LA CENTRAL NUCLEAR DE TRILLO EN 2007 EXPERIENCIAS
Y PERSPECTIVAS
27-Febrero-2008
2
CENTRAL NUCLEAR DE TRILLO OBJETIVOS Y RESULTADOS
2007
Figura 1
3
CENTRAL NUCLEAR DE TRILLO PRODUCCIÓN BRUTA 2007
PRODUCCIÓN BRUTA HISTÓRICA
Figura 2
4
FACTOR DE CARGA / PARADAS AUTOMÁTICAS RESULTADOS
2007
Figura 3
5
EXPOSICIÓN COLECTIVA A LA RADIACIÓN RESULTADOS
2007
PROTECCIÓN RADIOLÓGICA
OBJETIVO INPO
Figura 4
6
VOLUMEN DE RESIDUOS RADIACTIVOS
ACONDICIONADOS RESULTADOS 2007
  • VOLUMEN DE RESIDUOS RADIACTIVOS DE MEDIA/BAJA
    ACTIVIDAD
  • RETIRADOS POR ENRESA EN EL AÑO 2007 18 BULTOS
    (3,96 M3).

Figura 5
7
INCIDENCIAS MÁS SIGNIFICATIVAS
  • SUCESOS NOTIFICABLES
  • SE PRODUJERON 7 SUCESOS QUE A CONTINUACIÓN
    RELACIONAMOS
  • ISN-01/2007. 01/06/07. INCUMPLIMIENTO DE LA
    ACCIÓN A1 DE LA C.L.O. 4.10.2.5. PROPORCIONAR
    UNA MANGUERA Y UNA BIFURCACIÓN ACOPLADA A LA BIE
    OPERABLE MAS PRÓXIMA (UJ71 Z937) POR
    INOPERABILIDAD DE LA BIE UJ73 Z905. (DURANTE LA
    RECARGA).
  • ISN-02/2007. 22/06/07. FUGA DE ACEITE DEL
    COJINETE DE TURBINA SB12 (DURANTE EL ARRANQUE DE
    LA PLANTA TRAS LA RECARGA, REACTOR AL 30.
    DURACIÓN 1 DÍA Y 19 HORAS).
  • ISN-03/2007. 24/06/07. PARADA AUTOMÁTICA DE
    TURBINA (TUSA) POR ALTAS VIBRACIONES EN EL
    COJINETE DE EMPUJE SB11. (DURANTE EL PROCESO DE
    ARRANQUE, INMEDIATAMENTE DESPUÉS DE LA
    SINCRONIZACIÓN. DURACIÓN DE 1 HORA Y 22 MINUTOS
    HASTA NUEVO ACOPLAMIENTO).
  • ISN-04/2007. 24/06/07. PARADA AUTOMÁTICA DE
    TURBINA (TUSA) POR SEÑAL DE MUY BAJO NIVEL DE
    ACEITE EN EL DEPÓSITO PRINCIPAL DE ACEITE DE
    TURBINA Y POSTERIOR PARADA AUTOMÁTICA DEL REACTOR
    (RESA) POR ACTIVACIÓN DE LA SEÑAL DE PROTECCIÓN
    DEL REACTOR YZ11 POR ALTA PRESIÓN DEL VAPOR
    PRINCIPAL. (DURANTE EL PROCESO DE ARRANQUE.
    DURACIÓN DE 15 HORAS Y 7 MINUTOS HASTA NUEVO
    ACOPLAMIENTO A LA RED).

Figura 6
8
INCIDENCIAS MÁS SIGNIFICATIVAS (Continuación)
  • SUCESOS NOTIFICABLES
  • ISN-05/2007. 20/09/07. ARRANQUE DEL GENERADOR
    DIESEL DE EMERGENCIA GY60 POR ACTIVACIÓN DE LAS
    SEÑALES DE PROTECCIÓN DEL REACTOR YZ71/2/3 COMO
    CONSECUENCIA DE LA ACTIVACIÓN DE LA SEÑAL DE
    ALTA TEMPERATURA DEL AGUA DE REFRIGERACIÓN DEL
    MOTOR DEL GENERADOR DIESEL DE SALVAGUARDIAS
    GY20. DURANTE LA REALIZACIÓN DE LA PRUEBA DE
    VIGILANCIA. (CENTRAL FUNCIONANDO A PLENA
    POTENCIA. NO SUPUSO PÉRDIDA DE ENERGÍA).
  • ISN-06/2007. 28/11/07. ARRANQUE DEL GENERADOR
    DIESEL DE EMERGENCIA GY80 POR ACTIVACIÓN DE LAS
    SEÑALES DE PROTECCIÓN DEL REACTOR YZ71/2/3 DEBIDO
    A QUE EL GENERADOR DIESEL DE SALVAGUARDIA GY40
    NO PUDO MANTENER LOS VALORES DE FRECUENCIA Y
    TENSIÓN EN LA BARRA DURANTE LA REALIZACIÓN DE LA
    PRUEBA DE VIGILANCIA. (CENTRAL FUNCIONANDO A
    PLENA POTENCIA. NO SUPUSO PÉRDIDA DE ENERGÍA).
  • ISN-07/2007. 30/11/07. NO EXISTÍA CONSTANCIA
    DOCUMENTAL DEL ESTADO DE LAS JUNTAS TÓRICAS DE
    LAS VÁLVULAS TERMOSTÁTICAS DE LOS MOTORES DIESEL
    GY32 Y GY70 TRAS LA EMISIÓN DE LA CONDICIÓN
    ANÓMALA CA-TR-07/003 DEL 13/11/07 COMO
    CONSECUENCIA DE LA INVESTIGACIÓN DEL INCIDENTE
    DEL DIESEL GY20 (ISN-05/007).

Figura 6
9
RESULTADOS RECARGA 2007
Figura 7
10
POLITICA DE COMBUSTIBLE Y BARRAS DE CONTROL
  • CARGA DE DOS CONTENEDORES (21 ELEMENTOS POR
    CONTENEDOR) EN EL AÑO 2007, ESTANDO PREVISTA LA
    CARGA DE OTROS DOS EN EL 2008. SE ESTÁN HACIENDO
    ESTUDIOS PARA EL SECADO CON HELIO DE LOS
    CONTENEDORES.
  • SE HA MEDIDO EL ESPESOR DE CAPA DE OXIDO DE LAS
    VARILLAS DE ZRY-4/D4 DE 2 ELEMENTOS DE
    COMBUSTIBLE CON 4 CICLOS DE IRRADIACIÓN Y UN
    QUEMADO DE 52,8 MWd/kgHM COMPROBANDOSE EL BUEN
    COMPORTAMIENTO DE ESTE MATERIAL ANTE LA
    IRRADIACIÓN Y QUE EL FACTOR DE AJUSTE UTILIZADO
    EN LOS MODELOS DE CÁLCULO ES CORRECTO.
  • PARA LA PRÓXIMA RECARGA (2008) SE CARGARÁN 36
    ELEMENTOS DE COMBUSTIBLE DEL TIPO HTP Y SE
    DEJARAN 4 DE RESERVA EN EL ALMACÉN.
  • ESTÁ EN ESTUDIO UN AUMENTO DE DENSIDAD DE LAS
    PASTILLAS DE COMBUSTIBLE.
  • SE HA COMPLETADO LA SUSTITUCIÓN DE LA TOTALIDAD
    DE LAS 52 BARRAS DE CONTROL.

Figura 8
11
POLITICA DE MANTENIMIENTO
  • FINALIZACIÓN DEL PROGRAMA DE ACTUALIZACIÓN Y
    CAMBIO DE LOS MOTORES DIESEL.
  • CONTINUAR CON EL PROCESO DE ACTUALIZACION DE
    ALTERNADORES DIESEL (2007-2010).
  • CONTINUACION DEL PROGRAMA DE CAMBIO DEL RELLENO
    DE LAS TORRES DE TIRO NATURAL (PROGRAMADO PARA EL
    PERIODO 2006 2008).
  • ACTUALIZACIÓN DE LOS TRANSFORMADORES PRINCIPALES
    (PERIODO 2006 2009).
  • CONTINUACION DEL PROCESO DE CAMBIO DE BATERIAS
    HASTA EL AÑO 2011
  • RENOVACIÓN DE LA IC (PERIODO 2005 2011).
  • SISTEMAS RENOVADOS
  • SISTEMA DE NEUMOBOLAS.
  • SISTEMA POWERTRAX (CÁLCULOS NUCLEARES) PENDIENTE
    DE VALIDAR.
  • INICIADO LA ACTUALIZACIÓN DEL SISTEMA DE
    VIGILANCIA VIBRACIONES DE LAS BOMBAS PRINCIPALES.
  • SISTEMAS PLANIFICADOS A RENOVAR CON INICIO EN EL
    2007
  • ORDENADORES DE PROCESO (2007-2009).
  • COMENZAR LOS ESTUDIOS PARA RENOVACIÓN DEL CONTROL
    DE LA MÁQUINA DE RECARGA Y DE LA TURBINA.

Figura 9
12
PROGRAMA GENERAL 20ª RECARGA
Figura 10
13
EVALUACIONES EXTERNAS REALIZADAS EN CNAT
  • RESULTADOS DEL PEER REVIEW EN C. N. TRILLO
    SEPTIEMBRE 2007
  • LA EVALUACIÓN REALIZADA POR COLEGAS DE OTRAS
    CENTRALES CON LA METODOLOGÍA WANO SE REALIZÓ
    DURANTE TRES SEMANAS EMPEZANDO EL 17 DE
    SEPTIEMBRE DE 2007 HASTA EL 5 DE OCTUBRE DE 2007.
  • HAN PARTICIPADO 20 TÉCNICOS ESPECIALISTAS EN
    ESTE TIPO DE EVALUACIÓN COORDINADOS POR 2
    ESPECIALISTAS DE WANO PARIS.
  • LOS RESULTADOS EN GENERAL HAN SIDO
    SATISFACTORIOS AUNQUE SE HAN ENCONTRADO ALGUNAS
    ÁREAS EN LAS QUE ES POSIBLE REALIZAR MEJORAS
    COMPARANDO NUESTAS PRÁCTICAS CONTRA LAS MEJORES
    EXPECTATIVAS Y CRITERIOS DE WANO.
  • EL INFORME DEFINITIVO LO ENVIARÁ WANO EN LOS
    PRIMEROS MESES DEL AÑO, MIENTRAS TANTO C.N.
    TRILLO ESTÁ TRABAJANDO EN LA PREPARACIÓN DE UN
    PLAN DE ACCIONES DE MEJORA ORIENTADO A CUMPLIR
    CON TODOS LOS CRITERIOS DE WANO. ESTE SE
    IMPLANTARÁ EN LOS PRÓXIMOS MESES.

Figura 11
14
Satisfaction of course participants Average of
evaluations of the course results according to
student questionnaires, expressed as a
percentage UIUII gt 70 TR gt 70 Training
Percentage of training hours compared to total
number of normal working hours, according to
Collective Agreement UIUII gt 3 TR gt 3 Course
attendance. Ratio between real hours per man of
course attendance and hours per man expected at
the start of said courses, expressed as a
percentage UIUII gt 80 TR gt 80

EVALUACIÓN EXTERNA DEL SISTEMA DE FORMACIÓN DE
CENTRALES NUCLEARES ALMARAZ TRILLO
Trillo, 27 de Febrero de 2008
15
Objetivo de la Evaluación
  • Objetivo Analizar el sistema de planificación,
    ejecución y evaluación de la formación en
    Centrales Nucleares Almaraz Trillo.
  • Contexto Tras el proceso de integración
    realizado en 2005 en el que se unificaron las
    prácticas de trabajo, los procedimientos y las
    bases de datos de Formación.

1
16
Metodología
  • Personas y Tareas
  • (2006) Evaluación realizada por un Equipo Externo
    de la Universidad de Valencia, a través de
  • Análisis de la documentación año 2005
  • Análisis cuantitativo de datos sobre el
    sistema de formación
  • Análisis cualitativo a partir de entrevistas a
    trabajadores, supervisores e instructores
  • (2007) Con la colaboración de un Equipo Interno,
    se finalizó el proceso de evaluación con
  • Análisis informe evaluación
  • Propuesta y priorización de áreas de mejora
  • Propuesta y planificación de actividades

2
17
Resultados
  • Caracterización del Sistema
  • El sistema de formación está consolidado y
    aceptado en CNAT.
  • El sistema de formación se lleva a cabo en un
    contexto influido por
  • Unas regulaciones externas
  • Los periodos de recarga y el mantenimiento en
    operación
  • El cambio generacional
  • El sistema de turnos
  • El Predominio de la formación técnica frente a la
    formación en habilidades psico-sociales
  • El fuerte impacto de la reglamentación sobre
    formación puede llevar a convertir la norma en un
    fin y no en un medio para mejorar
  • Una débil integración entre la formación y la
    gestión del conocimiento

3
18
Resultados
  • Recomendaciones
  • Incrementar la IMPLICACIÓN DE LOS MANDOS
    INTERMEDIOS en la formación de sus empleados.
    Cultivando un clima previo y posterior a las
    acciones formativas que potencie la eficacia de
    las mismas.
  • Potenciar el sistema de DETECCIÓN Y ANÁLISIS DE
    NECESIDADES de formación. Actuaciones mas
    ESPECÍFICAS con cada colectivo.
  • Reforzar la PLANIFICACIÓN ANUAL de formación
    logrando mantener dentro de límites razonables el
    volumen de imparticiones adicionales y de
    sesiones de estudio.
  • Reforzar algunas fases de la EVALUACIÓN de la
    formación.
  • Orientar la formación mediante ENTRADAS
    ESTRATÉGICAS desde la Dirección de la
    Organización.
  • Mejorar la INTEGRACIÓN Y COMUNICACIÓN de los
    datos de formación entre los tres centros.

4
19
Finalización
  • Análisis y priorización
  • Las recomendaciones fueron analizadas por un
    equipo integrado por los responsables de la
    formación en CNAT.
  • Se han establecido un total de 24 áreas de mejora
    en respuesta a las recomendaciones establecidas.
  • Cada área se ha clasificado en términos de
    prioridad asignándose un responsable para la
    determinación de las actividades a realizar y la
    propuesta de acciones concretas al equipo de
    trabajo.
  • Las actividades asociadas a las áreas de mejora
    de prioridad alta (48 actividades) se han
    realizado a lo largo del 2007.
  • Las áreas de prioridad media y baja se
    periodificarán a lo largo del 2008/9.
  • Las áreas tienen en cuenta otros proyectos como
    el análisis del impacto de las Instrucciones de
    Seguridad IS11 y 12.

5
20
Áreas de Mejora Prioridad Alta
  • Potenciar LA IMPLICACIÓN DE LOS MANDOS en la
    formación de los empleados, en aspectos
    relativos a la definición de necesidades, y en la
    valoración de las mismas, así como con la
    presencia activa de estos al inicio de las
    acciones, con el fin de reforzar la importancia
    de la formación.
  • Establecer mecanismos de PARTICIPACIÓN DIRECTA DE
    LA LÍNEA en las distintas fases del proceso de
    formación.
  • Complementar la evaluación de la transferencia de
    la formación recibida con la OBSERVACIÓN EN CAMPO
    Y LOS OBSERVATORIOS DE FORMACIÓN.
  • Potenciar la evaluación de la TRANSFERENCIA AL
    PUESTO DE TRABAJO en un mayor número de acciones
    formativas.

6
21
Acciones de Mejora Prioridad Alta
  • Incorporar al PERSONAL CONTRATISTA ESTABLE en los
    procesos de formación establecidos para el
    personal propio.
  • Establecer los mecanismos que permitan SUPERVISAR
    LA CUALIFICACIÓN GENERAL Y ESPECÍFICA DEL
    PERSONAL CONTRATISTA, previamente a la
    incorporación a la actividad.
  • Revisar la DEFINICIÓN DE LOS PRINCIPIOS DE LA
    FORMACIÓN y concretar el rol del servicio de
    formación en la gestión de la misma.
  • Facilitar la transmisión de la información
    relativa a NECESIDADES DE FORMACIÓN ASOCIADAS A
    PLANES ESTRATÉGICOS para su inclusión desde el
    inicio en la planificación anual.
  • Mejorar la INTEGRACIÓN Y COORDINACIÓN de los tres
    servicios de formación tanto en la formación
    técnica, como en la formación no técnica,
    aclarando los alcances y responsabilidades en
    cada área.

7
22
Ejemplo de Área de Mejora Prioridad Alta