Title: Improving Safety
1Improving Safety on the Avenue of the Saints in
Black Hawk County, IA 218 C57
US Hwy 218 Corridor in Black Hawk
County www.co.black-hawk.ia.us
John Miller, Black Hawk Co. Supervisor Chair,
Metropolitan Planning Org.
2Safety Improvements Needed on the Avenue
of the Saints in Black Hawk County
Cedar Valley Coalition Black Hawk County,
Iowa March 2007
3Metropolitan Area Boundary
- Map with volumes surrounding metro
3
218 C57
4US Hwy 218 County C57
the concerns
JANESVILLE
- High speed
- Dangerous intersections
- 32 crashes
- Congestion
- Few gaps
- Increasing volumes
- Poor crossings for
- farm equipment
C- 57
Avenue of the Saints
CEDAR FALLS
WATERLOO
5Facing the challenges
- 1988 Designed as Level II (at-grade
intersections) - 1995 Opened with 10,000 vpd
- 1996 Became Avenue of the Saints
- 2006 Traffic increased by 70 to 17,000 vpd
-
- Many injuries fatalities
- 32 crashes at Hwy 218 / C57
- Highest Crash Frequency Rural Expressway
Intersection in Iowa
6Traffic VolumeHwy 218 Corridor
Increasing
Became Avenue of the Saints
Local Arterial
Designed Opened Today
Future
7Traffic Volume on Primary Highways in Black Hawk
County 2005
17,000
- US Hwy 218
- Avenue of the Saints
- Expressway Design
- At-grade crossings
8,100
US Hwy 63
11,800
10,200
US Hwy 20 Interstate Design
US Hwy 20 Interstate Design
3,800
11,200
US Hwy 218
Interstate I-380 Avenue of the Saints Interstate
Design
4,600
1,940
US Hwy 63
IA Hwy 21
7
8Congestion9-car queue waiting to enter Hwy 218
at C-57
9Intersection
32 crashes
10Iowas Top 5 High Crash Intersections 2001-05
Fatal and Major Injury Fatal Major
Injury Minor Injury Other
Fatal and Major Injury Fatal Major
Injury Minor Injury Other
Total
- Data compiled by Iowa Dept. of Transportation
Office of Traffic and Safety
10
11Other challenges
- Railroad adjacent and parallel to roadway
- Funding support needed for construction
- FY 2008-2012 Five-year Plan to be submitted
July 2007 - Need Congressional award to support IDOT
scheduling
12Finding solutions
- 2005 - Corridor Study supported by
- Black Hawk County 50,000
- Bremer County 50,000
- Iowa Dept. of Transportation 150,000
- Region 7 Planning Agency 400,000
- BH Metropolitan Planning Org. 100,000
- Total 750,000
- 2006 - Recommendation
- Proceed with interchange designs for
- the intersections with C-57 and C-50
13Current progress
- Archaeological review 80 complete
- Historical review 80 complete
- Environmental In process
- Survey will be done Fall 2007
14Current progress
- Positive response by
- Canadian National-Illinois Central Railroad for
- Moving railroad alignment away from highway
Closing 3 at-grade RR crossings
15The proposed project
- Phase 1 Modifying railroad 1,200,000
- Phase 2 Modifying crossings 4,100,000
- Phase 3 Construct interchange 7,800,000
- Total 13,100,000
16Phase 1 Modifying Railroad
Crossings to be Closed
New Alignment
17Phase 2 Modifying Crossings
Intersections to be Closed
Access affected
18Phase 3 Constructing an Interchange
Intersections to be Closed
Interchange
19Current Project Estimates
- Phase 1 Modifying railroad 1,200,000
- Phase 2 Modifying crossings 4,100,000
- Phase 3 Construct interchange 7,800,000
- Total
13,100,000
20INRCOG Meeting and Tour with Iowa DOT
Commissioners to discuss needs
Hudson Mayor Cedar Falls Mayor Waterloo Mayor
2 Commissioners BHC
Supervisor INRCOG Dir. Jeffrey Palmer
Jon Crews Tim Hurley Wayne
Sawtelle Barb McGregor John Miller
Sharon Juon
21 Transportation Needs throughout Black Hawk
County highlighted for IDOT Commissioners
Hwy 218 C57 Intersection
22 Why are we here ? WE NEED
- 13,000,000
- to provide a
- Safer Corridor
- and Reduce crashes by 80
23Questions ?ContactJohn Miller, BH Co.
Supervisor319-833-3074 jmiller_at_co.black-hawk.ia
.usRichard King, BH County Engineer319-833-3008
rking_at_co.black-hawk.ia.us www.co.black-hawk.ia
.us