Targets for the SG 13 Caracas Meeting - PowerPoint PPT Presentation

About This Presentation
Title:

Targets for the SG 13 Caracas Meeting

Description:

Targets. for the SG 13 Caracas Meeting. Working Party 4/13 ... Planned WP 4/13 Caracas Meeting Schedule. Question 4/13. Broadband and IP Related Resource ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 10
Provided by: neals7
Category:

less

Transcript and Presenter's Notes

Title: Targets for the SG 13 Caracas Meeting


1
Targets for the SG 13 Caracas Meeting
Working Party 4/13 Network Performance and
Resource Management
  • Topic Overview
  • WP 4/13 Structure and Responsibilities
  • Planned Meeting Schedule
  • Key Technical Issues
  • Expected Results

2
(No Transcript)
3
Planned WP 4/13 Caracas Meeting Schedule
4
Question 4/13 Broadband and IP Related Resource
Management
  • Issue -- AAL2 Resource Mgmt (D111, D112, D144)
  • Burstiness of AAL2 connections strongly impacts
    link utilisation for a given delay quantile. For
    a fixed delay quantile, utilisation decreases
    with increasing burst size.
  • Shaping can be used to control bursts, increase
    utilization
  • Connection admission control must be based on
    AAL2 link characteristics (ALC) that describe
    traffic burstiness
  • Expected Results -- New I.371 Text on AAL2 RM
  • (Developed jointly with Q2/13)
  • Q4/13 will also progress work on Draft Rec.
    Y.iptc (Traffic
  • Control and Resource Management in IP-Based
    Networks)

5
Question 6/13Performance of IP-Based Networks
and the Emerging Global Information Infrastructure
  • Issue -- IP Packet Transfer QOS Parameters,
    Objectives
  • New parameter (e.g., SESIP) to specify packet
    loss clustering
  • Metric(s) and objectives for IP packet delay
    variation (jitter)
  • Delay specifications for long complex paths
  • IP network Hypothetical Reference Paths,
    allocation rules
  • Possible new Recommendation on QOS at the TCP
    layer
  • Expected Result -- Stable Y.1541, Revision for
    Y.1540
  • IP/MM Workshop recommended Joint Meeting
    (SGs 13, 16, 12, 11) to harmonize QOS Classes

6
(No Transcript)
7
Question 7/13B-ISDN/ATM Cell Transfer and
Availability Performance
  • Issue -- Rec. I.356 performance allocation models
  • ATM/ADSL access links, ATM/IP Interworking (D138)
  • Use of inter-operator (rather than country-based)
    network models (TD11)
  • Expected Results Proposed new performance models
    and allocation methods

8
Question 8/13Transmission Error and Availability
Performance
  • Issue -- G.optperf allocation model (D101)
  • Proposal Change "international paths" to
    "multi-operator paths crossing international
    borders"
  • Questions
  • Should fixed G.828 terminating country block
    allowance (17.5) be allocated to terminating
    domain? Should the routing factor for the
    terminating domain be copied from G.828?
  • How many intermediate domains should be assumed?
    (Proposal 4)
  • How allocate to intermediate domains? (Proposal
    use block allowance and routing factor, satellite
    allocation from G.828)
  • Likely Results New HRP and allocation proposals

9
Question 9/13Call Processing Performance
  • Issue -- Draft Y.1530 QOS Classes
  • Proposals
  • Specify multiple call processing QOS classes for
    Hybrid IP networks to meet varying service
    requirements (D126)
  • Implement International Emergency Preference
    Scheme (E.106) in Hybrid IP networks (D117)
  • Expected Result New call processing QOS class
    structure, including a default best effort
    class
  • IEPS requirement could be documented by
    defining an emergency priority QOS class
Write a Comment
User Comments (0)
About PowerShow.com