Bending Current Guidelines: NonStandard Design Approaches - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Bending Current Guidelines: NonStandard Design Approaches

Description:

952 Bikes. Before 2-Way Bikeway Installed. August 2000. 7:00 am ... 1,195 Bikes. 25% increase. After 2-Way Bikeway Installed. August 2002. 7:00 am 7:00 pm ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 17
Provided by: csch5
Category:

less

Transcript and Presenter's Notes

Title: Bending Current Guidelines: NonStandard Design Approaches


1
Bending Current GuidelinesNon-Standard Design
Approaches
  • Cheryl Schmitt
  • Bicycle/Pedestrian Coordinator
  • Santa Cruz, California
  • cschmitt_at_ci.santa-cruz.ca.us
  • http//www.ci.santa-cruz.ca.us/pw/graphics/Bea
    chStBikeway.ppt

2
Beach Street Bikeway
  • Original Condition
  • Demonstration Project - May 2002
  • Permanent Project - December 2005

3
Where is Santa Cruz?
4
Project Location
5
Diverse Interest Groups
  • Bicyclists
  • Commuter
  • Recreational
  • Tourist
  • Pedestrians
  • Children
  • Beach-goers
  • Motorists
  • One-way Circulation
  • Tourists Unfamiliar with Local Streets
  • Parking
  • Long term, Short term, Disabled
  • Loading Zones Commercial, Passenger
  • Large Delivery Trucks
  • Beach Area Businesses
  • The Boardwalk
  • Visitor-Serving Commercial
  • Municipal Wharf
  • Hotel Controversy

6
Diverse Interest Groups
  • Residents
  • Santa Cruz median housing is 750,000
  • Beach Flats Low Income, Hispanic
  • Transit
  • Operators
  • Passengers
  • Train
  • Freight 3x per week
  • Tourist 4x per day peak season
  • Contraflow!
  • Emergency Response
  • Police
  • Fire
  • Ambulance

7
Does a Non-Standard Design Approach Make Sense
Here?
  • Sidepath Suitability Score
  • 7 points or less Most Suitable
  • 8-9 points Somewhat Suitable
  • 10-11 points Least Suitable
  • 12 points or more Not Suitable
  • Beach Street Bikeway 4 points
  • www.bikelib.org/roads/blos/sidepathform.htm

8
Beach Street Traffic Volumes
9
Original Condition
10
Original ConditionRailroad Crossing
11
Demonstration Project
12
Demonstration Project May 2002 - December 2005
13
Permanent Project
14
Permanent Project
15
Permanent ProjectOn-Going Issues
16
  • Cheryl Schmitt
  • Bicycle/Pedestrian Coordinator
  • Santa Cruz, California
  • cschmitt_at_ci.santa-cruz.ca.us
  • http//www.ci.santa-cruz.ca.us/pw/graphics/Bea
    chStBikeway.ppt
Write a Comment
User Comments (0)
About PowerShow.com