Executive Summary 95 and98 Bond Construction Program - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Executive Summary 95 and98 Bond Construction Program

Description:

– PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 14
Provided by: Sull78
Category:

less

Transcript and Presenter's Notes

Title: Executive Summary 95 and98 Bond Construction Program


1
Roosevelt High School Replacement Phase V
Schematic Design Presentation 2003 Bond Program
Garrett J. Sullivan, Executive DirectorConstructi
on Management Engineering Department
July 10, 2006
2
Roosevelt High School Program Analysis
  • Construct New Academic/Support Facilities/Selected
    Athletic Fields/ Parking and Infrastructure for
    Roosevelt HS including the following Program
    Areas
  • Administrative Area with Student Health Clinic
    and Campus Support Areas
  • Athletics and Physical Education Program (2
    Gymnasiums Support Areas)
  • Career and Technology Program including the
    Engineering Technologies Academy Magnet Program
    (24 Classroom Areas)
  • Dance/PEP/Cheerleader (1 Classroom Area)
  • Drivers Education Program (1 Classroom Area)
  • Food Service Program (Kitchen Cafeteria
    Outdoor Dining Area)
  • General Instructional and Language Arts including
    the DATA Magnet Program Facility (58 Classroom
    Areas)
  • Library / Media Center
  • Multi-Use Production Studio (2 Classroom Areas)
  • Music Program Band Orchestra Choir (3
    Classroom Areas)
  • JROTC (3 Classroom Areas)
  • Special Education (16 Classroom Areas)
  • Speech (2 Classroom Areas)
  • Theater Arts (1 Classroom with Auditorium and
    Black Box Theater)
  • Maintain the 1995 (DATA) 1998 Bond (Arts
    Sciences) Facilities

3
Roosevelt High School Program Analysis
  • Construct New Academic/Support Facilities/Selected
    Athletic Fields/ Parking and Infrastructure for
    Roosevelt HS including the following Program
    Areas
  • Administrative Area with Student Health Clinic
    and Campus Support Areas
  • Athletics and Physical Education Program (2
    Gymnasiums Support Areas)
  • Career and Technology Program including the
    Engineering Technologies Academy Magnet Program
    (24 Classroom Areas)
  • Dance/PEP/Cheerleader (1 Classroom Area)
  • Drivers Education Program (1 Classroom Area)
  • Food Service Program (Kitchen Cafeteria
    Outdoor Dining Area)
  • General Instructional and Language Arts including
    the DATA Magnet Program Facility (7 of 58
    Classroom Areas)
  • Library / Media Center (Campus and Public Library
    Program Areas)
  • Multi-Use Production Studio (2 Classroom Areas)
  • Music Program Band Orchestra Choir (3
    Classroom Areas)
  • JROTC (3 Classroom Areas)
  • Special Education (3 of 16 Classroom Areas)
  • Speech (2 Classroom Areas)
  • Theater Arts (1 Classroom with Auditorium and
    Black Box Theater)
  • Maintain the 1995 (DATA) 1998 Bond (Arts
    Sciences) Facilities

4
Roosevelt High School Existing Site Plan
5
Roosevelt High School Proposed Site PlanPackages
I through IV
6
Roosevelt High School Final Site Plan Package V
7
Roosevelt High School Package VAdmin/Career
Counseling/Clinic Floor Plan
8
Roosevelt High School Package VLibrary Floor Plan
9
Roosevelt High School Package VCareer
Technology 1st - 2nd 3rd Floor Plans
3rd Floor
1st Floor
2nd Floor
10
Roosevelt High School Replacement Building
Elevations Phase IV and V 2003 Bond Program
View of Campus from Ray Bon
View of Campus from Walzem Road
11
Budget Summary
  • Construction Account (1) 52,673,177.00
  • Design Account 3,930,629.00
  • Technology Account 1,280,000.00
  • FFE Account (2) 3,120,000.00
  • CM Services 1,372,586.00
  • Bid Contingency 1,307,830.00
  • Construction Contingency 2,616,383.00
  • ROCIP Contingency (3) 1,569,395.00
  • Grand Total 67,870,000.00
  • Note 1 Construction Includes 874,390
    for Asbestos Abatement
  • Note 2 FFE Furniture, Fixtures and
    Equipment
  • Note 3 ROCIP Rolling Owner Controlled
    Insurance Program

12
Budget-Bid Analysis
  • Bid Facts/Assumptions
  • Package I and II 1998 Bond Arts Sciences
    Facility
  • Package III/III-A ROTC / Central Plant / Tennis
    Courts
  • Total Bid Package Cost 6,312,412
  • Package IV GRECO Building (General Academic
    Areas, Fine Arts/Theater Arts/Auditorium,
    Athletics/PE/Gyms, Special Education, and Food
    Service)
  • Total Bid Package Cost 36,335,510
  • Package V Administration/Counseling, Academic
    Areas AB, Library, Career Technology, and
    Selected Athletic Fields
  • Estimated Bid Package Cost 19,685,295
    (CoSA 900,000)
  • Package VI District Automotive Technology Lab
  • Total Bid Package Cost 1,040,733.95
  • Total Project Construction Cost Estimate
    63,373,950.95 (Over-Budget)
  • Construction Budget Shortfall 6,776,560.95
    (Use Bond Contingency Funds)

13
Summary Presentation Roosevelt High School
Replacement Phase V Schematic Design
Presentation 2003 Bond Program
Questions?
Write a Comment
User Comments (0)
About PowerShow.com