Presentation to the FDA AntiCounterfeiting Drug Initiative Public Workshop PowerPoint PPT Presentation

presentation player overlay
1 / 12
About This Presentation
Transcript and Presenter's Notes

Title: Presentation to the FDA AntiCounterfeiting Drug Initiative Public Workshop


1
Presentation to the FDA Anti-Counterfeiting Drug
Initiative Public Workshop Vendor Display
  • What is Needed for Widespread RFID
    Implementation
  • Stephen Perlowski
  • Vice President, Industry Affairs
  • NACDS

2
Agenda
  • RFID vs. 2-D Bar Code
  • NDC in the EPC
  • Data Management
  • Initiating a Pedigree

3
RFID vs. 2-D Bar Code
  • Operational Efficiency
  • One improves
  • One detracts
  • Reduced Errors
  • Eliminate Line of Sight
  • Better Manage Inventory

4
Need for the NDC within the EPC
5
Need for NDC within EPC
  • Patient Safety
  • Patient Profiles
  • DUR
  • Drug Recalls
  • Drug Interactions

6
Need for NDC within EPC
  • Supply Chain Benefits
  • Receiving Verification
  • Pedigree Authentication
  • Processing Returns Damages
  • Item Set-up
  • PO Transmission
  • Invoice Processing and Remittance
  • Physical Inventory Cycle Counting

7
Need for NDC within EPC
  • In-Store Uses
  • Verification of receipt
  • Pedigree Authentication
  • Storage Item Set-up
  • Dispensing
  • Inventory Control
  • Process Returns
  • PO Transmission
  • Invoice Processing and Remittance
  • Payment from 3rd Parties

8
Need for NDC within EPC
  • NDCs reside in multiple databases within the same
    store one for inventory, one for operations
  • Many current processes rely on NDCs including
    Third Party Pre and Post adjudication processes
  • Accounting systems Utilize NDC to reconcile
    payment

9
Impact on Pharmacy if NDC is not Included
  • Additional investments would have to be made
  • Internet access for all stores
  • Time to access databases for each manufacturer
  • Cost to develop Interface system to various web
    sites
  • Add at least 3 seconds to every transaction
  • What happens if system goes down?
  • Cost to develop systems to receive and validate
    the cross reference and to maintain integrity of
    cross reference tables

10
Data Management
  • Three Potential Paths
  • Central Database
  • Multiple Databases
  • Peer to Peer

11
Data Management
  • Three Potential Paths
  • Central Database
  • Multiple Databases
  • Peer to Peer

12
Electronic Pedigree
  • Universally Recognized Fields
  • Pedigree Fields Initiated by Manufacturer
Write a Comment
User Comments (0)
About PowerShow.com