3HIGHWAYS Investment Opportunities 2008
42nd STAGE OF CONCESSIONS PHASE 2 Investment
Opportunities 2008
- BR 116-324/BA
- Total Extension 637 km
- Total Investment R 2 billion
- Includes the duplication of the 524 km of Br 116.
plus the layout around Feira de Santana - TIMETABLE
- CND approval by 2/27/2008
- Public hearings until 2/20/2008
- Assessment by the TCU by 5/9/2008
- Publication of the Announcement by 5/30/2008
- Auction by 7/31/2008
53rd Stage of Highways Concessions
Auctions Investment Opportunities 2008
63rd Stage of Highways Concessions
Auctions Investment Opportunities 2008
BR 381/MG
BR 060/DF-GO
BR 153/GO
BR 101/BA
BR 101/ES
BR 116/MG
BR 040/DF-MG
3rd Stage CONCESSIONS
Phase 1
BR 470/SC
Phase 2
7RAILROADS Investment Opportunities 2008
8NORTH-SOUTH RAILROAD CONCESSION OF SOUTH
SECTIONInvestment Opportunities 2008
Barcarena
Itaquí
Pecém
Estreito
Eliseu Martins
Araguaína
- CONCESSION OF SOUTH SECTION
- Palmas (TO) Rubinéia (SP)
- Wide gauge
- Total Extension 1443 km
- Total Investment R 4.6 billion
Salgueiro
Vilhena
Palmas
Suape
Luis Eduardo
Sorriso
Alvorada
Ibotirama
Uruaçú
Brumado
Rondonópolis
Anápolis
Ilhéus
Alto Araguaia
Belo Horizonte
Rubinéia
- TIMETABLE
- Conclusion of Studies 2nd Sem/08
- Public Hearings 2nd Sem/08
- Assessment of TCU end of 2nd Sem/08
- Publication of Announcement 1st Sem/09
Porto Murtinho
Araraquara
Panorama
Itaguaí
Santos
Section to be granted
9HIGH SPEED TRAIN RIO/SÃO PAULO/CAMPINAS
Investment Opportunities 2008
Travel Time 25 min
Travel Time 85 min
- Total Extension 518 km
- Estimated investment - US 11 billion
- Connection of Galeão RJ. Guarulhos and Viracopos
SP airports - BNDES contracting with IDB international
consulting resources for - analyzing demand
- assessing the layout
- subsidizing announcement models
- World Bank contracting international specialists
for - technical supervision of the project
- follow-up of the bid process
- TIMETABLE
- Conclusion of Project Feasibility Study and
Modeling - August/2008 - Conclusion of Bid Announcements - October/2008
- Beginning of Public Hearings - November/2008
- Concession bid 1st semester/2009
10STUDIES FOR NEW WIDE GAUGE CONCESSIONS
Investment Opportunities 2008
Existing sections
Sections under construction
Itaquí
Barcarena
New railroad connections
Pecém
Estreito
Eliseu Martins
Araguaína
Vilhena
Suape
Salgueiro
Palmas
Luis Eduardo
Sorriso
Alvorada
Ibotirama
Uruaçú
- Feasibility Study for New Railroad Connections
- Contracted
- West East Integration Railroad Ilhéus-Alvorada
- Conclusion of EVTE and demand study 1st sem/08
- Basic project 2nd Sem/08
- To be contracted
- Extension of the North-South Railroad
Anápolis-Panorama-Porto Murtinho - Midwest Integration Railroad Uruaçu/GO
Vilhena/RO - Connection of the Trans-Northeastern Railroad
with the North-South Railroad Eliseu
Martins-Estreito
Brumado
Rondonópolis
Anápolis
Ilhéus
Alto Araguaia
Rubinéia
Belo Horizonte
Porto Murtinho
Araraquara
Itaguaí
Panorama
Santos
11BI-OCEAN RAILROAD CORRIDOR STUDIES METRIC
GAUGE Investment Opportunities 2008
PERU
- Feasibility Studies to
- Revitalize and expand existing connection
capacity - Santos SP - Corumbá MS Santa Cruz BOL - Salta
ARG Antofagasta CH - Cascavel PR - Paranaguá PR - Santos SP
- Construction of new railroad connections
- Paranaguá PR - Cascavel PR - Foz do Iguaçu PR
Resistência ARG - Salta ARG - Antofagasta CH - Paranaguá PR - Cascavel PR Maracajú MS
Resistência ARG - Salta ARG - Antofagasta CH
BOLIVIA
SANTA CRUZ
BRAZIL
SUCRE
CORUMBÁ
MARACAJÚ
POCITOS
PONTA PORÃ
ANTOFOGASTA MEJILLONES
PARAGUAY
CASCAVEL
SANTOS
SALTA
FOZ IGUAÇÚ
PARANAGUÁ
SOCOMPA
CHILE
RESISTENCIA
ARGENTINA
URUGUAY
BUENOS AIRES
SECTIONS TO BE CONSTRUCTED
SECTIONS TO RECOVER
SECTIONS IN GOOD CONDITIONS
12PORTS Investment Opportunities 2008
- National Dredging Program
13NATIONAL DREDGING PROGRAM Investment
Opportunities 2008
14(No Transcript)
15GENERATION AND TRANSMISSION OF ELECTRIC POWER
Investment Opportunities 2008
16GENERATION OF ELECTRIC POWER Investment
Opportunities 2008
- 4 auctions 7000 estimated MW
- Jirau HEP Auction - 3300 MW May/08
- Reserve Energy Auction Biomass delivery in
2009 and 2010 1st sem/08 - Auction for delivery in 2011 1st sem/08
- Auction for delivery in 2013 2nd sem/08
17TRANSMISSION OF ELECTRIC POWER Investment
Opportunities 2008
- 3 AUCTIONS 11 ventures 5691 km
- 1st auction
- 2627 km focus on Tucuruí-Manaus-Macapá
- 1st sem/08
- 2nd auction
- 362 km
- 1st sem/08
- 3rd auction
- 2702 km focus on Porto Velho-Araraquara LT
of the Madeira River Complex - 2nd sem/08
18TRANSMISSION AUCTIONS Investment Opportunities
2008
19OIL AND NATURAL GAS Investment Opportunities 2008
20OBJECTIVES AND PROGRAMS
AUCTIONS AND BIDS Investment Opportunities 2008
- New Round of Oil and Natural Gas Bids to give
continuity to the exploratory process - 51 bids for project elaboration. material
supplying and construction and assembly - 1st semester 21 bids
- 2nd semester 30 bids
- Biodiesel 2 auctions in the 1st semester to meet
projected demand after June/08
21(No Transcript)
22HOUSING Investment Opportunities 2008
23PAC HOUSING
Total Investments Contracted - R 41.8 billion
R million
24SANITATION Investment Opportunities 2008
25PAC SANITATION
Total Investments Contracted - R 15 billion
R million