Title: NAMMA NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update


1
NAMMA - NASA African Monsoon Multidisciplinary
Analysis MissionMission Planning Update
  • Mike Gaunce
  • NASA ESPO
  • June 5, 2006

2
Presentation Overview
  • Mission Schedule
  • PI Requirements Summary
  • Cape Verde Site Survey
  • Cape Verde Info
  • Travel Logistics Info
  • Open Issues

CAVEAT This planning info is subject to change!
3
Current Mission ScheduleJune 2006
4
Current Mission ScheduleJuly 2006
5
Current Mission ScheduleAugust 2006
MRR Mission Readiness Review ORR Operations
Readiness Review
UND Univ. North Dakota SAL Sal, Cape Verde
Airlift C5 aircraft ESPO Earth Science
Project Office
6
Current Mission ScheduleSeptember 2006
7
PI Requirements Summary
  • A request went out 5/25/06 requesting PI input
    by 5/31.
  • Received responses (16) from all PI/Instrument
    groups.
  • Summary of Requirements
  • No wet lab, dry ice, or dedicated instrument
    lab space requirements.
  • Various shipping requirements provided.
  • Sal LN2, compressed gases, and chemicals
    required.
  • Praia No LN2 required. Gases (e.g., helium)
    and chemicals to be shipped via surface.
  • If you have additional support requirements
    (e.g., IT, shipping), please let ESPO know ASAP.

8
Cape Verde Site SurveyMay 29-Jun 3 2006
  • Conducted site survey of Sal and Praia airports,
    hotels, and ops center, and local area.
  • Assessed basing sites for radiosonde balloons and
    SMART-COMMIT trailers.
  • Held meetings with INMG, airport management, AGE
    providers, transportation, communications, etc.
  • Approval granted by Cape Verdean government to
    conduct mission.
  • Site survey report to be prepared.

9
Where on Earth
10
Cape Verde IslandsGeneral Info
  • Republic of Cape Verde. Nine principal islands
    located 300 miles W of Senegal. Capital, Praia.
  • Official Language Portuguese.
  • Currency Escudo (1 USD 86 CV Escudos)
  • Visas Required for all visitors.
  • Telecommunications DSL and mobile phones
    available through national monopoly (Cabo Verde
    telecom). Phones are GSM (900) with SIM and
    phone cards available for purchase. Country code
    for Cape Verde is 238.
  • Time Cape Verde standard time is UTC/GMT -1
    hour.
  • Power 220 V, 50 Hz.
  • USG Per diem 109/80 for Sal Island, 112/74
    for Praia

11
Sal Island
  • DC-8 Ops Amilcar Cabral Airport
  • 16.4 N latitude, 22.6 W longitude, about 20
    km
  • 12 miles north of the city of Santa Maria
  • 2 km from the island capital, Espargos
  • Santiago Island (Praia) 125 miles to the south.

12
Sal Airport
13
Travel Accommodations
  • Hotels
  • Hotel Riu Funana, Santa Maria, 238-242-9064.
  • Full service, inclusive resort.
  • Wireless available in lobby (cost and bandwidth
    in work).
  • 12 mi south of A/P, 2 mi to town center.
  • Payment Visa credit card, cash, or wire
    transfer.
  • Rate 80 Euros/night (103)
  • ESPO (Sue Tolley) submitting room reservations.
  • Need names/dates by June 12, 2006.
  • Transportation.
  • Shuttle bus from hotel to airport (starting Aug
    12th).
  • Rental cars very limited and very expensive
    (100/day).
  • Taxi
  • From Hotel to A/P - 1000 CVE.
  • From Hotel to town - 200-300 CVE.

14
Riu Funana Hotel
15
Travel Accommodations - 2
  • Air travel.
  • Some seats available on DC-8 and C-5.
  • Provide request to Sue Tolley.
  • Commercial Air
  • Currently, there are no U.S. carriers flying
    directly to Sal.
  • South African Airways currently has a direct
    flight from Atlanta.
  • TACV, the Cape Verdean airline, has weekly
    service from Boston.
  • There are connections from Dakar (through Praia).
  • Best (cost) connection via Lisbon (TAP or TACV to
    Sal).
  • Visas.
  • Sue Tolley can submit for visa on arrival for
    U.S. citizens.
  • Will need passport info, etc.
  • Visa can also be obtained through CV Embassy in
    Washington.
  • Health and Safety
  • Do not drink tap water buy bottled water.
  • Take whatever prescription and OTC medications
    you might need with you.
  • The sun is hot!

16
Lab Description Support
  • Lab Space
  • Identified for all locations.
  • Layouts to be provided.
  • Please bring any required power adapters,
    transformers, etc.
  • Network
  • Labs have 0.5? MB minimum shared connection.
  • Ethernet connection plus wireless.
  • DHCP to be provided (details still in work).
  • Please be sure to have virus protection SW on
    your computer.
  • Administration support provided by ESPO.
  • In-field data archive provided by MSFC.

17
Security Access
  • Badging
  • Badging required for lab and ramp access.
  • Sue Tolley collecting required info for badge
    request.
  • Name, DOB, PPN, etc.
  • Copy of passport.
  • Electronic photo (jpeg).
  • Security briefing required upon arrival.
  • Badges must be displayed.
  • 24/7 access.
  • Reflective vest required while on ramp.

18
Shipping
  • All gasses, cryogens, and chemicals will need to
    be shipped.
  • Dry ice availability TBD.
  • ESPO will ship DC-8 instrument aircraft support
    equipment from UND to deployment site via airlift
    and will return the equipment to UND at the end
    of the project.
  • Not handling surface shipments.
  • ESPO (Q. Allison) will be contacting you
    regarding your shipment.

19
Communications
  • Meetings Briefings
  • On science flight days Pre-flight briefing 2
    hours prior to T/O.
  • On non-flight days
  • Flight Planning team mtgs
  • Science team mtgs
  • Public Affairs, Education, and Outreach
  • Press release info in work.
  • Local tours.
  • NAMMA mission web site.
  • In the field
  • Phone lists provided after site arrival.
  • News, schedules, activities posted in office
    areas and web site.

20
Other Misc Information
  • NAMMA web site
  • TBD
  • U.S. State Department Consular Information
    Sheets
  • http//travel.state.gov/travel/cis_pa_tw/cis/cis_1
    083.html
  • Cape Verde portal
  • http//virtualcapeverde.net/news2/index.php
  • Cabo Verde 24
  • http//www.caboverde24.com/

21
Deployment Contact Info
  • ESPO Contact Info
  • Mike Gaunce Project Manager
  • mgaunce_at_arc.nasa.gov 650-604-1266 C
    650-575-9415
  • Marilyn Vasques Dep Project Manager
  • mvasques_at_arc.nasa.gov 650-604-6120 C
    408-431-7560
  • Sue Tolley Project Coordinator
  • stolley_at_mail.arc.nasa.gov 650-604-6033 C
    650-455-4963
  • Quincy Allison Shipping Logistics
  • qallison_at_mail.arc.nasa.gov 650-604-3493 C
    650-455-4964
  • Dan Chirica Network IT
  • chirica_at_cloud1.arc.nasa.gov 650-604-0463
  • DC-8
  • Rick Shetter NSERC Director
  • r.shetter_at_nserc.und.edu 701-777-6040 C
    701-330-2126 
  • Brenda Mulac Mission Manager
  • brenda.mulac_at_gsfc.nasa.gov 757-824-2454

22
Open Issues
  • Secure military airlift.
  • Confirm and install required communications
    infrastructure in Sal and Praia.
  • Note Please provide hotel, travel, visa, and
    badging info to ESPO ASAP.

23
(No Transcript)
24
Back-up Charts
25
MODISW. Saharan Dust5-19-05