
13fire alarm system is being coordinated with fire
dampers and elevator controls
14Several doors have been hung three examples are
shown
auditorium door C126D
corridor door EM103B
elementary library door E117
15Signet is hanging cable tray and organizing CAT 6
conductors in DATA room M218
16type F4 fixtures in corridor M100
Type F5 fixtures in room M104A
electricians have bee busy installing ceiling
light fixtures
17type A16 light fixtures in HS basement room
H008 have been connected to controller and
energized
18type F4 light fixtures in corridor M300
type F2 light fixture in ELEC CL M314
19site has been drying out ,but colder temps
continue to allow snow from melting in shaded
areas