Potential Small Business Opportunities Dissecting The - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Potential Small Business Opportunities Dissecting The

Description:

Potential Small Business Opportunities Dissecting The Installation Planning Process For Possible Business Opportunities SPAWAR Charleston Code 5.5.3.M.5 – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 15
Provided by: charlesto4
Category:

less

Transcript and Presenter's Notes

Title: Potential Small Business Opportunities Dissecting The


1
Potential Small Business Opportunities
Dissecting The Installation Planning Process For
Possible Business Opportunities
  • SPAWAR Charleston
  • Code 5.5.3.M.5
  • Roy Johnson

2
SSC-C FY-07 High Level Profile
3
High Level Potential Opportunities
4
My World
5
Installation Planning Opportunities
  • Work Plan Development
  • Installation Planning
  • Installation Design
  • Pre-Installation
  • Installation Performance
  • System Turnover

6
Work Plan Development Opportunities
  • VALIDATE FEASIBILITY
  • Deliver a Work Scope
  • COST ESTIMATING AND SCHEDULING
  • Deliver Cost Estimate
  • UPDATE AND REVIEW WORK PLAN REQUIREMENT
  • Deliver Work Plan
  • CUSTOMER COORDINATION

7
Installation Planning Opportunities
  • DEVELOP POAM
  • Develop Detailed Installation Schedule
  • SYSTEM REQUIREMENTS
  • Develop System Testing and Cutover Plan
  • SITE SURVEY
  • Conduct a Detailed Site Survey

8
Installation Design Opportunities
  • REVIEW INSTALLATION DESIGN STANDARDS
  • SPECTRUM ASSIGNMENT E3
  • DEVELOP BESEP
  • DEVELOP IDP
  • DEVELOP SOVT
  • DEVELOP TRAINING MATERIALS
  • DEVELOP ILS CHECKLIST
  • DEVELOP PITCO PROCEDURES
  • ORDER INSTALLATION MATERIALS
  • ORDER INSTALLATION MATERIALS

9
Pre-Installation
  • PREFABRICATION AND PITCO
  • DEVELOP INSTALLATION IN-BRIEF AND OUT-BRIEF
  • VERIFY EQUIPMENT, MATERIALS, AND SITE
    PREPARATIONS
  • FINAL INSTALLATION PREPARATIONS

10
Installation Performance
  • INSTALLATION SAFETY
  • CONDUCT IN BRIEF
  • COORDINATION AND LIAISON
  • ADMINISTRATION
  • INSTALLATION REPORTING
  • CONDUCT INSTALLATION
  • SYSTEM QA AND CHECKOUT

11
System Turnover
  • COMMENCE SOVT
  • ARRANGE AND CONDUCT TRAINING
  • TYPE ACCREDITATION/CERTIFICATION
  • LOGISTICS SUPPORT AND CONFIGURATION MANAGEMENT
  • CUT-OVER
  • OUT BRIEF
  • POST-INSTALLATION ADMINISTRATION

12
Typical Installation Planning Deliverables
  • Testing and System Acceptance Plan
  • Integrated Logistics Support Plan
  • Installation Design Plan/Package
  • Transition Plan
  • Circuit Cutover Plan
  • BESEP
  • Integrated Logistics Support (ILS) Plan
  • Pre-installation Test Check-out (PITCO) Plan
  • Project Risk Report
  • Project Financial Status Report
  • Consolidated Delivery Order Matrix
  • Antenna Layout EMI Survey Report
  • Project Change Requests (PCRs)

13
Summary of Installation Planning Process
14
Final Suggestions
  • Develop a unique capability
  • Technical
  • Project Management
  • Develop business relationships within SSC-C
    technical codes
  • Team with contractors who hold SSC-C contracts
  • Continue to network.like today
  • Bug Bob Meddick daily ?
Write a Comment