Title: Executive Summary 95 and98 Bond Construction Program
1Roosevelt High School Replacement Phase V
Schematic Design Presentation 2003 Bond Program
Garrett J. Sullivan, Executive DirectorConstructi
on Management Engineering Department
July 10, 2006
2Roosevelt High School Program Analysis
- Construct New Academic/Support Facilities/Selected
Athletic Fields/ Parking and Infrastructure for
Roosevelt HS including the following Program
Areas - Administrative Area with Student Health Clinic
and Campus Support Areas - Athletics and Physical Education Program (2
Gymnasiums Support Areas) - Career and Technology Program including the
Engineering Technologies Academy Magnet Program
(24 Classroom Areas) - Dance/PEP/Cheerleader (1 Classroom Area)
- Drivers Education Program (1 Classroom Area)
- Food Service Program (Kitchen Cafeteria
Outdoor Dining Area) - General Instructional and Language Arts including
the DATA Magnet Program Facility (58 Classroom
Areas) - Library / Media Center
- Multi-Use Production Studio (2 Classroom Areas)
- Music Program Band Orchestra Choir (3
Classroom Areas) - JROTC (3 Classroom Areas)
- Special Education (16 Classroom Areas)
- Speech (2 Classroom Areas)
- Theater Arts (1 Classroom with Auditorium and
Black Box Theater) - Maintain the 1995 (DATA) 1998 Bond (Arts
Sciences) Facilities
3Roosevelt High School Program Analysis
- Construct New Academic/Support Facilities/Selected
Athletic Fields/ Parking and Infrastructure for
Roosevelt HS including the following Program
Areas - Administrative Area with Student Health Clinic
and Campus Support Areas - Athletics and Physical Education Program (2
Gymnasiums Support Areas) - Career and Technology Program including the
Engineering Technologies Academy Magnet Program
(24 Classroom Areas) - Dance/PEP/Cheerleader (1 Classroom Area)
- Drivers Education Program (1 Classroom Area)
- Food Service Program (Kitchen Cafeteria
Outdoor Dining Area) - General Instructional and Language Arts including
the DATA Magnet Program Facility (7 of 58
Classroom Areas) - Library / Media Center (Campus and Public Library
Program Areas) - Multi-Use Production Studio (2 Classroom Areas)
- Music Program Band Orchestra Choir (3
Classroom Areas) - JROTC (3 Classroom Areas)
- Special Education (3 of 16 Classroom Areas)
- Speech (2 Classroom Areas)
- Theater Arts (1 Classroom with Auditorium and
Black Box Theater) - Maintain the 1995 (DATA) 1998 Bond (Arts
Sciences) Facilities
4Roosevelt High School Existing Site Plan
5Roosevelt High School Proposed Site PlanPackages
I through IV
6Roosevelt High School Final Site Plan Package V
7Roosevelt High School Package VAdmin/Career
Counseling/Clinic Floor Plan
8Roosevelt High School Package VLibrary Floor Plan
9Roosevelt High School Package VCareer
Technology 1st - 2nd 3rd Floor Plans
3rd Floor
1st Floor
2nd Floor
10Roosevelt High School Replacement Building
Elevations Phase IV and V 2003 Bond Program
View of Campus from Ray Bon
View of Campus from Walzem Road
11Budget Summary
- Construction Account (1) 52,673,177.00
- Design Account 3,930,629.00
- Technology Account 1,280,000.00
- FFE Account (2) 3,120,000.00
- CM Services 1,372,586.00
- Bid Contingency 1,307,830.00
- Construction Contingency 2,616,383.00
- ROCIP Contingency (3) 1,569,395.00
- Grand Total 67,870,000.00
- Note 1 Construction Includes 874,390
for Asbestos Abatement - Note 2 FFE Furniture, Fixtures and
Equipment - Note 3 ROCIP Rolling Owner Controlled
Insurance Program
12Budget-Bid Analysis
- Bid Facts/Assumptions
- Package I and II 1998 Bond Arts Sciences
Facility - Package III/III-A ROTC / Central Plant / Tennis
Courts - Total Bid Package Cost 6,312,412
- Package IV GRECO Building (General Academic
Areas, Fine Arts/Theater Arts/Auditorium,
Athletics/PE/Gyms, Special Education, and Food
Service) - Total Bid Package Cost 36,335,510
- Package V Administration/Counseling, Academic
Areas AB, Library, Career Technology, and
Selected Athletic Fields - Estimated Bid Package Cost 19,685,295
(CoSA 900,000) - Package VI District Automotive Technology Lab
- Total Bid Package Cost 1,040,733.95
- Total Project Construction Cost Estimate
63,373,950.95 (Over-Budget) - Construction Budget Shortfall 6,776,560.95
(Use Bond Contingency Funds)
13Summary Presentation Roosevelt High School
Replacement Phase V Schematic Design
Presentation 2003 Bond Program
Questions?