UALR Campus Network
  • December 12, 2002

2
UALR Campus Network
  • Core components have some hardware redundancy
    (power supplies, processors)
  • ADS and FH have UPS systems 30 minutes duration
  • Rest of campus network (building switches, PCs,
    Macs, etc.) are not protected by UPSs

3
UALR Campus Network
  • Loss of Fribourgh Hall Room 213
  • Campus Network and Telephone system down
  • All servers (Banner, email, etc) down
  • Internet 1 and 2 down

4
UALR Campus Network
  • Loss of Administration South
  • Southern part of campus down (ADS, ADN, etc.)
  • Campus Dial-in Down
  • Law School, OCCP Center and Benton Learning
    Center down
  • Telephone system up (depending on status of
    telephone system wiring)

5
UALR Campus Network
  • Priorities Network (after power restored)
  • Telephone System
  • FH213 Network
  • ADS Network
  • ADS/ADN/US Network
  • RH/PP/DSC Network
  • FH213 servers (selected per application priority)
  • Rest of campus buildings

6
To Do Today
  • Considerations
  • - Alternative Sites (Hot and Cold). Potential
    locations are
  • Administration South Basement
  • UAMS
  • - FH213/ADS networks room
  • - Fire Suppression systems
  • - Environmental monitoring systems
  • - Remote Monitoring systems
  • - Seal FH213 ceiling (water protection)
  • - Under floor cable trays

7
To Do Today
  • System Hardware replacement thoughts
  • Replacement agreement with network/server vendors
  • Buy critical backup hardware today, however
    technology is outdated very quickly
  • Networks and systems change/evolve dynamically
    what would be purchased today is not what would
    be purchased 5 years from now

8
To Do Today
  • Structure an agreement with campus departments
    that would
  • Allow a campus department to buy a server for
    their use
  • The administration would subsidize the purchase
  • The department would maintain the server
  • The server would be available for use in a
    disaster recovery situation

9
To Do Today
  • Network attached storage
  • Same type storage devices in FH213 and ADS
  • Integrate a campus backup system as part of
    network attached storage system
  • Use existing campus fiber to maintain exact image
    of FH213 databases

10
Electrical Power
  • Purchase UPS systems for FH213 and Administration
    South
  • Building power restoration would occur in
    parallel with the initiation of recovery plan
  • Restore power for critical buildings
  • FH213 first
  • ADS second
  • ?

11
UALR Campus Network
  • Assuming a total loss of the network hardware
    then
  • Full campus network capability is not needed to
    restore a level of network connectivity to
    prioritize buildings
  • Ethernet switch hardware readily available for
    quick delivery
  • Require agreement with router vendor for quick
    router delivery
  • Full network restoration would be on the order of
    8 to 12 weeks
  • FH213 servers restoration would depend on vendor
    delivery and installation.

12
UALR Campus Network
  • Off campus connectivity would be subject to
    vendor timeframes (today - Alltel)
  • If critical, then consider installing alternative
    off campus network connectivity with a different
    vendor

13
UALR Campus Network
  • Telephone service dependant on
  • Vendor delivery of new telephone switch
  • Restoring FH213 with power and A/C
  • Restoring FH213 computer room environment

14
UALR Campus Network
  • The replacement value of the campus network
    hardware is
  • 1,400,000
  • The replacement value of the systems/servers in
    FH213 is
  • - 1,300,000

15
UALR Campus Network
  • Questions?