SMOS validation sites: Goulburn - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

SMOS validation sites: Goulburn

Description:

SMOS validation sites: Goulburn – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 20
Provided by: cecilia3
Category:

less

Transcript and Presenter's Notes

Title: SMOS validation sites: Goulburn


1
SMOS validation sitesGoulburn Murrumbidgee
  • Cecilia Azcurra
  • Supervisor Jeff Walker

2
Background
  • The SMOS satellite will be the first dedicated to
    the measurement of soil moisture
  • Will measure soil moisture on a 50 x 50 km scale
  • Ground-based measurements to be used for
    calibration and validation of soil moisture
    derived from SMOS
  • SMOS validation sites are being identified
    world-wide
  • Australian validation sites will cover a
    semi-arid climate

3
SMOS validation
  • There is a discrepancy between the scale of SMOS
    measurements and that of the ground-based (point)
    measurements
  • Heterogeneous land cover is an issue
  • Other issues include urban areas and standing
    water
  • Sampling needs to represent the soil moisture
    over SMOS-sized pixels
  • How many point measurements are required to
    obtain the spatial average?

4
The study areas
5
Goulburn catchment
6
Goulburn catchment study area
7
Goulburn catchment data
8
Goulburn catchment data
9
Goulburn catchment data
10
Yanco region
  • Soil moisture from air measurements
  • Over 11 days
  • 12 Monitoring stations

11
Kyeamba Creek
  • Soil moisture from air measurements
  • Over 3 days
  • Regional sampling
  • 14 Monitoring stations

12
General approach
13
Preliminary results Goulburn catchment
RMSE (regional) 0.0275 v/v
RMSE (monitoring stations) 0.0571 v/v
14
Preliminary results Yanco region
RMSE 0.0359 v/v
15
Next steps
  • Regional sampling data
  • For Goulburn catchment
  • Re-sampling to determine the number of samples
    required to determine the spatial mean
  • Monitoring stations
  • Identify which stations are representative of the
    area

16
(No Transcript)
17
Bootstrap sampling - Goulburn catchment
Nov-07
Oct-31
Nov-21
Nov-14
18
Preliminary results - Goulburn catchment
19
Preliminary results - Yanco region
Write a Comment
User Comments (0)
About PowerShow.com