Title: DEFENSE ENERGY SUPPORT CENTER KOREA


1
DEFENSE ENERGY SUPPORT CENTER KOREA
2
AGENDA
  • CURRENT QUALITY COVERAGE
  • BUSINESS UPDATE
  • FAS CONVERSION
  • WARFIGHTER ISSUES/INITIATIVES
  • MRE PROGRAM
  • OPTIMIZATION INITIATIVE
  • POST TKP BULK POL SPT
  • WHNS

3
DESC-K / DCMA QUALITY COVERAGE
Uijongbu

22 Contracts In 15 Locations Plus Okinawa

Suwon
Yechon
Osan
Daesen
Pohang
Pyongtaek
Kunsan
Ulsan
ULSAN
Taegu AB
ONSAN
Kwangju
Waegwan
Kimhae
Yosu
Onsan
YOSU
4
BUSINESS UPDATE FY 02
  • Tanker/Barge Receipts/Issues
  • Pohang 46.3 mil /59 mil
  • Kunsan 12.2 mil/11.4 mil
  • Total 58.5 mil/70.4 mil

Air Force Receipts/Issues 41 mil/43.2 mil
Rail Tank Car Deliveries 23.2 mil
Pipeline Throughput 58 mil
DFSP Receipts/Issues 59.8 mil/58.7 mil
Army Receipts/Issues 18 mil/17.4 mil
Tank Truck Deliveries 36.4 mil
5
FAS STATUS (ARMY)
CAMP CASEY 1026
CAMP BONIFAS 1026
AREA I
TONGDUCHON

CAMP EDWARDS 1027
CAMP CASTLE 1026
CHUNCHON
GEUMCHON
UIJONGBU
CP STANLEY 1026
SEOUL
AREA II
AREA III
YONGSAN
CAMP RED CLOUD 1026
WONJU
SONGNAM
CP PAGE 1026
OSAN
PYONGTAEK
K-16 AIRFIELD 1027
CAMP LONG 1026
WAEGWAN
YONGSAN 1027
KUNSAN
CAMP EAGLE 1026
TAEGU
AREA IV
PUSAN
CP CARROLL 1027
CP HUMPHREYS 1026
CAMP WALKER 1027
CP HIALEAH 1027
6
FAS STATUS (AIR FORCE)
TONGDUCHON

CHUNCHON
GEUMCHON
UIJONGBU
AIR FORCE DFSPS 100 CONVERTED TO FAS 1027
SEOUL
YONGSAN
SUWON
WONJU
SUWON
SONGNAM
OSAN
PYONGTAEK
OSAN
WAEGWAN
KUNSAN
KUNSAN
KWANG JU
TAEGU
PUSAN
TAEGU
KWANG JU
7
WARFIGHTER ISSUES/MAJOR INITIATIVES
  • MRE PROGRAM
  • OPTIMIZATION STUDY
  • POST TKP BULK POL SPT
  • WHNS

8
DESC KOREA MRE PROGRAM
9
DESC KOREA MRE PROGRAMPROCESS
  • 5 Yr Program Designed to Transform Koreas POL
    Infrastructure
  • Conducted in 3 phases using innovative project
    mgt processes
  • Expected Completion is FY 03

PROGRAM GOAL STATE OF THE ART FACILITIES THAT
ARE SAFE AND ENVIRONMENTALLY SOUND
  • MATOC
  • STANDARDIZED DESIGN/
  • CONSTRUCTION PKGS

10
PHASE ONE ORGANIZATIONS
DEFENSE ENERGY SUPPORT CENTER
FACILITIES DIVISION
DEFENSE ENERGY SUPPORT CENTER-TAEGU FACILITIES
DIVISION
AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE

KOREA
THE IT CORPORATION
PROGRAM MANAGER
THE IT CORPORATION PROJECT
MANAGER
THE IT CORPORATION
TECHNICAL SERVICES
THE IT CORPORATION SITE
MANAGERS
SAMSUNG (Contractor)
MATIS (Contractor)
PINETREE (Sub-Contractor)
11
PHASE TWO THREE ORGANIZATION
DEFENSE ENERGY SUPPORT CENTER
FACILITIES DIVISION

2 Contract Vehicles Vice 1
DEFENSE ENERGY SUPPORT CENTER-KOREA
NAVAL FACILITIES ENGINEERING SERVICE CENTER

AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE
MATOC Sub-Contractors
SHAW ENVIRONMENTAL
WESTON INCORPORATED
SITE MANAGERS
Sub-Contractors
12
EQUIPMENT DELIVERIES
KOYANG
UIJONGBU
SEOUL
INCHON
KANGNAM
KIMPO
SONGNAM
SUWON
OSAN
PYONGTAEK
DAESAN
YECHON
TAEJON
POHANG
WAEGWAN
POHANG BD
K-2
ULSAN
ONSAN
KIMHAE
KUNSAN
MECHANICAL EQUIPMENTS PARTS (TANKS, PUMPS,
DISPENSERS, ETC., SHIPPED FROM CONUS AND BEING
TRANSPORTED OVERLAND TO EACH FACILITY AS A TURN
KEY OPERATION
PUSAN
KWANGJU
YOSU
13
TMP UPGRADE SPECIFICATIONS
  • Facility Upgrade Includes
  • New Product Storage Tanks (JP8, MOGAS and Diesel)
    and Pads
  • Upgrade Product Pumps, Pipes and Dispensers
  • Upgrade Oil-Water Separator
  • Upgrade Electrical Distribution System and ATG
  • Installation of Double-Walled POL PVC Pipeline
  • Upgrade Water Line and Installation of Fire
    Hydrant
  • Installation of Drum Storage and Handling Area
    (As Required)
  • Installation of Canopy and Dispenser Islands
  • Pavement Upgrades
  • Installation / Upgrade of Spill Containment
  • Installation of Emergency Eye Wash/Shower Station
    and Water Line

14
PHASE ONE SITE LOCATIONS

CAMP BONIFAS TMP
CAMP CASEY TMP
TONGDUCHON
AREA I

PANMUJON
CHUNCHON
CAMP EDWARDS TMP/Rail Head-Bulk Issue
CP PAGE Hot Refuel/TMP
UIJONGBU
SEOUL
AREA II
AREA III
YONGSAN
CAMP RED CLOUD TMP
CAMP LONG TMP
WONJU
SONGNAM
OSAN
PYONGTAEK
YONGSAN TMP
CAMP EAGLE Hot Refuel/TMP
K16 AIRFIELD Cold Refuel
WAEGWAN
KUNSAN
TAEGU
PUSAN
15
PHASE TWO SITE LOCATIONS

TONGDUCHON
AREA I
SUWON AB (9 Projects)
PANMUJON
CHUNCHON
UIJONGBU
SEOUL
AREA II
AREA III
YONGSAN
OSAN AB (14 Projects)
PYONGTAEK (4 Projects)
WONJU
SONGNAM
SUWON
OSAN
PYONGTAEK
KUNSAN AB (9 Projects)
WAEGWAN
KUNSAN
TAEGU
PUSAN
16
PHASE THREE SITE LOCATIONS

TONGDUCHON
AREA I

PANMUJON
CHUNCHON
UIJONGBU
SEOUL
AREA II
AREA III
YONGSAN
CAMP CARROLL (4 Projects)
WONJU
SONGNAM
SUWON
OSAN
TAEGU AB (10 Projects)
PYONGTAEK
CAMP WALKER (2 Projects)
WAEGWAN
KUNSAN
KWANG JU AB (11 Projects)
TAEGU
KWANG JU
PUSAN
17
CAMP LONG (BEFORE)
18
CAMP LONG (AFTER)
19
CAMP EAGLE (BEFORE)
20
CAMP EAGLE (AFTER)
21
CP CASEY/CASTLEFY02 - MILCON
22
WAY AHEAD (OPTIMIZATION)
  • Robust DESC MRE Upgrade Program
  • State-of-the-Art Petroleum Facilities In Korea
  • Gas Station Upgrades
  • Hot Point Upgrades
  • Bulk Facilities Upgrades
  • Korea Facilities Ideal For GOCO Operations
  • Camp Casey MILCON (replaces Camp Castle Facility,
    FY02)
  • Highly trained contractors
  • Provides for Military Training Base
  • Provides Environmental compliance
  • Eliminates / Reduces facility Down Time
  • No need for Service to submit MRE projects for
    the facility

23
OPTIMIZATION MILESTONES
  • Project Initiation Request from the Activity
    (SCP)
  • Milestone One Initial site visit requirements
    review, (DESC Service Facility personnel)
  • Milestone Two Requirements refinements and
    solution development (DESC, Service Facility
    personnel)
  • Milestone Three Contract solicitation Award
    (DESC)
  • Final Projects ends with a post project review
    (DESC, Service Facility personnel)

24
POST TKP BULK POL SUPPORT
TKP/SNP ENDSTATE
DESC COMMITTED IN ITS SUPPORT OF USFK EFFORT
Significance The Trans Korean Pipeline (TKP)
is integral to fuel support operations,
particularly during contingency. The ROKG
announced plans to close the TKP on or about 30
Sep 02. For the past 5-6 years USFK, DESC, and
MND have been developing and refining POL support
plans for US Forces Korea during Armistice and
Contingency in a Post-Trans Korea Pipeline
environment. We are still working out the
details of pipeline support in order to close the
TKP. LTC Gaslin, USFK SAPO
25
WHNS
DESC PROVIDES INPUT/TECHNICAL ADVICE DURING
PLANNING AND IS INDUSTRY INTERFACE IN CONTINGENCY
DESC CDR SERVES AS SAPO IF ONE IS NOT ASSIGNED
BOTTOM LINE DESC-K MUST STAY INVOLVED IN WHNS
PROCESS
26
?? QUESTIONS ??
27
DESC KOREA ORGANIZATION
COMMANDER LTC HEIDI GRAHAM DSN 315.764.5147
DEPUTY COMMANDER MR MIKE ANDERSON DSN 315.764.5131
POL OPNS MAJ Wayne Goulet DSN 315.764.5139
QUALITY (Lead QSR) Mr Leo Burruel DSN 315.764.7431
MGMT SPT Mr Brian Adkins DSN 315.764.5183
FACILITIES Mr Rick Rivera 315.764.5089
INV MGMT
TRANS MGMT
QUALITY SUPPORT TEAM NORTH
QUALITY SUPPORT TEAM SOUTH
OPNS