USLIC meeting 71201 - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

USLIC meeting 71201

Description:

Direct peering with Abilene to be established soon at the Qwest PoP in Chicago. ... Qwest PoP (Chicago) AR1-USA. AR2-USA. CERN (Geneva) AR2-CERN. 21 Mbps/T3 ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 16
Provided by: Olivier148
Category:
Tags: uslic | meeting | qwest

less

Transcript and Presenter's Notes

Title: USLIC meeting 71201


1
US Line Consortium (USLIC) meeting (7/12/2001)
  • Operational Report
  • CERN USA PoP status plans
  • New Firewall architecture
  • Market Survey Call for Tender
  • STAR LIGHT DataTAG
  • USLIC budget expenditures
  • GEANT project Update
  • A.O.B.
  • Appendix
  • A - USLIC history
  • B - USLIC connectivity update

2
Operational Report
  • Apart from August 8/9 (24 hour outage with
    partial backup), no major problems to report
  • Direct peering with Abilene to be established
    soon at the Qwest PoP in Chicago.
  • Second (unprotected) STM-1 circuit about to be
    delivered.

3
1) KPNQwest co-location plan (Chicago)
Qwest PoP (Chicago)
Qwest-IP
21 Mbps / T3
KPN- Qwest
CERN (Geneva)
CERN-USA
ESnet
STM-1

STM-1
CERNH9
STM-1
STM-1

STAR LIGHT
STM-1
STM-1
LS1010
STM-1
T3
4
CERNs new firewall technology and topology
Gbit Ethernet
CERNH2 (Cisco OSR 7603)
Gbit Ethernet
Fast Ethernet
FastEthernet
DxmonFE and FDDIbridge
CiscoPIX
Cisco RSP7000
FastEthernet
100/1000 Ethernet
FastEthernet
Cabletron SSR
Securitymonitor
Gbit Ethernet
5
2) KPNQwest co-location plan (Chicago)(dual
unprotected STM-1 circuits)
Qwest PoP (Chicago)
Qwest-IP
Abilene
CERN (Geneva)
21 Mbps/T3
AR1-USA
CERNH9
ESnet
STM-1
STM-1

STM-1
STM-1

STAR TAP
AR2-USA
STM-1
LS1010

T3
6
3) KPNQwest co-location plan (Chicago)(dual
unprotected STM-1 circuits)
Qwest PoP (Chicago)
Qwest-IP
Abilene
CERN (Geneva)
GBE
21 Mbps/T3
AR1-USA
AR1-CERN
ESnet
STM-1
STM-1

STM-1
STM-1

STAR TAP
AR2-USA
AR2-CERN
STM-1
LS1010

T3
7
Main Internet connections at CERN
Swiss National Research Network
IN2P3
Mission Oriented World Health Org.
2.5Gbps
SWITCH
155Mbps
WHO
45Mbps
1Gbps
GEANT (1.25/2500Mbps)
Europe
General purpose Internet connections (Europe/USA/
World)
CERN
2155Mbps
USA
1Gbps
CIXP
Commercial
8
CERNs Distributed Internet Exchange Point
(CIXP)
  • Telecom Operators dark fibre providers
  • Cablecom, COLT, diAx, France Telecom, Global
    Crossing, GTS/EBONE, KPNQwest, LDCom(), Deutsche
    Telekom/Multilink, MCI/Worldcom, SIG, Sunrise,
    Swisscom (Switzerland), Swisscom (France), SWITCH
    (), Thermelec, VTX/Smartphone.
  • Internet Service Providers include
  • 3GMobile (), Infonet, ATT Global Network
    Services (formerly IBM), Cablecom, Callahan,
    Carrier1, Colt, DFI, Deckpoint, Deutsche Telekom,
    diAx (dplanet), Easynet, Ebone/GTS,
    Eunet/KPNQwest, France Telecom/OpenTransit,
    Global-One, Globix, INSnet/Wisper InterNeXt, IS
    Internet Services (ISION), IS-Productions,
    Nexlink, Net Work Communications (NWC), PSI
    Networks (IProlink), MCI/Worldcom, Petrel,
    Renater, Sita/Equant(), Sunrise, Swisscom
    IP-Plus, SWITCH, GEANT, VTX, UUnet.

isp
isp
Telecom operators
c i x p
isp
isp
isp
isp
isp
isp
CERN firewall
Telecom operators
Cern Internal Network
9
Market Survey/Invitation to Tender 2983-IT
  • The existing 2 years contract with KPNQwest
    expires on 31/3/02 and cannot be extended beyond
    that date.
  • So, the market survey/invitation to tender
    exercise needed to be done again.
  • Market survey 2983/IT was launched in April
  • 29 Telecom Providers consulted in 10 countries
    (including Dante)
  • 19 replies received
  • 9 companies did not reply
  • 1 company declined
  • Invitation to Tender issued in early September
  • 17 companies invited
  • 13 responses received
  • Short list include 4 providers. Final choice will
    be made on December 12 by the CERN Finance
    Committee

10
Invitation to Tender 2983-IT CERNUSA access
requirements (2002)
Abilene

Japan
vBNS
STAR TAP
Commodity Internet
Canada
2OC-12
ESnet
CIXP
T3
MREN
Star Light
E3
Production
622 Mbps
CERN
CERN PoP (USA)
ANL
FNAL
2.5 Gbps
StarLight Co-location facility (NWU)
DataTAG
11
DataTAG project
  • The project has now been approved
  • Total budget 3.9 MEuros
  • Duration 2 years
  • Starting date 1/1/2002
  • European Partners
  • PPARC (UK)
  • University of Amsterdam (NL)
  • INFN (IT)
  • CERN (Coordinating Partner)
  • One Technical manager, two engineers and one full
    time administrative assistant will be recruited
  • INRIA (FR) will join during 1Q02 ESA expressed
    strong interest
  • USA Partners
  • NSF
  • DoE through Caltech
  • Main goals
  • Ensure maximum interoperability between USA and
    EU Grid projects
  • Transatlantic test bed for Grid related network
    research
  • Provisioning shall be made through the USLIC, if
    acceptable to the EU,
  • Otherwise through GEANT/Dante, Surfnet,

12
DataTAG STAR LIGHT interconnection
Abilene

DataGrid Tier1 sites
Japan
STAR TAP
vBNS
Italy
UK
ESnet
2.5Gbps lambda
STAR LIGHT
Canada
Netherlands

GEANT
CERN PoP (Chicago)
MREN
3
2.5Gbps lambda (research)
CERN

ANL
FNAL
1 direct connection to the STARLIGHT 2 indirect
connection 3 622Mbps/Gigabit Ethernet over dark
fiber, etc) N.B. The CERN PoP may be co-located
at the STARLIGHT
13
The GEANT project
  • Core 10Gbps circuits from Colt, DT, Telia
  • Access mostly via 2.5 Gbps circuits
  • Routers Juniper
  • CERN
  • CERN SWITCH will share a 2.5 Gbps access
  • CERN purchased 50 of the total capacity (i.e.
    1.25 Gbps).
  • It is also expected that the access bandwith to
    GEANT will double every 12-18 months.
  • The Swiss PoP of GEANT is located at the Geneva
    airport (Ldcom_at_Halle de Fret)

14
(No Transcript)
15
CERN-SWITCH Logical set-up
SWITCH routerAS559
AS559559-513
CAR
STM-16
GEANTrouter
GEANT backbone
2.5 aggregate
CAR
STM-16
CERN routerAS513
AS513513-559
Write a Comment
User Comments (0)
About PowerShow.com