  • THREE UTILIZATION ISSUES
  • LOCATION
  • 2. MODE OF EXTRACTION
  • 3. SULFUR REMOVAL

7
COAL PIPELINES COAL (200 MESH)/ WATER
SLURRY LARGE INVESTMENT COST CURRENT OPERATION
BLACK MESA, ARIZONA (1750 MW) 270
MILES PLANNED OPERATION HINDERED BY EMINENT
DOMAIN, WATER SUPPLY PROBLEMS NOT FEASIBLE FOR
LIGNITE
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
  • SOLUTIONS TO THE SULFUR PROBLEM IN POWER
    GENERATION
  • LOW SULFUR COAL
  • 2. MECHANICAL TREATMENT (BENEFICIATION)
  • 3. COAL GASIFICATION/LIQUEFACTION
  • 4. DOLOMITE INJECTION/FLUIDIZED BED