http://nodal.ercot.com 1 - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

http://nodal.ercot.com 1

Description:

State Estimator Load Report. Topology Consistency. Lead from the front ... Click one of the new report links to bring up a screen similar to the ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 9
Provided by: RachelC154
Category:
Tags: com | ercot | http | lead | nodal

less

Transcript and Presenter's Notes

Title: http://nodal.ercot.com 1


1
MIS Build 1.7 Update
  • Brett Economides
  • 11/27/2007

2
Whats Available in Build 1.7?
  • Reports Added for Build 1.7
  • Active SCED Contingencies
  • State Estimator Switch Status
  • State Estimator Transmission Flows and Voltages
  • State Estimator Load Report
  • Topology Consistency

3
Getting Started in the EDS Environment
  • Start in the EDS Environment at
    https//nodaleds.ercot.com8443/misportal
  • Click the Markets tab and then click Real Time
    Markets

4
Report List
  • Click one of the new report links to bring up a
    screen similar to the following

5
Report List Continued
  • Click a report name to bring up the File Download
    window

6
Report List Continued
  • Click Open to display the XML or Click Save to
    save to your desired location

OR
7
Report Display
  • Click the Internet Explorer icon at the end of
    the report name (on the screen from Slide 5) to
    view the report format.

8
Whats Coming?
  • Items to be Added in Build 1.8
  • Graphic updates New button graphics, Relocation
    of portlet types, etc.
  • MPIM Launch This will be included in Build 1.8
    but will not be available until MPIM is made
    available to the Market Participant community.
  • Build 1.8 will be deployed into EDS in early
    December.
Write a Comment
User Comments (0)
About PowerShow.com