Washington Salmon Recovery Funding Board - PowerPoint PPT Presentation

1 / 41
About This Presentation
Title:

Washington Salmon Recovery Funding Board

Description:

Washington Salmon Recovery Funding Board. Reach Scale Effectiveness Monitoring Program ... 02-1530 Tributary to the Salmon River. Fish Passage Project. Fish ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 42
Provided by: fwen8
Category:

less

Transcript and Presenter's Notes

Title: Washington Salmon Recovery Funding Board


1
Washington Salmon Recovery Funding Board Reach
Scale Effectiveness Monitoring Program 2005
Progress Report Preliminary Findings
2
Agenda1. Program Overview2. Description of
Summary Statistics3. Sample Projects and Data4.
Grading Systems and Analysis5. Summary
3
  • Program Overview
  • Restoration vs. Habitat Protection
  • Restoration Projects Monitoring has BACI
    Design with control and impact reaches EMAP
    sample reach Uses t-test to look for
    differences before and after implementation
    (5-10 years)
  • Habitat Protection Projects Monitoring
    focuses on trends in ecological health through
    time (12 years)

4
Project Types
  • Restoration Projects
  • Fish Passage Projects
  • Instream Structure Projects
  • Riparian Planting Projects
  • Constrained Channel Projects
  • Channel Connectivity Projects
  • Spawning Gravel Projects
  • Diversion Screening Projects
  • Habitat Protection Projects
  • Preservation without additional actions
  • Existing high quality habitat
  • Maintain or improve ecological condition

5
Fish Passage Projects
6
Fish Passage Projects
02-1530 Tributary to the Salmon River Fish
Passage Project
7
Instream Structure Projects
8
Instream Structure Projects
02-1463R Salmon Creek
9
Riparian Planting Projects
10
Riparian Planting Projects
02-1446R Centralia Riparian Restoration Project
11
Livestock Exclusion Projects
12
Livestock Exclusion Projects
02-1498 Abernathy Creek Riparian Restoration
13
Constrained Channel Projects
14
Constrained Channel Projects
02-1625 South Fork Skagit Levee Setback and
Acquisition
15
Channel Connectivity Projects
16
Channel Connectivity Projects
02-1561 Edgewater Park Off-Channel Restoration
17
Spawning Gravel Projects
18
Spawning Gravel Projects
04-1209 Chico Creek Restoration
19
Diversion Screening Projects
No control structure established Tests for
function of the screen (yes/no vs. t-test)
20
Diversion Screening Characteristics
NOAA Fisheries Criteria
21
Diversion Screening Projects
02-1543 Walla Walla Fish Screening Project
22
Habitat Protection Projects
23
Habitat Protection Projects
24
Habitat Protection Projects
Estuary Project Statistics
25
Habitat Protection Projects
Upland Habitat Statistics
26
Habitat Protection Projects
Fish Species Assemblage Grading System
27
Habitat Protection Projects
Macroinvertebrate Multimetric Index Grading System
28
Habitat Protection Projects
02-1622A Issaquah Creek Log Cabin Reach
Acquisition
29
Habitat Protection Projects
Rating Criteria for Vegetation Quality
30
Habitat Protection Projects
31
Habitat Protection Projects
02-1650 Methow Critical Habitat Area Acquisition
32
Habitat Protection Projects
33
Habitat Protection Projects
34
Habitat Protection Projects
Macroinvertebrate Multimetric Index Grading System
35
Habitat Protection Projects
Fish Species Assemblage Grading System
36
Data Analysis-Project Life
37
Data Analysis
38
Data Analysis Cost Effectiveness
39
  • Project Enhancements
  • Upland Vegetation and Estuary Habitat Protocols
  • GIS Analysis of vegetation condition
  • Additional Substrate Protocol Analysis
  • Additional Studies University of Washington
  • Independent QA/QC Analysis
  • Potential study on standards for summary
    statistics

40
SUMMARY
  • Preliminary findings from first two years of data
    collection
  • Able to see differences for some variables in
    2005
  • Other variables may take longer to show
    meaningful change
  • Results provide data to the Washington State
    Salmon Recovery Funding Board to quantify the
    effectiveness of project categories
  • Monitoring can indicate how quickly project types
    may show change

41
Questions?
  • Contact Info
  • Jennifer ONeal jennifer.oneal_at_tteci.com
  • 425-482-7779
  • Bruce Crawford brucec_at_iac.wa.gov
  • 360-902-2956
Write a Comment
User Comments (0)
About PowerShow.com