Updated B3G Activity Report of CCSA - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Updated B3G Activity Report of CCSA

Description:

(b) Physical Link Performance & Protocol Should been Tested at same time. CJKB3G5_09 ... Document 8F/258 a new calculation method by Matrix having proposed to ITU-R ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 8
Provided by: SWJ5
Category:

less

Transcript and Presenter's Notes

Title: Updated B3G Activity Report of CCSA


1
Up-dated B3G Activity Report of CCSA
2
1. Organization Structure of CCSA
CCSA
TC1
TC2
TC4
TC5
TC6
TC7
TC3
TC8
TC1 IP Multimedia
TC2 Protocol of Mobile Internet
TC3 Network Switching
TC4 Communication Power Supply
TC5 Wireless Communication
TC6 Transmission Network Access Network
TC7 Network Management
TC8 Network and Information Security
3
2. Structure of Technology Committee 5 (TC5)
TC5 (CWTS)
IMT-2000
GSM
CDMA
SECURITY
SERVICE
B3G
WLAN
Two New Technology Working Groups have been
established
SERVICE working group
B3G working group
4
3. Studying on Key Technology for B3G
  • Future Project have introduced in 4th_CJK meeting
  • Up-dated activity
  • (a) A new evaluation platform have been
    established in XiAN.
  • (b) Physical Link Performance Protocol
    Should been Tested at same time.

5
4. Studying on the methodology of calculating
spectrum requirement of B3G (I)
  • Having proposed the document 8F/117 to ITU-R
  • (a) Based on the methodology of ITU-R M.1390
  • (b) Time-varying and Region -varying
    weighting factors being introduced .
  • (c) Reflecting the nature of traffic on
    different Radio Access Technologies (RAT)

6
5. Studying on the methodology of calculating
spectrum requirement of B3G (II)
  • Document 8F/258 a new calculation method by
    Matrix having proposed to ITU-R

(a) the difference among the row elements means
the region -varying. (b) the difference
among the column elements means the time
-varying. (c) One element in the matrix
represents the total spectrum requirement
of all RATs in one time phase as well as one
regional area.
7
  • END
Write a Comment
User Comments (0)
About PowerShow.com