Title: Total Drilling Cost


1
Total Drilling Cost
  • AC BHMT's Value Proposition
  • Prepared forIndiana Society of Mining and
    Reclamation19th Annual Technolocy Transfer
    SeminarDec. 5th 6th, 2005

2
What is "value"?
  • The AC BHMT "value proposition" is based on drill
    productivity, not "bit life".
  • Drill productivity costs a mining company much
    more than "bit life".
  • Let's take a few minutes to talk about and
    understand what YOUR value proposition is based
    on.
  • Then we will explain ours.

3
Total Drilling Cost
  • Total Drilling Cost is a value concept that
    places its' emphasis on the cost of drill
    productivity.
  • Progressive customers understand and adopt the
    philosophy that the cost of productivity drives
    the economics of a mine.
  • Total Drilling Cost captures and shows the cost
    of drill productivity.

4
The Total Cost of Drilling
  • TDC includes everything it takes to run a drill
  • Labor
  • Power fuel or electricity
  • Drilling tools and supplies
  • Maintenance labor parts
  • Supervision, administration
  • Cost of equipment ownership (lease, purchase, or
    rental payments)
  • With all things considered, drill operating costs
    can exceed US300 per operating hour.





5
Total Drilling Cost
  • Method 1
  • TDC
  • (Bit Price / Meters Drilled)
  • (Drill Operating Cost per Hour / ROP)

6
Total Drilling Cost
  • Example 1
  • Bit cost US5,000
  • Bit life, meters 6,500
  • Penetration Rate 52 meters/hour
  • Rig Cost US200 per hour

7
Total Drilling Cost
  • Example 1
  • TDC
  • Bit Life Productivity
  • (5,000 / 6,500m) (200 / 52 m/hr)
  • 0.77 / meter 3.84 / meter
  • 4.61/meter

8
Total Drilling Cost
  • Example 2
  • Bit cost US5,000
  • Bit life, meters 8,000
  • Penetration Rate 40 meters/hour
  • Rig Cost US200 per hour
  • TDC (Bit Cost / Bit Life) (Rig Cost / Pen
    Rate)

9
Total Drilling Cost
  • Example 2
  • TDC
  • (5,000 / 8,000 m.) (200 / 40 m/hr)
  • .625 5.00
  • 5.63 / meter

10
Total Drilling Cost
  • Example 2
  • TDC
  • (0.63 / m.) (5.00 / m.)
  • 5.63 / meter
  • 1.02 MORE!
  • for a bit that is less productive but has longer
    life?!
  • (52 vs. 40 m/hr., 8,000 vs. 6,500 m)
  • Where is the advantage really found?

11
Total Drilling Cost
  • TDC Method 2
  • TDC
  • (Bit Price / Meters Drilled)
  • Fixed Cost
  • (Variable Cost / Rate of Penetration)
  • Where
  • Fixed Cost Annual Overhead Cost / Annual Meter
    Budget
  • Variable Cost Labor Fuel Supervision
    Repair Parts Repair Maintenance Repair Labor

12
TDC Method 2
  • Fixed Cost Calculation
  • For example 1.50/meter fixed cost
  • 1.50 / meter 900,000 overhead cost for drill
    fleet / 600,000 annual budget meters
  • Ownership cost of the drill fleet (lease, rent,
    purchase payments)
  • Drill Maintence budget for fleet (PM parts,
    fluids, normal wear parts, etc.)
  • Budgeted drilled meters.

13
TDC Method 2
  • Example A
  • Bit cost US5,000
  • Bit life, meters 6,500
  • Penetration Rate 52 meters/hour
  • Fixed Cost 1.50 / meter
  • Variable Cost 95 / hour
  • TDC (5,000 / 6500) 1.50 (95 / 52)
  • TDC .77 1.50 1.83
    4.10

14
TDC Method 2
  • Example B
  • Bit cost US5,000
  • Bit life, meters 8,000
  • Penetration Rate 40 meters/hour
  • Fixed Cost 1.50 / meter
  • Variable Cost 95 / hour
  • TDC (5,000 / 8000) 1.50 (95 / 40)
  • TDC .63 1.50 2.38
    4.51
  • .41 / meter MORE for every meter
    drilled!(246,000 per year based on 600,000 m
    drilled/yr)

15
Production Cost Only
  • What is the cost of producing a single blasthole?
  • Cost Drill Cost per Hour x Time spent drilling,
    hrs
  • 150 per hour x 30 minutes
  • 150 x .5
  • 75 per hole drilled
  • 150 per hour x 20 minutes
  • 150 x .33
  • 50 per hole drilled
  • Productivity costs less!

16
Total Drilling Cost
  • With Total Drilling Cost calculated by any
    method, the productivity (ROP) and drill cost are
    the drivers of the calculation.
  • Bit Price per Meter is a small part of theTDC.
  • Ex. 1, bit price/m, .77 is 17 of 4.61/m.
  • Ex. 2, bit price/m, .63 is 11 of 5.63/m.
  • Ex. A, bit price/m 19, FC VC 81
  • Ex B, bit price/m 14, FC VC 86

17
Total Drilling Cost
18
Total Drilling Cost
  • The cost of productivity is the largest part of
    TDC
  • Spend less time drilling each hole.
  • Choose faster drilling bits.
  • Run bits to give high Penetration Rate and
    reasonable bit life.
  • This will keep the TDC low.

19
Results
Western USA Copper Mining Company
Total Drill Cost (TDC)
2.40
2.00
1.60
BHMT
US Dollars
1.20
Manuf 2
0.80
Manuf 3
0.40
0
01/01/2002 thru 12/31/2002
1/01/2003 thru 12/31/2003
01/01/2004 thru 12/31/2004
01/01/2005 thru 12/31/2005
11/15/2005
20
Results
  • Western USA Copper Mining Cost Savings
  • 2003 vs. 2002 -84,735 1.89/ft
  • 2004 vs. 2003 837,561 1.65/ft
  • 2005 vs. 2004 228,637 1.58/ft
  • Total savings year on year 981,463
  • If no change in TDC
  • Would have spent 22,921,117 (at 1.86/ft, 2002)
  • Actually spent 21,254,869
  • Saved 1,666,248

21
Results
22
Results
  • Canadian Coal Miner Operating Cost Savings
  • 2003 vs. 2002 1,235,237 7.58/m
  • 2004 vs. 2003 520,781 6.30/m
  • 2005 vs. 2004 120,268 5.85/m
  • Total savings year on year 1,876,286
  • If no change in TDC
  • Would have spent 13,888,389 (at 9.91/meter,
    2002)
  • Actually spent 10,101,431
  • Saved 3,786,958

23
Thank You!
  • Questions??