Title: Portable Broadband Seismology


1
Portable Broadband Seismology
Part 8 Best Field Practices
  • Jakarta, Indonesia
  • May 11-13, 2006
  • Bruce Beaudoin
  • Marcos Alvarez

2
Pre-deployment Equipment QA
  • QA all of your equipment in a controlled, lab
    environment prior to deployment.
  • Test your recording parameters in the lab.
  • Know your equipment
  • Be familiar with your installation plan.
  • Practice setting up a station in the lab and in a
    simulated field environment.

3
Prepare
  • Develop deployment and servicing sheets.
  • Know the metadata you will require before you are
    in the field.
  • A well stocked tool box is a must.
  • Think spares, especially small items that can be
    misplaced.

Identify and collect the construction materials
you will need for your seismic station.
4
Site Selection
  • Far from human-generated noise (roads and
    machinery)
  • In a temperature-stable environment
  • Far from the ocean
  • On solid (competent) rock
  • Sky view
  • Good Drainage
  • Secure

5
Vault Site Construction
  • Provide sensor coupling to Earth
  • Protect the instruments
  • Flooding
  • Temperature fluctuations
  • Animals
  • Secure

6
Field Practices
  • Take comprehensive field notes.
  • If it is not documented, it didnt happen
  • Take your time.
  • Make sure you will record useful data.
  • The Fort Five
  • Do you have power?
  • Does the seismometer produce signal?
  • Is your instrument programmed correctly?
  • Do you have timing?
  • Is your data being telemetered or stored on-site?

7
Monitor Your Site Data
  • Monitor your sensor outputs before you close the
    vault and/or leave the site.
  • Do a service run within 2 weeks of the initial
    deployment.
  • Monitor your state-of-health channels.
  • Look at waveforms.