Title: Barsan Co
1 Project Development Railway Subway
Substation Transmission Oil Gas
Petrochemical Water Waste Water Industrial
Projects
2About Barsan
- BARSAN, is the single-source solution for
concept-to-completion, - Seamless project execution.
- Every aspect of Planning, Design, Procurement,
Construction, Start-up, - Commissioning and Financing is supported to
produce the most reliable - processing facilities.
- Clients can count on experienced, professional
staff for open and honest - communication.
- The BARSANs fine tuned project management team,
will safely and - efficiently guide each project to peak
performance and profitability based - on the most advanced management techniques
(PMBOK). - Our Company's activities encompass the Power
Transmission networks and - Substations, Power plants, Oil, Gas
Petrochemical, Railway - Subway, mine and Mining industries.
3Services
1- PROJECT MANAGEMENT SERVICES Project
Management Construction Management Quality
?Management Time, Cost Risk Management 2-
ENGINEERING SERVICES Feasibility
Studies Front-End Engineering Design Detail
Engineering Site Technical Services HSE Risk
Analysis Technical Consulting 3- PROCUREMENT
SERVICES Market Survey, and Supplier
Selection Price Inquiry and Negotiation Purchasi
ng, Inspection and Shipment
4- CONSTRUCTION WORKS ? Civil Construction Mecha
nical Installation Electrical Installation Instr
umentation Installation 5- COMMISSIONING
ACTIVITIES Pre-commissioning Commissioning Sta
rt up 6-FINANCIAL SERVICES Financial
Analysis Project Financing Financial Risk
Management
4Barsans Organization Chart
5Barsan Human Resource Comparison Charts
6Major Projects
Railway Subway Projects
79 units Traction Substations 3 Medium Voltage
Dispatching Substations
- Client SHIRAZ URBAN RAILWAY ORG
- Project type EP
- Partner Company Siemens (Germany)
- Transfo (Switzerland)
- Scope of Work ? Project Management
- ? Performing further engineering services
- ? Simulation
- ? Procurement
- ? Supervision on Installation
- ? Training
- ? QA/QC Management
- Brief Description
- Supplying Equipment, supervision on installation
and commissioning of 9 units of traction
substations and 3 units of medium voltage
distribution substations. - Supplying DC and medium voltage switching
equipment. - Supervision of SCADA system of traction
substations and MV dispatching substations
826 Km Overhead Catenary System (O.C.S)
Client SHIRAZ URBAN RAILWAY ORG Project
type EPC Partner Company PKAG Company
(Switzerland) Siemens (Germany)
K M (Switzerland) Scope of
Work ? Project Management ? Reverse
Engineering ? Formal Designing and Simulation
of Mechanical and Electrical System of
the Overhead
Network ?Procurement ? Cables ?
Installation ?QA/QC Management Brief
Description Designing, Supplying Equipments and
Implementation of OCS (Overhead
Catenary System) for line 1 of Shiraz
Urban Railway. Location Shiraz Line
1 Project Period 30 Months
98 units Traction Substations
- Client Tabriz Urban Railway
- Project type EP
- Partner Company SECHERON (Switzerland)
- Schneider (Italy)
- Scope of Work ? Project Management
- ? Basic Design
- ? Detail Design
- ? Procurement
- ? Super vision on Installation
- ? Commissioning
- ? QA/QC management
- Brief Description
- Carry out Reverse Engineering Services
- Simulation Supplying DC Equipments
- Supplying Medium Voltage Switching Equipment
10Electrification of Existing Tehran-Mashhad
Railway ( 2350 Km )
Client Islamic Republic of Iran Railways (
RAI) Project type EPCF Partners company
Tam- Wagonpars- Hirbodan Foreign
Partner Siemens- Alstom Scope of
Work ? Project Management ? Performing
further Engineering Services ? Simulation ?
S.S extension equipments, Transmission line
? Procurement Traction S.S of OCS system ?
SCADA System
? Supplying of Locomotives ?
Installation ? Maintenance and Training ?
5years operation ? Related civil works ?
Financing Management
? QA/QC Management
11Electrification of Existing Tehran-Mashhad
Railway ( 2350 Km )
- Brief Description
- Performing the Engineering, Supplying the goods,
Equipment, - Construction works, Installing, Testing and
Commissioning services, - 6-month supervision, Guarantee period services,
after sale and - Maintenance services simultaneously (EPC)
including - 1 Construction of Overhead Centenary System
(OCS) for Tehran - Mashad double track existing
Railway Route - 2 Constructions of Traction Power
Substations, Paralleling and Sectioning - Substations (AT, SP, and SSP).
- 3 Constructions of SCADA and Dispatching
Centers. - 4 Supplying 70 units required
electrical locomotives (including 50 units
passenger locomotives - Bo-Bo and 20 units freight
locomotive Co-Co) with 2 years guarantee and
spare parts. - 5 offering full maintenance services for
the whole project such as substations, - overhead network, and centralized
control BoBo and CoCo locomotives for a - period of five years along with
supplying the spare parts, consumable materials
and manpower. - Location Tehran-Mashhad existing railway
- Project Period 30 Months
12Reconstruction and Renewal Of 200 KM Khorasan
Railway
Client Railway of Islamic Republic of
Iran Project type EPC Scope of Work ?
Project Management ? Disassembling the old
rail road track Ballast replacement
?Transporting of the Rail and Sleeper
assembled blocks ? Welding Rails ? Fixed
points procurement and Installation ?
Final track make up ? Local and foreign
material Procurement ? Track
maintenance ?QA/QC management Brief
Description Reconstruction and Renewal of 200
Km Khorasan line together with supplying
construction material from foreign and
local resources as well as 2 years Track
Maintenance Location Khorasan Province
Project Period 48 months ( including 2
years maintenance)
13Reconstruction and Renewal Of 200 KM Khorasan
Railway
14Major Projects
Power Transmission Line Projects
15400 kV Transmission line Single circuit Twin
Bundle
Client Khorasan Regional Electric
Company (K.R.E.C) Project
type EPC and Finance Scope of Work ?
Project Management Services ? Project Controls ?
Engineering Management ? Procurement Management ?
Construction Management ? QA / QC
Management Brief Description Installing
Suspension And Tension Insulator String , And
Jumper Assembly With All Respective Hardware
And Accessories , Wiring And Adjusting Tension
And Sag Of Wire According To Wiring Schedules
And Executive Drawings And All Services For
Wiring 3 Conductor Curlew Wire400 KV
Transmission Line Of Toos- Shirvan Esfarayen
Single Circuit Twin Bundled. Location
Khorasan, North east of IRAN Project
Period 42 Months
1663 kV Transmission OHL Naeen Cement Plant
- Client Naeen Cement Plant
- Project type EPC
- Partner Company Cemag, Simansazan, Industrial
Consulting Engineers - Scope of Work ? Project Management
- ? Basic Design
- ? Detail Design
- ? Civil works
- ? Procurement
- ? Lattice Type Tower Erection
- ? Wiring and adjusting tension of 63kV
- ? Transmission line
- ? QA/QC management
- Brief Description Installing Suspension and
Tension Insulator String and - Jumper Assembly With All Respective Hardware
and - Accessories , Wiring, Adjusting Tension and Sag
of
1763 kV Transmission OHL Naeen Cement Plant
1863 kV Transmission OHL Nahavand Cement Plant
- Client Nahavand Cement Plant
-
- Project type EPC
-
- Scope of Work ? Project Management
- ? Basic Design
- ? Detail Design
- ? Civil works
- ? Procurement
- ? Lattice Type Tower Erection
- ? Wiring and adjusting tension of 63kV
- Transmission line
- ?QA/QC management
- Brief Description Installing Suspension And
Tension Insulator String - And Jumper Assembly With All Respective
Hardware - And Accessories , Wiring And Adjusting Tension
And - Sag of Wire According To Wiring Schedules of
19Major Projects
Power Substation Projects
20Optimization of Power Distribution of Ahwaz
Production units
Client National Iranian South Oil
(N.I.S.O.C)
Project type
EPC Partner Company Trans Post Pars Scope of
Work ? Project Management ? Basic
Engineering ? Detail Engineering ?
Procurement ? Civil works ? Installation
? Commissioning Start Up ? QA/QC
management ? HSE Management Brief
Description Optimization of Power Distribution
of Ahwaz Production Units, Expansion of
33/11kV Electrical Substations Transformer and
Switchgears Sections. Location Ahwaz
,South of Iran Project Period 24 Months
(Finished)
21High Voltage Substations 230/63 kV
- Client Isfahan Regional Electric Company
- Project type EPC
- Scope of Work ? Project Management
- ? Basic Engineering
- ? Detail Engineering
- ? Procurement
- ? Civil Works
- ? Installation
- ? Commissioning Start Up
- ? QA/QC Management
- Brief Description Extension of 3 Substation in
230 63 kV Sections - Replacing of Three 230/63/20kV Power
Transformer, Replacing of Equipment in 63kV
Section, Add 6 Feeders in 230kV Section with
1 ½ CB Arrangement - Location Abshar , Islam Abad Ardestan
- Project Period 24 Months
22Extension of Abadeh 66kV Substation
- Client Abadeh Cement Factory
-
- Project type EPC
- Partner Company Sanayeh Asia Engineering Co
- Scope of Work ? Basic Design
- ?
Detail design - ? Procurement
Management - ? Installation
- ?Civil Works
- ? Commissioning and Start Up
- ? QA/QC Management.
- Brief Description Detail Design, Supplying,
Civil Works, Mapping, - Installation,
Test Commissioning of 66/6.3 kV - Substation
- Location Abadeh Near to Shiraz
23High Voltage Bonyan Sanat Khodro Substation
63/20kV
Client Bonyan Sanat Khodro Project type
EPC Scope of Work ? Project Management ?
Detail Engineering ? Procurement ?
Installation ? Commissioning Start Up ?
QA/QC Management ? HSE Management Brief
Description Engineering, Supply, Installation
and Commissioning of complete HV
Substation 63/20kV, Including H model
Substation, 2 Bay Input and11 Output
Feeder Location Saveh Project Period 24
Months (Finished)
24High Voltage Naeen Cement Factory Substation
63/6.3 kV
- Client Naeen Cement Factory
- Project type EPC
- Scope of Work ?Project Management
- ? Basic Engineering
- ?Detail Engineering
- ?Procurement
- ?Civil Works
- ?Installation
- ?QA/QC Management
- Brief Description Basic Detail Design
of 63/6.3kV Substation - Which Feed From
Two 63kV Bay Two Transformer - 2 Input Feeder
- 2 Transformer Feeder
- 10 Out put Coupling Feeder
- Location Naeen (Isfahan)
25NIOTC 11 kV /400 V Substation
- Client National Iranian Oil Terminal Co.
(NIOTC) - Project type PC
- Scope of Work ? Project Management
- ? Design Review
- ? Project Control
- ? Procurement Management
- ? Civil Works
- ? Construction Management
- ? QA/QC Management
- ? HSE Management
- Brief Description 11kV/400V
Substations, Replacement of 13
Transformer ,Settlement of Mechanical
-
Equipment Fire Alarm System -
- Location Kharg Island
- Project Period 12 Months
26Mahshar Besat Town 132kV Transmission Line /
Substation
- Client Mahshahr Special Economic Zone
- Project type EPC
- Scope of Work ? Project Management
- ? Basic Engineering
- ? Detail Engineering
- ? Procurement
- ? Civil Works
- ? Installation
- ? Commissioning Start Up
- ? QA/QC Management
- Brief Description Engineering services,
Procurement, - Construction and Commissioning of
- Mahshahr to Besat Town 132kV Electric Power
- Transmission Line (12km)
- Location Mahshahr (Iran)
2763kV Power Transmission Line GIS 63/6.6kV
Substation in Qeshm Island
- Client Qeshm Oil Investment Co
-
- Project type EPC
- Scope of Work ? Basic Design
- ?
Detail design - ? Procurement
- ? Installation
- ? Civil Works
- ? Commissioning and Start Up
- ? QA/QC Management.
- Brief Description Detail Design, Supplying,
Civil Works, Mapping, - Installation,
Test Commissioning of - GIS 66/6.3kV Substation as well as 25km twin
- bundle / twin circuit 63kV transmission line.
- Location Qeshm Island
28Major Projects
OIL, GAS PETROCHEMICAL PROJECTS
29Olefin Unit Construction
Client Bandar Imam Petrochemical Co.
Project type Construction Partner
Company Niksan Sanaat (Iran) Scope of Work ?
Project Management ? Procurement of Bulk
material ? Project Construction ? Civil ?
Mechanical / piping ? Electrical /
instrumentation ? Commissioning Brief
Description Completion of Construction works
at Olefin Unit for Bandar Imam
Petrochemical co Location Bandar Imam
Khomeini Project Period 7 months
30Poly Propylene Production Line Revamp /
Expansion for Arak Petrochemical Company
- Client Arak Petrochemical Company
-
- Project type Construction Commissioning
- Scope of Work ? Project Management
- ? Civil Works
- ? Structure
- ? Mechanical
- ? Electrical
- ? Instrumentation
- ? Procurement of Civil Bulk Material
- ? QA/QC Management
- ? HSE Management
- Brief Description Revamping and expansion of
PP unit - from 50000 TpA to 75000 TpA
- Location Arak
31Polypropylene Production Line Expansion for Arak
Petrochemical Company
32Expansion of Utility units at Arak Petrochemical
company
- Client Arak Petrochemical Company
-
- Project type Construction Commissioning
- Scope of Work ? Project Management
- ? Civil Work
- ? Structure
- ? Mechanical
- ? Electrical
- ? Instrumentation
- ? Procurement of Civil bulk Material
- ? QA/QC Management
- ? HSE Management
- Brief Description Revamping and expansion works
at - cooling and DM
unit, Central Utility Unit. - Location Arak
- Project Period 5 Months (Finished)
33Renovation Control Systems Upgrading For Steam
Gas Compressor
- Client Tehran Oil Refinery Co
- Project type EP
- Scope of Work
- ?
Project Management - ? Basic Design
- ?
Detail Design - ?
Procurement - ?
Supervision on Installation - ?
Commissioning Start Up - ?
QA/QC Management - ? HSE
Management - Brief Description - 5 Control Panels
Integrated by S7 Siemens PLC - - Cabling
- Programming of PLC Monitoring System
- Instrumentation
- FAT
34Renovation Control Systems Upgrading For Steam
Gas Compressor
35Pre line check , Loop Check and Loop
Test Automation and Control Systems
Client PIDECO on behalf of Daelim Project
type Pre-commissioning Services Scope of
Work ? Project Management ? Finishing the
Remaining Work left by First Contractor
on Control Systems Brief Description Pre line
check loop cheek and loop test of Automation
and control systems of some area of Gas
Refinery South Pars Phase 1 Location
Assaluyeh ,South of Iran Project Period 6
Months (Finished)
36Calibration and Relay Test of Control and
Instrumentation Equipment
Client PIDECO on Behalf of Daelim
and IDRO
Consortium Project type Pre commissioning
Services Scope of Work ? Project Management
?
Ending The Remaining Work from First
Contractor in Control Systems Brief Description
Pre-line-check loop check and loop test
of Automation and
Control Systems in some area of Gas Refinery
South Pars Phase 1 Location Assaluyeh
,South of Iran Project Period 6 Months
(Finished)
37Major Projects
Industry Mine Projects
38Revamping Renovation of Brick Factories
Client Iranian fuel Conservation Organization
(IFCO) Project type Engineering, Procurement
Construction Partner Company KELLER
(GERMANY), IPA-ARPINA (ITALY) SWINDELL
DRESSLER (USA) Scope of Work ? Feasibility
Study ? Project Management ? Transfer of
Technology ? Procurement ? Installation ?
QA/QC Management Brief Description Optimizing
of Fuel Consumption by Replacement of
Traditional Kiln to Improved Tunnel Kiln for
20 factories Location Khorasan - Kerman -
Isfahan - Tabriz - Yazd Project Period 25
Months
39Aluminum Smelter Plant (Hormozal)
Client FATA EPC (Main Contractor for Hormozal
Project) Project type Engineering (Partial),
Procurement (Partial) Construction Partner
Company Cemag, CimanSazan Scope of Work ?
Project Management ? Procurement ? Civil
works ? Installation ? Commissioning Start
Up ? QA/QC management Brief Description
Site Mobilization
Site Excavation
Furnace Building
Reinforced Concrete Pillars
Furnace Casing and
Foundation
Steel Structure for Cladding and Roofing
Cranes
Railing
Control and Electrical Building and Related
Facilities Location Bandar Abbas Project
Period 20 Months
40Major Projects
Management Consulting
41Kerman Province 500MW CCP
- Project Definition
- Offering All Expert Services In Performing
Feasibility Study And Required Studies For
Preparing Explanatory Design For The Construction
Of Combined Cycle Electricity Power Plant, With
The Capacity Of 500 MW In Kerman Province, And
Doing Necessary Discussion With Organization And
Expedient Governmental Sector For Getting
Necessary Approval By Construction Of Above
Mentioned Power Plant - Scope of services
- 1. Preliminary Consideration Of Feasibility Study
And Performing Required Explanatory Reports And
Conducting Certain Negotiations With The
Electricity Development Organization Of Iran,
With The Coordination Of The Company For Getting
The Approval For Construction Of The Power Plant. - 2. Researches For Selecting The Type, Quantity,
Combination And Arrangement Of The Units And
Related BOP In The Location, Which Is Appointed,
With Regard Of Its Effect On Financial Model ,
Appointing Design Parameters. - 3. Studying On The System, And Its Connection To
The Country's Network, Short Cut Calculations And
Stability Of The Network And Distribution Of The
Load. - 4. Studying On The Environmental Conditions For
Getting The Relevant Approval. - 5. Studying On The Weather Conditions Such As
Humidity, Altitude And The Temperature Degree Of
The Project In The Appointed Site. - 6. Studying On The Access And Communication
Routes And Transportation Of The Heavy
Equipments. - (Continued on next page)
42Kerman Province 500MW CCP
- Project Definition (Continued)
- Offering All Expert Services In Performing
Feasibility Study And Required Studies For
Preparing Explanatory Design For The Construction
Of Combined Cycle Electricity Power Plant, With
The Capacity Of 500 MW In Kerman Province, And
Doing Necessary Discussion With Organization And
Expedient Governmental Sector For Getting
Necessary Approval By Construction Of Above
Mentioned Power Plant - Scope of services
- 7. Consideration And Studying On The Geology With
Regard To Earthquake. - 8. Studying On The Possibility Of Access And
Supply Of Raw Water And Its Transfer. - 9. Studying On The Circumstances Of Supplying
Fuel And Fuelling - For The Main Fuel (Gas) And The Fuel Supporter
(Liquid) And Assigning The Required Quantity And
The Technical Specification Of The Fuel And
Cooperation With The Company For Getting Relevant
License. - 10. Preparation Of Financial Model With Regard To
Circular (Letter) And Related Approvals And
According To The Acceptable Formats Of Other
National And International Economical Institutes. - 11. Conducting Certain Negotiations And
Preparation Of Contract For Selling Electricity
Up To The Stage Of To Be Signed By The Company.
43Bojnord Automatic brick factory
- Project Definition
- Bojnord Automatic Brick Factory
- Scope of services
- Following The Step Of The Execution Of The
Project, Such As Design Inspection And Estimating
The Facilities For Arrangement Of The EPC
Contract For Execution, Installation And
Commissioning Of The Mentioned Furnace Tunnel
And The Necessary Action For Introducing Project
To The Organization Of Optimization Of Fuel
Consumption For Using Non Refundable Facilities
Of The Organization And Also Preferred Facilities
From Other Financial Sources And Institutes With
Credit Loan And Signing The Current Project
Agreement In The Form Of EPC
44Crude Oil Storage in Qeshm Island
- Project Definition
- Pre-feasibility study and finance services for
construction of crude oil storages in Qeshm
island free zone. - Scope of services
- 1) Pre-feasibility Studies
- 2) Locating The Most Proper Location To Install
The Tanks With Reference To Environmental,
Economical And Legal Parameters. - 3) Determination Of Storage Capacity, Pumps
Characteristics And Number And Pipe
Specifications Vs. Technical And Economic
Viewpoints - 4) Extraction Of Basic Lay-out And Design Of
Area, Release Of Preliminary Schematic Drawings
And Preparation Of Material / Equipment List - 5) Structural Design Of Tank And Pump Area,
Release Of Drawings For Earthwork And Concrete
Works. - 6) Determination Of Battery Limits For Local /
Foreign Services In Whole Scope Of Engineering,
Procurement, Transportation, Installation And
Construction Works. - 7) Evaluation And Review Of Economic Impacts On
Project Feasibility During Project Key Periods
Like Engineering, Procurement And Construction
Works. - 8) Evaluation And Review Of Interest Rate And
Other Financial Parameters On Project
Feasibility. - (Continued On Next Page)
45Crude Oil Storage in Qeshm Island
- Scope of services
- 9) Preparation Of Human Resource List, Evaluation
Of HR Costs On Project Costs, Including Training
Courses For Maintenance And Operation Works. - 10) Evaluation Of Safety System, Gas/Oil Leakage
Alarm, Fire Alarm And Fire Fighting System. - 11) Evaluation Of Annual Om And Operation Costs.
- 12) Project Finance Services.
- 13) Evaluation Of Project Costs, Preparation Of
Relevant Reports For Vendors. - 14) Management And Leading Of All Communication
To/From Banks/Credential Institutes To Receive
Finance Agreement And Loan Acceptance According
To Clients Conditions And Abilities. - 15) Discussion And Agreement On Investment
Securities Required By Financers And Loan Payers. - 16) Preparation And Supervision Of Finance
Agreement With Financers. - 17) Preparation Of Finance Resources (Finance
Portfolio) And Determination Of Investment Costs. - 18) Preparation Of Investment Guidelines To
Project For Interested Investors - 19) Preparation Of Required Agreement Packages To
Be Signed Between QFZ, NIOC And investors.
46Optimization of Regional Electric Companies
- Project Definition
- Optimization Of Electrical Distribution
Companies Structure, In A Manner That Both
Electric Companies And Clients Suffer Less
Complexity In Their Procedures And Pay Less Costs
For Services. - Scope of services
- Consulting Services To Prepare Optimum
Activity Models For Power Distribution Companies
Which Detail Activity And Analytical Probe
Criteria Are As Following - 1 - Organizational Process Optimization Of
Distribution Departments. - 2 - Outsourcing Sequences For Operations Of
Distribution Department. - 3 - Providing An Optimization Model For
Upgrading Distribution Management. - 4 - Providing An Optimization Model For
Development Of Advisory And Contractual
Capabilities. - 5 - Providing A Model For Upgrading The
Evaluation Systems Of Distribution Department.
47System Loss Reduction System Efficiency
- Barsan Is A Pioneer In Power Quality
- To Increase Overall System Efficiency In Power
Generation, Transmission And Distribution Systems - To Decrease General Power Transmission And
Distribution Loss - To Enhance System Design, Installation, Operation
And Maintenance Standards And Procedures. - Provides New Technologies And New Solutions For A
Better Grid Efficiency - DAS (Distributed Automation Systems)
- AMR (Automatic Meter Reading)
- BPL (Broadband Over Power Line)
48Major Projects
Project Development
49Project Development Highlights by BARSAN
- Barsan has a great attitude and ability to
introduce new solutions and conform new projects
to give the best out of every problem. While
Barsan is a pioneer in new concepts and new
approaches on most of its projects, our
engineering and economical team has completed
several designs, technical and economical
feasibility studies and project developments. - Here is a short example of Barsans prosperous
experiences - 1- Power Grid Loss Optimization and Power Quality
- 2- Optimization of Brick Kilns for Energy Saving
- 3- Environment Friendly Bricks (Un-Fired Bricks)
- 4- Concrete Sleepers (Feasibility Study and
Investment) - 5- Establishment of Several Power Plants as
B.O.O. or B.O.T. Basis Contracts. - 6- Wind Power Plant Projects (Analysis, F.S. and
B.S.) - 7- Solar Power Plant Projects, Industrial
Technology Creation (Conceptual Design, F.S.
B.S.) from 2kW to 1000kW - 8- Hydrogen as an Alternative Energy Carrier
(Conceptual Design, F.S. B.S.) - 9- DC/AC Drive Conversion of Railway
Transportation (C.D.) - 10- Wiremesh Cable Trays
- 11- Cement Factories (F.S, B.S, Investment and
Project Management) 3 Projects accomplished - 12- Mining and Mineral Separation /
Classification Technology - 13- TSP Fertilizer Production (F.S, B.S,
Investment and Project Management) - 14- Date Sugar Extraction and Mass Production
(F.S, B.S. and Investment) - 15- Technology Transfer and Mass Property
Transfer Contract Consultancy and Contract
Management (Privatization, Ownership Transfer,
Operation Contracts, Energy Conversion Agreements
etc.)
50BPL (Broadband Over Power Line)
- Barsan Introduced BPL As A Pioneer Communication
Medium - The First Pilot Project For Transmission Of High
Speed Data On 20KV And 220V Power Line For Tehran
Regional Electric Company. - The First Pilot Project For Transmission Of Voice
On 20kv And 220v Lv Power Line For Providing
Telephony Communication On Power Line By Using
Transmission Of High Speed Data. - Transmission Bandwidth For The Above Two Bpl
Project Is 200 Mbps. - Broadband Infrastucture Development Is One Of The
Most Important Challenges For Worldwide Users
Needs - The Global Broadband Market Is Forecast To Grow
Up 80 Billions Until 2008 - The Annual Growth Rate Between 2003-2004 Was Of
54 - Need Cost Effective And Reliable Solutions That
Bridge The Digital Divide - High Income Economies Account Today For 94 Of
The Broadband Users
51BPL (Broadband over Power Line) Smart Grid
Solutions
- Smart Grid Services Represent The Industrys Most
Robust Capability To Leverage Real-time Electric
Distribution Network. - Services Set Includes The Following Core
Elements - Power Automation
- Automated Meter Reading (AMR)
- Automated Outage Detection And Restoration
- Load Management Through Remote Monitoring Of
Electric Utility Network Equipment - Geographic Information System(gis)/Asset
Management System Updates - Efficient Demand-side Management/Direct Load
Control Programs - Voltage Monitoring From The Substation To The
Meter - Etc.
52Distribution Automation System (DAS) By BARSAN
- Barsan EPC Company Has Developed And Operated
Distribution Automation System (DAS) To Achieve
Its Goal Of Supplying The Best Quality of
Electric Power. Initially, Barsan Has A Close
Cooperation With Well known Companies, To Provide
New DAS Systems To Offer Lower Investment and
Ease of Management, As Well As Excellent
Scalability, Reliability, And High Availability. - Barsans DAS Is A Metropolitan Area System With
Basic Functions Such As Remote Monitoring, Remote
Control, Remote Measurement, And Remote Setup For
Distribution Equipments And A Variety Of
Additional Features For Effective Operation Of
Distribution Such As Failure Detection On
Distribution Line, Failed Section Identification
And Flexible Load Switching, Loss Reduction By
Sharing Related Data With Other Computer Systems,
Overload Prevention, And Line Optimization.
53Pre-stressed Concrete Sleeper Factory by Barsan
- This Project Is Barsans First Attempt On Mass
Production. Basic Idea Induced While Project Team
Was Studying Various Resources To Procure
Concrete Parts For Khorasan Railway Renewal
Project. While It Was A Big Deal To Invest On
Such A Project, Barsan Decided To Take The Risk,
And Invest On The Factory, Considering
Transportation Costs And Barsans Position
Comparing To Other Competitors. - The Sleeper Factory To Be Located At Minimum
Distance To Consumption Place. Initial Capacity
Of The Factory Is 1000 Sleepers In Two Work
Shifts. - Total Investment On Project Is Estimated About 3
Million, And Construction Period Will Be 14
Months.
54Barsan Small Sustainable Energy Solutions
- Barsan Has A Valuable Experience In Sustainable
Energy Sources. Out Engineering And Project
Execution Background Has A Deep Recognition And
Close Touch Of Small Energy Solutions Like Wind
Mills, Solar Plants And Small Water Turbines. - Barsan Has Experimented Design And Prototyping Of
Several Small Energy Systems As Well As
Installation And Commissioning Of Large Power
Plants. We Have Prepared A Complete Package Of
Sustainable Energy Solutions Like - Small Wind Turbine (12.5kw) First Attempt Of
Stall Controlled Blades Designed In Iran.
(Designed And Prototyped) - Small Wind Turbine (25kw) (Designed And
Prototyped) - Small Asynchronous Water Turbines (0.3 To 1 MW) -
Designed - Very Small Water Turbines (1 To 50kw) Designed
- New Concept On CSP Solar Power Plants (4 Kw,
50kw, 250kw And 1MW) Now Under Design,
Prototyping And Patent Process - Very Low Investment, Very Low Consumption Solar
Lighting Solutions For Off Grid Usage Lighting
And Other Small Purposes. - Advance Solar Solutions For Energy Storage And
Hydrogen Energy Carrier.
55Qualified Tenders
- Design ,Procurement,Construction
installation,Commissioning and operation of
Mashhad Urban line 2 - Client Mashhad Urban Railway organization
Consultant Moshaver Pajohesh Co
- Design ,Procurement,Construction
installation,Commissioning and operation of
Mashhad Urban line 2 - Client Mashhad Urban Railway organization
Consultant Moshaver Pajohesh Co
- Design ,Procurement, Construction installation,
Commissioning and operation of MIS oil field
Development project - Client CNPCI
Consultant CNPCI - Design ,Procurement, Construction installation,
Commissioning and operation of Saadat Abad
400/63/20KV GIS Substation - Client Tehran Regional Electric Co
Consultant Moshanir Co - Design ,Procurement, Construction installation,
Commissioning of SSS Substations, phase 1, line 1
shiraz urban railway - Client Shiraz Urban Railway organization
Consultant IMER Co - Design ,Procurement, Construction installation,
Commissioning of infrastructure of Ghazvin-
Rasht- Anzali Transmission line - Client Islamic Republic of Iran Railways ( IRIR)
ConsultantMetra - Design ,Procurement, Construction installation,
Commissioning of Oromiyeh 132/20 kv Substation - Client Azarbayjan Regional Electric Co
ConsultantAran Naghsh
- Design ,Procurement, Construction installation,
Commissioning and operation of MIS oil field
Development project - Client CNPCI
Consultant CNPCI - Design ,Procurement, Construction installation,
Commissioning and operation of Saadat Abad
400/63/20KV GIS Substation - Client Tehran Regional Electric Co
Consultant Moshanir Co - Design ,Procurement, Construction installation,
Commissioning of SSS Substations, phase 1, line 1
shiraz urban railway - Client Shiraz Urban Railway organization
Consultant IMER Co - Design ,Procurement, Construction installation,
Commissioning of infrastructure of Ghazvin-
Rasht- Anzali Transmission line - Client Islamic Republic of Iran Railways ( IRIR)
ConsultantMetra - Design ,Procurement, Construction installation,
Commissioning of Oromiyeh 132/20 kv Substation - Client Azarbayjan Regional Electric Co
ConsultantAran Naghsh
- Design ,Procurement, Construction installation,
Commissioning of Load arms N.I.O.P.D.C - Client Palayesh Naft
-
Consultant- -
56Qualified Tenders
- Design ,Procurement, Construction installation,
Commissioning and operation of Bafgh-Baft-Sabzevar
400/33 kv Substations - Client Shahid Rajayi Institute Consultant -
- Design ,Procurement, Construction installation,
Commissioning and operation of MVLV
Distribution system network at Heart Province - Client Ministry of Energy Water
Consultant MEW
- Design ,Procurement, Construction installation,
Commissioning of 400/132/6.6 kv substation of
Jajarm Aluminum factory - Client Iran Alumina
Consultant Namvaran - Design ,Procurement, Construction installation,
Commissioning of 300 KM Ethiopia 230 kv
transmission line - Client EEPCO
Consultant -
- Design ,Procurement, Construction installation,
Commissioning of two 230 kv substations in
Ethiopia - Client EEPCO
Consultant - - Design ,Procurement, Construction installation,
Commissioning of 120 MW Wind farm in Ethiopia - Client EEPCO
Consultant - - Design ,Procurement, Construction installation,
Commissioning of slurry transfer of Bauxite in
Guinea - Client SBDT
Consultant Nipec Co - Design ,Procurement, Construction installation,
Commissioning and operation of Oman 33/11
Substation - Client PDO
Consultant -
57Qualified Tenders
- Optimizing of distribution network and design,
procurement, commissioning of AMR - Client Tehran electric distributing Co
Consultant Pajoheshgah Niro - Design ,Procurement, Construction installation,
Commissioning of 33/11 kv Mobile Substation in
Iraq - Client KRG Consultant-
- Darbandikhan Hydro power Plant substations in
Iraq - Client KRG Consultant-
- Shiraz Urban railway Signaling System
- Client Shiraz Urban railway
Consultant
IMER - Tabriz Urban Railway substation
- Client Tabriz Urban Railway
Consultant Railbandar - Shiraz Urban railway ventilation
- Client Shiraz Urban railway
Consultant IMER
58Qualified Tenders
- Kabul renovation of Contribution network (phase
1) in Afghanistan - Client MEW
Consultant SMEC - Supplying different electrical equipments in
Afghanistan - Client DABM
Consultant - - 4 km feeding system of Tehran Subway
- Client Tehran Urban railway Organization
59Barsan Certificates
60Barsan Certificates
61Barsan Certificates
62Barsan Certificates
63Barsan Certificates
64Barsan Certificates
Consortium of DEALIM and IDRO PIDECO Certificate
of work Quality Dated 26May 2003 This is to
certify that Barsan Modiriat Co Has performed
Loop Check of Instrumentation in Area 1, 2, 4
13 of Phase 1 South Pars Gas Refinery, and has
been accepted by PIDECO. Out thanks are addressed
to management and technical staff of the
company. Letter signed by Mr. Riahi Pour (site
manage) And Saeed Asadi (EI manager)
65Barsan Certificates
MAPNA Group Iranian Power plant Project
Management Company Dated 6 May 2006 To
Barsan Co. (CEO) Dear Sir, Hereby ref. your
letter no. LG700/031 dated 6-3-2006 you are
kindly informed that First inspection show that
in current time, not decreasing than the least
situation required of management and staff, your
company is qualified as a bidder for MAPNA
tenders, to execute transmission lines up to
400kV, Substations up to 230kV as EPC projects,
and also EPC projects of electrical
instrumentation. Letter signed by Behzad
Azam Commercial Manager
66- No. 254, Iran Zamin St, Shahrak Gharb ,
Tehran-Iran - Tel (98-21) 88371130
- TeleFax (98-21) 88088973
- E-mailInfo_at_Barsan.co.ir