Title: B1


1
Case Study Habitat Restoration
  • RCRA Corrective Action Site
  • Oil Refinery
  • E-Pond SWMU
  • Lima, Ohio

2
(No Transcript)
3
(No Transcript)
4
Pre-sampling site visit
B-4
5
B-5
6
B-6
7
B-7
8
(No Transcript)
9
RFI Media Sampling E-Pond
  • 13 Soil borings
  • 29 Subsurface soil samples
  • 5 Surface Soil Samples
  • 6 Groundwater monitoring wells
  • 17 Groundwater samples

B-9
10
E-Pond Risk Assessment Results
  • Ecological - Unacceptable level of risk to
    potential receptors due to elevated levels of
    chromium, antimony, thallium, and PCB-1248 in the
    surface soil.
  • Human Health - Cumulative cancer risk for
    exposure to surface soil for the hunter/
    trespasser is 1 x 10 4.

11
Hazardous Constituents in Surface Soils
12
Planning for Future Use at E-Pond
  • Lisa Appel, Wildlife Habitat Council, tours
    site.
  • Opportunities Report for Wildlife Habitat
    Enhancement at BP Lima's Oil Refinery Properties
    April 2001.
  • Integrate habitat opportunities with site
    conditions.
  • Cleanup goals must meet needs of future use plans.

13
(No Transcript)
14
E-Pond Corrective Measures
  • Protective Cover due to elevated levels of
    constituents in the surface soils.
  • Groundwater Monitoring to assure contamination
    does not migrate off-site.
  • Operation and Maintenance Plan to address the
    long-term integrity of the cover.

15
Protective Cover
  • Synthetic root penetration barrier
  • 12 inches of clean soil
  • Organic augmentation to achieve optimal organic
    content. (From the Lima Wastewater Treatment
    Plant)

16
Components of the Remedy for E-Pond
  • Placement of a cover
  • Site grading, and
  • Ecological revitalization consisting of planting
    native species on the site.

17
B-17
18
(No Transcript)
19
B-19
20
B-20
21
B-21
22
(No Transcript)
23
B-23
24
E-Pond Spring 2002
B-24
25
B-25
26
B-26
27
B-27
28
Conclusions
  • Plan your investigation to evaluate both human
    health and ecological risk.
  • Cleanup requirements must meet future use needs.
  • Mitigate ecological risk.
  • Ecological enhancement project should not become
    an attractive nuisance.

29
B-29
30
The EndFor further information, contact Thomas
Matheson at matheson.thomas_at_epa.gov
31