AMS02 Rebaselining Outbrief ISS PIAICD

Description:

OZ2/Robert Miley/281-226-4968. ISS Program Documents. Payload Integration Agreement (PIA) ... OZ2/Robert Miley/281-226-4968. Mission Integration Plan (MIP) ... – PowerPoint PPT presentation

Number of Views:76
Avg rating:3.0/5.0
Slides: 5
Provided by: nas889
Category:

less

Transcript and Presenter's Notes

Title: AMS02 Rebaselining Outbrief ISS PIAICD


1
AMS-02 Rebaselining OutbriefISS PIA/ICD SSP
MIP/ICD
ISS Payload Mission Integration
Planning/OZ2 Space Shuttle Mission Cargo
Integration Office/MO3 7/15/04
JJ Conwell/MO3 281-483-1178 Robert
Miley/OZ2 281-226-4968
2
Payload Documentation Overview
  • Documentation Requirements
  • ISS Program Space Shuttle Program (SSP)
    Requirements
  • Requirements ensure safety, interfaces, and
    operations compatibility
  • NSTS 1700.7B ISS Addendum Safety Policy
    Requirements for Payloads Using ISS
  • NSTS/ISS 13830 Payload Safety Review Data
    Submittal Requirements
  • NSTS/ISS 18798 Interpretations of NSTS/ISS
    Payload Safety Requirements
  • SSP 57003 Attached Payload Interface
    Requirements Document
  • SSP 57061 Standard Payload Integration
    Agreement for Attached Payloads
  • Joint Agreements required in the following
    disciplines
  • Safety requirements
  • Physical Interface requirements
  • Electrical/Thermal Interface requirements
  • Command Data downlink requirements
  • Operational requirements
  • Crew Training requirements
  • Transportation to/from orbit requirements

3
ISS Program Documents
  • Payload Integration Agreement (PIA)
  • Documents joint agreements to manage and
    execute roles and responsibilities for ISS
    payload integration
  • Schedule - SSP 57113 AMS-02 PIA
  • 11/21/03 - ISS Program Manager did not
    disqualify any AMS-02 ISS requirements or Shuttle
    requirements requested coordination with SSP
  • 6/11/04 - Evaluation request to Space Shuttle
    for SSCN 6999
  • 6/24/04 - Shuttle agreed to early MIP baseline
    development
  • 6/25/04 - OZ agreed to early MIP baseline
    proposal with SSP
  • 7/8/04 - OC agreed to early assignment of a
    Launch Package Manager
  • ISS AMS-02 requirements communicated to Shuttle
    via MIP
  • Implements the existing formal ISS/Shuttle
    process
  • 10/6/04 - PCB for SSCN 6999 PIA approval
  • ISS Interface Control Document (ICD)
  • Defines payload hardware and software
    interfaces with ISS. Details ISS/payload
    interface verification requirements.
  • 2/1/05 PECP 2/9/05 PCB for SSP 57213
    AMS-02 Hardware ICD approval

4
Shuttle Program Documents
  • Mission Integration Plan (MIP)
  • Documents joint agreements between the ISS
    Program and SSP to define and execute the launch
    package integration requirements
  • Only formal mechanism for Shuttle to review and
    approve requirements that the ISS Program is
    levying on Shuttle
  • Schedule -
  • 6/24/04 - Shuttle agreed to early MIP baseline
    development
  • Mission unique MIP encompasses all requirements
    and constraints pertinent to the Launch Package
    and/or Return Complement on this flight
  • Implements the existing formal Shuttle process
    to work payload requirements and the
    Orbiter-to-AMS-02 ICD
  • Nominal MIP template ISS submittal L-21.5
    months Shuttle baseline L-16 months
  • 8/10/04 - AMS-02 MIP kickoff meeting
  • 2/22/05 - SSP Flight Operations Integration
    Control Board for MIP approval
  • Shuttle Interface Control Document (ICD)
  • Defines payload hardware and software
    interfaces with Orbiter
  • 5/17/05 SSP approval of AMS-02 Hardware and
    Software ICD