Title: Development Plans Toolik Field Station
1Development PlansToolik Field Station
2BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
Current Facilities September 2001
3BLM Lease Boundary 26.84 Acres
SAUNA
LABSI
LAB4
Loading Ramp
Heliport
MEET
8000TANK
Tent Area
LABDRY
GEN
LABW
LABWET
BATH
LAB3
Winter Residence
TIRE
WORK
Polar Tent
Residence 1 -4
WASH
LAB2
LAB1
CONEX
Dining Tent
Loading Dock
Winter Quarters
Dining Complex
Managers Trailer
FACILITY INDETIFICATION 2001 Map 1 of 2
4BLM Lease Boundary 26.84 Acres
MBL Met Station
Outhouse
Gasoline Tank
Weatherports
Dumpsters and Incinerator
Weatherports
Residence Weatherports
Outhouse
Weatherports
Residence Trailers
Dining Tent
WQ Gen Set
Weatherports
FACILITY INDETIFICATION 2001 Map 2 of 2
5TFS Development PlanGoals and Objectives
- Provide housing and support facilities for a base
population of 125 residents during the summer
field season. - Provide overload and educational conferences
housing. - Connect to the fiber optic cable that runs from
Prudhoe Bay to Valdez. - Provide laboratory facilities to support a base
user group of 125 researchers during the summer
field season. - Provide an intracamp LAN and Phone system.
6TFS Development PlanGoals and Objectives
- v Provide shower facilities.
- v Provide clothes washing facilities.
- v Provide a gray and blackwater
holding/treatment facility. - v Provide dinning facilities for a base
population of 125 residents. - v Provide residence and support facilities to
accommodate 25 year round users. - v Provide a science support workshop.
- v Provide and incubation and environmental
chamber facility
7TFS Development PlanGoals and Objectives
- v Provide a winter science support building.
(labs, office, winter base of operation, comms,
storage, ship/rec.) - v Connect to the Alyeska Natural gas line,
covert facilities to natural gas. - v Support expanded use of facilities during
short-term summer field courses and field trips. - v Support Arctic Environmental Observatory/NEON
- v Act as Regional Arctic Logistics provider.
- v Provide secure summer and winter storage
space. - v Support summer winter field courses with
classrooms and lecture halls.
8PHASE 1
- Two additional residence modules.a) 24 x 70
approximate sizeb) 8 beds rooms per unit, 16
bedsc) bathrooms, shower, laundryd) mud room,
recreation room (complete 2002) - Expand current kitchen facility (complete 2002)
- Incubation Laboratory Module. (complete 2002)
9BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 1
10PHASE 2
- Science Support Buildinga) 74 x 84 approximate
dimensionsb) offices, labs, computer lab, first
aid - c) facility is heated year roundd)
shipping/receiving bay 50 x 60e) storagef)
winter logistics support base
11BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 2
12Concept Drawing Science Support Building
13Concept Drawing Science Support Building
14PHASE 3
- Replace kitchen complexa) kitchenb) dining area
to seat 100c) food storage pantryd) walk-in
freezers and coolerse) bathrooms
15Preliminary Kitchen Design
16BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 3
17PHASE 4
- Two new residence units
- One new laboratory 24 x 60 approximate
18BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 4
19PHASE 5
- Replace current workshop
- Add a new laboratory 24 x 60
- Add residence unit
20BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 5
21PHASE 6
- Add lecture hall
- Add residence
22BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 6
23PHASE 7
- Add new laboratory
- Add new residence
- Build additional road on current pad.
24BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 7
25PHASE 8
- Add new laboratory
- Add new residence unit
26BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 8
27PHASE 9
28BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 9
29PHASE 10
- Add new facility support module
30BLM Lease Boundary 26.84 Acres
Proposed Locations of New Facilities TFS
Development Plan MAA 11/29/01
PHASE 10
31Preliminary Kitchen/Lecture Design