ARMY RESERVE IMPLEMENTATION PLAN
Amry
Watercraft Restructuring Plan (AWRP)
VTC 2 July 2002 Pentagon
2
ARMY RESERVE IMPLEMENTATION PLAN
  • AGENDA
  • ARMY RESERVE AWRP POSITION
  • MILESTONES/TIMELINES
  • ISSUES

3
ARMY RESERVE IMPLEMENTATION PLAN
  • ARMY RESERVE AWRP POSITION
  • Support Army PREPO IAW DOD Directive 1225.6
  • PREPO Endstate Transfer Vessels to AMC
  • Crew to Boat Ratio 21, 10 Crews - 5 Boats
  • MULTI-COMPO
  • Execute DA Plan as Ordered. Waiting Decision
    on the 332nd Terminal Bn Staying Multi-Compo
    (M-C)
  • FUTURE
  • Will Re-evaluate Army Reserve Watercraft
    Position in TAA 11

4
ARMY RESERVE IMPLEMENTATION PLAN
  • MILESTONES/TIMELINES
  • 175th TC Co (Floating Craft Maintenance),
    Tacoma, WA
  • Converts to Watercraft Maint Co, Edate 20030916
  • 467th TC Co (Floating Craft), Tacoma, WA
  • Converts to Modular Causeway, M-C, New Proposed
    Edate 20040916
  • Fielding of MCS sets (Warping Tug slipped from
    Nov 02 to Mar 03)
  • 203rd Trans Det (LSV 8), Baltimore, MD
  • No funding for LSV8
  • Carrier Edate 20050916

5
ARMY RESERVE IMPLEMENTATION PLAN
  • MILESTONES/TIMELINES
  • 548th Trans Det (LSV 7), Honolulu, HI
  • Under Construction, Fielding Nov 03
  • Edate 20020916
  • 805th Trans Det (LSV 3), Tacoma, WA
  • Mobilized in Support of ONE/OEF, 26 Mar 02
  • 464th TC Co (Medium Boat), Ft. Belvoir, VA
  • Inactivate (J) 20030915

6
ARMY RESERVE IMPLEMENTATION PLAN
  • MILESTONES/TIMELINES
  • 949th TC Co (Floating Craft), Baltimore, MD
  • Converts to M-C Floating Craft. Edate 20030916
  • 481st TC Co (Heavy Boat), Mare Island, CA
  • Convert to M-C 20030916

7
ARMY RESERVE IMPLEMENTATION PLAN
  • MILESTONES/TIMELINE
  • 824th TC Co (Heavy Boat), Morehead City, NC
    Tampa, FL
  • Edate to MC 20020917
  • 332nd TC Terminal Bn, Tampa, FL
  • Edate to MC 20020917, awaiting decision DA on
    MC

8
ARMY RESERVE IMPLEMENTATION PLAN
  • ISSUES
  • 332nd TC Terminal Bn M-C Status
  • Equipment Funding/Timeline
  • Logistic Support Vessel
  • Theater support Vessel
  • Modular Causeway System
  • Vessel Bridge Simulator (Maintenance, etc POM)
  • - Containerized Maintenance Facility (CMF)
  • DOD Directive 1225.6 (New and/or Combat
    Serviceable Equipment for Reserve Forces)
    Replacement Plan
  • Vessel to Crew Ratio, OCAR position remains 21
    in support of the Army Position

9
ARMY RESERVE IMPLEMENTATION PLAN

QUESTIONS ?