Barsan Co PowerPoint PPT Presentation

presentation player overlay
1 / 66
About This Presentation
Transcript and Presenter's Notes

Title: Barsan Co


1
Project Development Railway Subway
Substation Transmission Oil Gas
Petrochemical Water Waste Water Industrial
Projects
2
About Barsan
  • BARSAN, is the single-source solution for
    concept-to-completion,
  • Seamless project execution.
  • Every aspect of Planning, Design, Procurement,
    Construction, Start-up,
  • Commissioning and Financing is supported to
    produce the most reliable
  • processing facilities.
  • Clients can count on experienced, professional
    staff for open and honest
  • communication.
  • The BARSANs fine tuned project management team,
    will safely and
  • efficiently guide each project to peak
    performance and profitability based
  • on the most advanced management techniques
    (PMBOK).
  • Our Company's activities encompass the Power
    Transmission networks and
  • Substations, Power plants, Oil, Gas
    Petrochemical, Railway
  • Subway, mine and Mining industries.

3
Services
1- PROJECT MANAGEMENT SERVICES Project
Management Construction Management Quality
?Management Time, Cost Risk Management 2-
ENGINEERING SERVICES Feasibility
Studies Front-End Engineering Design Detail
Engineering Site Technical Services HSE Risk
Analysis Technical Consulting 3- PROCUREMENT
SERVICES Market Survey, and Supplier
Selection Price Inquiry and Negotiation Purchasi
ng, Inspection and Shipment
4- CONSTRUCTION WORKS ? Civil Construction Mecha
nical Installation Electrical Installation Instr
umentation Installation 5- COMMISSIONING
ACTIVITIES Pre-commissioning Commissioning Sta
rt up 6-FINANCIAL SERVICES Financial
Analysis Project Financing Financial Risk
Management
4
Barsans Organization Chart
5
Barsan Human Resource Comparison Charts
6
Major Projects
Railway Subway Projects
7
9 units Traction Substations 3 Medium Voltage
Dispatching Substations
  • Client SHIRAZ URBAN RAILWAY ORG
  • Project type EP
  • Partner Company Siemens (Germany)
  • Transfo (Switzerland)
  • Scope of Work ? Project Management
  • ? Performing further engineering services
  • ? Simulation
  • ? Procurement
  • ? Supervision on Installation
  • ? Training
  • ? QA/QC Management
  • Brief Description
  • Supplying Equipment, supervision on installation
    and commissioning of 9 units of traction
    substations and 3 units of medium voltage
    distribution substations.
  • Supplying DC and medium voltage switching
    equipment.
  • Supervision of SCADA system of traction
    substations and MV dispatching substations

8
26 Km Overhead Catenary System (O.C.S)
Client SHIRAZ URBAN RAILWAY ORG Project
type EPC Partner Company PKAG Company
(Switzerland) Siemens (Germany)
K M (Switzerland) Scope of
Work ? Project Management ? Reverse
Engineering ? Formal Designing and Simulation
of Mechanical and Electrical System of
the Overhead
Network ?Procurement ? Cables ?
Installation ?QA/QC Management Brief
Description Designing, Supplying Equipments and

Implementation of OCS (Overhead
Catenary System) for line 1 of Shiraz
Urban Railway. Location Shiraz Line
1 Project Period 30 Months
9
8 units Traction Substations
  • Client Tabriz Urban Railway
  • Project type EP
  • Partner Company SECHERON (Switzerland)
  • Schneider (Italy)
  • Scope of Work ? Project Management
  • ? Basic Design
  • ? Detail Design
  • ? Procurement
  • ? Super vision on Installation
  • ? Commissioning
  • ? QA/QC management
  • Brief Description
  • Carry out Reverse Engineering Services
  • Simulation Supplying DC Equipments
  • Supplying Medium Voltage Switching Equipment

10
Electrification of Existing Tehran-Mashhad
Railway ( 2350 Km )
Client Islamic Republic of Iran Railways (
RAI) Project type EPCF Partners company
Tam- Wagonpars- Hirbodan Foreign
Partner Siemens- Alstom Scope of
Work ? Project Management ? Performing
further Engineering Services ? Simulation ?
S.S extension equipments, Transmission line
? Procurement Traction S.S of OCS system ?
SCADA System
? Supplying of Locomotives ?
Installation ? Maintenance and Training ?
5years operation ? Related civil works ?
Financing Management
? QA/QC Management
11
Electrification of Existing Tehran-Mashhad
Railway ( 2350 Km )
  • Brief Description
  • Performing the Engineering, Supplying the goods,
    Equipment,
  • Construction works, Installing, Testing and
    Commissioning services,
  • 6-month supervision, Guarantee period services,
    after sale and
  • Maintenance services simultaneously (EPC)
    including
  • 1 Construction of Overhead Centenary System
    (OCS) for Tehran
  • Mashad double track existing
    Railway Route
  • 2 Constructions of Traction Power
    Substations, Paralleling and Sectioning
  • Substations (AT, SP, and SSP).
  • 3 Constructions of SCADA and Dispatching
    Centers.
  • 4 Supplying 70 units required
    electrical locomotives (including 50 units
    passenger locomotives
  • Bo-Bo and 20 units freight
    locomotive Co-Co) with 2 years guarantee and
    spare parts.
  • 5 offering full maintenance services for
    the whole project such as substations,
  • overhead network, and centralized
    control BoBo and CoCo locomotives for a
  • period of five years along with
    supplying the spare parts, consumable materials
    and manpower.
  • Location Tehran-Mashhad existing railway
  • Project Period 30 Months

12
Reconstruction and Renewal Of 200 KM Khorasan
Railway
Client Railway of Islamic Republic of
Iran Project type EPC Scope of Work ?
Project Management ? Disassembling the old
rail road track Ballast replacement
?Transporting of the Rail and Sleeper
assembled blocks ? Welding Rails ? Fixed
points procurement and Installation ?
Final track make up ? Local and foreign
material Procurement ? Track
maintenance ?QA/QC management Brief
Description Reconstruction and Renewal of 200
Km Khorasan line together with supplying
construction material from foreign and
local resources as well as 2 years Track
Maintenance Location Khorasan Province
Project Period 48 months ( including 2
years maintenance)
13
Reconstruction and Renewal Of 200 KM Khorasan
Railway
14
Major Projects
Power Transmission Line Projects
15
400 kV Transmission line Single circuit Twin
Bundle
Client Khorasan Regional Electric
Company (K.R.E.C) Project
type EPC and Finance Scope of Work ?
Project Management Services ? Project Controls ?
Engineering Management ? Procurement Management ?
Construction Management ? QA / QC
Management Brief Description Installing
Suspension And Tension Insulator String , And
Jumper Assembly With All Respective Hardware
And Accessories , Wiring And Adjusting Tension
And Sag Of Wire According To Wiring Schedules
And Executive Drawings And All Services For
Wiring 3 Conductor Curlew Wire400 KV
Transmission Line Of Toos- Shirvan Esfarayen
Single Circuit Twin Bundled. Location
Khorasan, North east of IRAN Project
Period 42 Months
16
63 kV Transmission OHL Naeen Cement Plant
  • Client Naeen Cement Plant
  • Project type EPC
  • Partner Company Cemag, Simansazan, Industrial
    Consulting Engineers
  • Scope of Work ? Project Management
  • ? Basic Design
  • ? Detail Design
  • ? Civil works
  • ? Procurement
  • ? Lattice Type Tower Erection
  • ? Wiring and adjusting tension of 63kV
  • ? Transmission line
  • ? QA/QC management
  • Brief Description Installing Suspension and
    Tension Insulator String and
  • Jumper Assembly With All Respective Hardware
    and
  • Accessories , Wiring, Adjusting Tension and Sag
    of

17
63 kV Transmission OHL Naeen Cement Plant
18
63 kV Transmission OHL Nahavand Cement Plant
  • Client Nahavand Cement Plant
  • Project type EPC
  • Scope of Work ? Project Management
  • ? Basic Design
  • ? Detail Design
  • ? Civil works
  • ? Procurement
  • ? Lattice Type Tower Erection
  • ? Wiring and adjusting tension of 63kV
  • Transmission line
  • ?QA/QC management
  • Brief Description Installing Suspension And
    Tension Insulator String
  • And Jumper Assembly With All Respective
    Hardware
  • And Accessories , Wiring And Adjusting Tension
    And
  • Sag of Wire According To Wiring Schedules of

19
Major Projects
Power Substation Projects
20
Optimization of Power Distribution of Ahwaz
Production units
Client National Iranian South Oil
(N.I.S.O.C)
Project type
EPC Partner Company Trans Post Pars Scope of
Work ? Project Management ? Basic
Engineering ? Detail Engineering ?
Procurement ? Civil works ? Installation
? Commissioning Start Up ? QA/QC
management ? HSE Management Brief
Description Optimization of Power Distribution
of Ahwaz Production Units, Expansion of
33/11kV Electrical Substations Transformer and
Switchgears Sections. Location Ahwaz
,South of Iran Project Period 24 Months
(Finished)
21
High Voltage Substations 230/63 kV
  • Client Isfahan Regional Electric Company
  • Project type EPC
  • Scope of Work ? Project Management
  • ? Basic Engineering
  • ? Detail Engineering
  • ? Procurement
  • ? Civil Works
  • ? Installation
  • ? Commissioning Start Up
  • ? QA/QC Management
  • Brief Description Extension of 3 Substation in
    230 63 kV Sections
  • Replacing of Three 230/63/20kV Power
    Transformer, Replacing of Equipment in 63kV
    Section, Add 6 Feeders in 230kV Section with
    1 ½ CB Arrangement
  • Location Abshar , Islam Abad Ardestan
  • Project Period 24 Months

22
Extension of Abadeh 66kV Substation
  • Client Abadeh Cement Factory
  • Project type EPC
  • Partner Company Sanayeh Asia Engineering Co
  • Scope of Work ? Basic Design
  • ?
    Detail design
  • ? Procurement
    Management
  • ? Installation
  • ?Civil Works
  • ? Commissioning and Start Up
  • ? QA/QC Management.
  • Brief Description Detail Design, Supplying,
    Civil Works, Mapping,
  • Installation,
    Test Commissioning of 66/6.3 kV
  • Substation
  • Location Abadeh Near to Shiraz

23
High Voltage Bonyan Sanat Khodro Substation
63/20kV
Client Bonyan Sanat Khodro Project type
EPC Scope of Work ? Project Management ?
Detail Engineering ? Procurement ?
Installation ? Commissioning Start Up ?
QA/QC Management ? HSE Management Brief
Description Engineering, Supply, Installation
and Commissioning of complete HV
Substation 63/20kV, Including H model
Substation, 2 Bay Input and11 Output
Feeder Location Saveh Project Period 24
Months (Finished)
24
High Voltage Naeen Cement Factory Substation
63/6.3 kV
  • Client Naeen Cement Factory
  • Project type EPC
  • Scope of Work ?Project Management
  • ? Basic Engineering
  • ?Detail Engineering
  • ?Procurement
  • ?Civil Works
  • ?Installation
  • ?QA/QC Management
  • Brief Description Basic Detail Design
    of 63/6.3kV Substation
  • Which Feed From
    Two 63kV Bay Two Transformer
  • 2 Input Feeder
  • 2 Transformer Feeder
  • 10 Out put Coupling Feeder
  • Location Naeen (Isfahan)

25
NIOTC 11 kV /400 V Substation
  • Client National Iranian Oil Terminal Co.
    (NIOTC)
  • Project type PC
  • Scope of Work ? Project Management
  • ? Design Review
  • ? Project Control
  • ? Procurement Management
  • ? Civil Works
  • ? Construction Management
  • ? QA/QC Management
  • ? HSE Management
  • Brief Description 11kV/400V
    Substations, Replacement of 13
    Transformer ,Settlement of Mechanical

  • Equipment Fire Alarm System
  • Location Kharg Island
  • Project Period 12 Months

26
Mahshar Besat Town 132kV Transmission Line /
Substation
  • Client Mahshahr Special Economic Zone
  • Project type EPC
  • Scope of Work ? Project Management
  • ? Basic Engineering
  • ? Detail Engineering
  • ? Procurement
  • ? Civil Works
  • ? Installation
  • ? Commissioning Start Up
  • ? QA/QC Management
  • Brief Description Engineering services,
    Procurement,
  • Construction and Commissioning of
  • Mahshahr to Besat Town 132kV Electric Power
  • Transmission Line (12km)
  • Location Mahshahr (Iran)

27
63kV Power Transmission Line GIS 63/6.6kV
Substation in Qeshm Island
  • Client Qeshm Oil Investment Co
  • Project type EPC
  • Scope of Work ? Basic Design
  • ?
    Detail design
  • ? Procurement
  • ? Installation
  • ? Civil Works
  • ? Commissioning and Start Up
  • ? QA/QC Management.
  • Brief Description Detail Design, Supplying,
    Civil Works, Mapping,
  • Installation,
    Test Commissioning of
  • GIS 66/6.3kV Substation as well as 25km twin
  • bundle / twin circuit 63kV transmission line.
  • Location Qeshm Island

28
Major Projects
OIL, GAS PETROCHEMICAL PROJECTS
29
Olefin Unit Construction
Client Bandar Imam Petrochemical Co.
Project type Construction Partner
Company Niksan Sanaat (Iran) Scope of Work ?
Project Management ? Procurement of Bulk
material ? Project Construction ? Civil ?
Mechanical / piping ? Electrical /
instrumentation ? Commissioning Brief
Description Completion of Construction works
at Olefin Unit for Bandar Imam
Petrochemical co Location Bandar Imam
Khomeini Project Period 7 months
30
Poly Propylene Production Line Revamp /
Expansion for Arak Petrochemical Company
  • Client Arak Petrochemical Company
  • Project type Construction Commissioning
  • Scope of Work ? Project Management
  • ? Civil Works
  • ? Structure
  • ? Mechanical
  • ? Electrical
  • ? Instrumentation
  • ? Procurement of Civil Bulk Material
  • ? QA/QC Management
  • ? HSE Management
  • Brief Description Revamping and expansion of
    PP unit
  • from 50000 TpA to 75000 TpA
  • Location Arak

31
Polypropylene Production Line Expansion for Arak
Petrochemical Company
32
Expansion of Utility units at Arak Petrochemical
company
  • Client Arak Petrochemical Company
  • Project type Construction Commissioning
  • Scope of Work ? Project Management
  • ? Civil Work
  • ? Structure
  • ? Mechanical
  • ? Electrical
  • ? Instrumentation
  • ? Procurement of Civil bulk Material
  • ? QA/QC Management
  • ? HSE Management
  • Brief Description Revamping and expansion works
    at
  • cooling and DM
    unit, Central Utility Unit.
  • Location Arak
  • Project Period 5 Months (Finished)

33
Renovation Control Systems Upgrading For Steam
Gas Compressor
  • Client Tehran Oil Refinery Co
  • Project type EP
  • Scope of Work
  • ?
    Project Management
  • ? Basic Design
  • ?
    Detail Design
  • ?
    Procurement
  • ?
    Supervision on Installation
  • ?
    Commissioning Start Up
  • ?
    QA/QC Management
  • ? HSE
    Management
  • Brief Description - 5 Control Panels
    Integrated by S7 Siemens PLC
  • - Cabling
  • Programming of PLC Monitoring System
  • Instrumentation
  • FAT

34
Renovation Control Systems Upgrading For Steam
Gas Compressor
35
Pre line check , Loop Check and Loop
Test Automation and Control Systems
Client PIDECO on behalf of Daelim Project
type Pre-commissioning Services Scope of
Work ? Project Management ? Finishing the
Remaining Work left by First Contractor
on Control Systems Brief Description Pre line
check loop cheek and loop test of Automation
and control systems of some area of Gas
Refinery South Pars Phase 1 Location
Assaluyeh ,South of Iran Project Period 6
Months (Finished)
36
Calibration and Relay Test of Control and
Instrumentation Equipment
Client PIDECO on Behalf of Daelim
and IDRO
Consortium Project type Pre commissioning
Services Scope of Work ? Project Management
?
Ending The Remaining Work from First
Contractor in Control Systems Brief Description
Pre-line-check loop check and loop test
of Automation and
Control Systems in some area of Gas Refinery
South Pars Phase 1 Location Assaluyeh
,South of Iran Project Period 6 Months
(Finished)
37
Major Projects
Industry Mine Projects
38
Revamping Renovation of Brick Factories
Client Iranian fuel Conservation Organization
(IFCO) Project type Engineering, Procurement
Construction Partner Company KELLER
(GERMANY), IPA-ARPINA (ITALY) SWINDELL
DRESSLER (USA) Scope of Work ? Feasibility
Study ? Project Management ? Transfer of
Technology ? Procurement ? Installation ?
QA/QC Management Brief Description Optimizing
of Fuel Consumption by Replacement of
Traditional Kiln to Improved Tunnel Kiln for
20 factories Location Khorasan - Kerman -
Isfahan - Tabriz - Yazd Project Period 25
Months
39
Aluminum Smelter Plant (Hormozal)
Client FATA EPC (Main Contractor for Hormozal
Project) Project type Engineering (Partial),
Procurement (Partial) Construction Partner
Company Cemag, CimanSazan Scope of Work ?
Project Management ? Procurement ? Civil
works ? Installation ? Commissioning Start
Up ? QA/QC management Brief Description
Site Mobilization
Site Excavation
Furnace Building
Reinforced Concrete Pillars
Furnace Casing and
Foundation
Steel Structure for Cladding and Roofing
Cranes
Railing
Control and Electrical Building and Related
Facilities Location Bandar Abbas Project
Period 20 Months
40
Major Projects
Management Consulting
41
Kerman Province 500MW CCP
  • Project Definition
  • Offering All Expert Services In Performing
    Feasibility Study And Required Studies For
    Preparing Explanatory Design For The Construction
    Of Combined Cycle Electricity Power Plant, With
    The Capacity Of 500 MW In Kerman Province, And
    Doing Necessary Discussion With Organization And
    Expedient Governmental Sector For Getting
    Necessary Approval By Construction Of Above
    Mentioned Power Plant
  • Scope of services
  • 1. Preliminary Consideration Of Feasibility Study
    And Performing Required Explanatory Reports And
    Conducting Certain Negotiations With The
    Electricity Development Organization Of Iran,
    With The Coordination Of The Company For Getting
    The Approval For Construction Of The Power Plant.
  • 2. Researches For Selecting The Type, Quantity,
    Combination And Arrangement Of The Units And
    Related BOP In The Location, Which Is Appointed,
    With Regard Of Its Effect On Financial Model ,
    Appointing Design Parameters.
  • 3. Studying On The System, And Its Connection To
    The Country's Network, Short Cut Calculations And
    Stability Of The Network And Distribution Of The
    Load.
  • 4. Studying On The Environmental Conditions For
    Getting The Relevant Approval.
  • 5. Studying On The Weather Conditions Such As
    Humidity, Altitude And The Temperature Degree Of
    The Project In The Appointed Site.
  • 6. Studying On The Access And Communication
    Routes And Transportation Of The Heavy
    Equipments.
  • (Continued on next page)

42
Kerman Province 500MW CCP
  • Project Definition (Continued)
  • Offering All Expert Services In Performing
    Feasibility Study And Required Studies For
    Preparing Explanatory Design For The Construction
    Of Combined Cycle Electricity Power Plant, With
    The Capacity Of 500 MW In Kerman Province, And
    Doing Necessary Discussion With Organization And
    Expedient Governmental Sector For Getting
    Necessary Approval By Construction Of Above
    Mentioned Power Plant
  • Scope of services
  • 7. Consideration And Studying On The Geology With
    Regard To Earthquake.
  • 8. Studying On The Possibility Of Access And
    Supply Of Raw Water And Its Transfer.
  • 9. Studying On The Circumstances Of Supplying
    Fuel And Fuelling
  • For The Main Fuel (Gas) And The Fuel Supporter
    (Liquid) And Assigning The Required Quantity And
    The Technical Specification Of The Fuel And
    Cooperation With The Company For Getting Relevant
    License.
  • 10. Preparation Of Financial Model With Regard To
    Circular (Letter) And Related Approvals And
    According To The Acceptable Formats Of Other
    National And International Economical Institutes.
  • 11. Conducting Certain Negotiations And
    Preparation Of Contract For Selling Electricity
    Up To The Stage Of To Be Signed By The Company.

43
Bojnord Automatic brick factory
  • Project Definition
  • Bojnord Automatic Brick Factory
  • Scope of services
  • Following The Step Of The Execution Of The
    Project, Such As Design Inspection And Estimating
    The Facilities For Arrangement Of The EPC
    Contract For Execution, Installation And
    Commissioning Of The Mentioned Furnace Tunnel
    And The Necessary Action For Introducing Project
    To The Organization Of Optimization Of Fuel
    Consumption For Using Non Refundable Facilities
    Of The Organization And Also Preferred Facilities
    From Other Financial Sources And Institutes With
    Credit Loan And Signing The Current Project
    Agreement In The Form Of EPC

44
Crude Oil Storage in Qeshm Island
  • Project Definition
  • Pre-feasibility study and finance services for
    construction of crude oil storages in Qeshm
    island free zone.
  • Scope of services
  • 1) Pre-feasibility Studies
  • 2) Locating The Most Proper Location To Install
    The Tanks With Reference To Environmental,
    Economical And Legal Parameters.
  • 3) Determination Of Storage Capacity, Pumps
    Characteristics And Number And Pipe
    Specifications Vs. Technical And Economic
    Viewpoints
  • 4) Extraction Of Basic Lay-out And Design Of
    Area, Release Of Preliminary Schematic Drawings
    And Preparation Of Material / Equipment List
  • 5) Structural Design Of Tank And Pump Area,
    Release Of Drawings For Earthwork And Concrete
    Works.
  • 6) Determination Of Battery Limits For Local /
    Foreign Services In Whole Scope Of Engineering,
    Procurement, Transportation, Installation And
    Construction Works.
  • 7) Evaluation And Review Of Economic Impacts On
    Project Feasibility During Project Key Periods
    Like Engineering, Procurement And Construction
    Works.
  • 8) Evaluation And Review Of Interest Rate And
    Other Financial Parameters On Project
    Feasibility.
  • (Continued On Next Page)

45
Crude Oil Storage in Qeshm Island
  • Scope of services
  • 9) Preparation Of Human Resource List, Evaluation
    Of HR Costs On Project Costs, Including Training
    Courses For Maintenance And Operation Works.
  • 10) Evaluation Of Safety System, Gas/Oil Leakage
    Alarm, Fire Alarm And Fire Fighting System.
  • 11) Evaluation Of Annual Om And Operation Costs.
  • 12) Project Finance Services.
  • 13) Evaluation Of Project Costs, Preparation Of
    Relevant Reports For Vendors.
  • 14) Management And Leading Of All Communication
    To/From Banks/Credential Institutes To Receive
    Finance Agreement And Loan Acceptance According
    To Clients Conditions And Abilities.
  • 15) Discussion And Agreement On Investment
    Securities Required By Financers And Loan Payers.
  • 16) Preparation And Supervision Of Finance
    Agreement With Financers.
  • 17) Preparation Of Finance Resources (Finance
    Portfolio) And Determination Of Investment Costs.
  • 18) Preparation Of Investment Guidelines To
    Project For Interested Investors
  • 19) Preparation Of Required Agreement Packages To
    Be Signed Between QFZ, NIOC And investors.

46
Optimization of Regional Electric Companies
  • Project Definition
  • Optimization Of Electrical Distribution
    Companies Structure, In A Manner That Both
    Electric Companies And Clients Suffer Less
    Complexity In Their Procedures And Pay Less Costs
    For Services.
  • Scope of services
  • Consulting Services To Prepare Optimum
    Activity Models For Power Distribution Companies
    Which Detail Activity And Analytical Probe
    Criteria Are As Following
  • 1 - Organizational Process Optimization Of
    Distribution Departments.
  • 2 - Outsourcing Sequences For Operations Of
    Distribution Department.
  • 3 - Providing An Optimization Model For
    Upgrading Distribution Management.
  • 4 - Providing An Optimization Model For
    Development Of Advisory And Contractual
    Capabilities.
  • 5 - Providing A Model For Upgrading The
    Evaluation Systems Of Distribution Department.

47
System Loss Reduction System Efficiency
  • Barsan Is A Pioneer In Power Quality
  • To Increase Overall System Efficiency In Power
    Generation, Transmission And Distribution Systems
  • To Decrease General Power Transmission And
    Distribution Loss
  • To Enhance System Design, Installation, Operation
    And Maintenance Standards And Procedures.
  • Provides New Technologies And New Solutions For A
    Better Grid Efficiency
  • DAS (Distributed Automation Systems)
  • AMR (Automatic Meter Reading)
  • BPL (Broadband Over Power Line)

48
Major Projects
Project Development
49
Project Development Highlights by BARSAN
  • Barsan has a great attitude and ability to
    introduce new solutions and conform new projects
    to give the best out of every problem. While
    Barsan is a pioneer in new concepts and new
    approaches on most of its projects, our
    engineering and economical team has completed
    several designs, technical and economical
    feasibility studies and project developments.
  • Here is a short example of Barsans prosperous
    experiences
  • 1- Power Grid Loss Optimization and Power Quality
  • 2- Optimization of Brick Kilns for Energy Saving
  • 3- Environment Friendly Bricks (Un-Fired Bricks)
  • 4- Concrete Sleepers (Feasibility Study and
    Investment)
  • 5- Establishment of Several Power Plants as
    B.O.O. or B.O.T. Basis Contracts.
  • 6- Wind Power Plant Projects (Analysis, F.S. and
    B.S.)
  • 7- Solar Power Plant Projects, Industrial
    Technology Creation (Conceptual Design, F.S.
    B.S.) from 2kW to 1000kW
  • 8- Hydrogen as an Alternative Energy Carrier
    (Conceptual Design, F.S. B.S.)
  • 9- DC/AC Drive Conversion of Railway
    Transportation (C.D.)
  • 10- Wiremesh Cable Trays
  • 11- Cement Factories (F.S, B.S, Investment and
    Project Management) 3 Projects accomplished
  • 12- Mining and Mineral Separation /
    Classification Technology
  • 13- TSP Fertilizer Production (F.S, B.S,
    Investment and Project Management)
  • 14- Date Sugar Extraction and Mass Production
    (F.S, B.S. and Investment)
  • 15- Technology Transfer and Mass Property
    Transfer Contract Consultancy and Contract
    Management (Privatization, Ownership Transfer,
    Operation Contracts, Energy Conversion Agreements
    etc.)

50
BPL (Broadband Over Power Line)
  • Barsan Introduced BPL As A Pioneer Communication
    Medium
  • The First Pilot Project For Transmission Of High
    Speed Data On 20KV And 220V Power Line For Tehran
    Regional Electric Company.
  • The First Pilot Project For Transmission Of Voice
    On 20kv And 220v Lv Power Line For Providing
    Telephony Communication On Power Line By Using
    Transmission Of High Speed Data.
  • Transmission Bandwidth For The Above Two Bpl
    Project Is 200 Mbps.
  • Broadband Infrastucture Development Is One Of The
    Most Important Challenges For Worldwide Users
    Needs
  • The Global Broadband Market Is Forecast To Grow
    Up 80 Billions Until 2008
  • The Annual Growth Rate Between 2003-2004 Was Of
    54
  • Need Cost Effective And Reliable Solutions That
    Bridge The Digital Divide
  • High Income Economies Account Today For 94 Of
    The Broadband Users

51
BPL (Broadband over Power Line) Smart Grid
Solutions
  • Smart Grid Services Represent The Industrys Most
    Robust Capability To Leverage Real-time Electric
    Distribution Network.
  • Services Set Includes The Following Core
    Elements
  • Power Automation
  • Automated Meter Reading (AMR)
  • Automated Outage Detection And Restoration
  • Load Management Through Remote Monitoring Of
    Electric Utility Network Equipment
  • Geographic Information System(gis)/Asset
    Management System Updates
  • Efficient Demand-side Management/Direct Load
    Control Programs
  • Voltage Monitoring From The Substation To The
    Meter
  • Etc.

52
Distribution Automation System (DAS) By BARSAN
  • Barsan EPC Company Has Developed And Operated
    Distribution Automation System (DAS) To Achieve
    Its Goal Of Supplying The Best Quality of
    Electric Power. Initially, Barsan Has A Close
    Cooperation With Well known Companies, To Provide
    New DAS Systems To Offer Lower Investment and
    Ease of Management, As Well As Excellent
    Scalability, Reliability, And High Availability.
  • Barsans DAS Is A Metropolitan Area System With
    Basic Functions Such As Remote Monitoring, Remote
    Control, Remote Measurement, And Remote Setup For
    Distribution Equipments And A Variety Of
    Additional Features For Effective Operation Of
    Distribution Such As Failure Detection On
    Distribution Line, Failed Section Identification
    And Flexible Load Switching, Loss Reduction By
    Sharing Related Data With Other Computer Systems,
    Overload Prevention, And Line Optimization.

53
Pre-stressed Concrete Sleeper Factory by Barsan
  • This Project Is Barsans First Attempt On Mass
    Production. Basic Idea Induced While Project Team
    Was Studying Various Resources To Procure
    Concrete Parts For Khorasan Railway Renewal
    Project. While It Was A Big Deal To Invest On
    Such A Project, Barsan Decided To Take The Risk,
    And Invest On The Factory, Considering
    Transportation Costs And Barsans Position
    Comparing To Other Competitors.
  • The Sleeper Factory To Be Located At Minimum
    Distance To Consumption Place. Initial Capacity
    Of The Factory Is 1000 Sleepers In Two Work
    Shifts.
  • Total Investment On Project Is Estimated About 3
    Million, And Construction Period Will Be 14
    Months.

54
Barsan Small Sustainable Energy Solutions
  • Barsan Has A Valuable Experience In Sustainable
    Energy Sources. Out Engineering And Project
    Execution Background Has A Deep Recognition And
    Close Touch Of Small Energy Solutions Like Wind
    Mills, Solar Plants And Small Water Turbines.
  • Barsan Has Experimented Design And Prototyping Of
    Several Small Energy Systems As Well As
    Installation And Commissioning Of Large Power
    Plants. We Have Prepared A Complete Package Of
    Sustainable Energy Solutions Like
  • Small Wind Turbine (12.5kw) First Attempt Of
    Stall Controlled Blades Designed In Iran.
    (Designed And Prototyped)
  • Small Wind Turbine (25kw) (Designed And
    Prototyped)
  • Small Asynchronous Water Turbines (0.3 To 1 MW) -
    Designed
  • Very Small Water Turbines (1 To 50kw) Designed
  • New Concept On CSP Solar Power Plants (4 Kw,
    50kw, 250kw And 1MW) Now Under Design,
    Prototyping And Patent Process
  • Very Low Investment, Very Low Consumption Solar
    Lighting Solutions For Off Grid Usage Lighting
    And Other Small Purposes.
  • Advance Solar Solutions For Energy Storage And
    Hydrogen Energy Carrier.

55
Qualified Tenders
  • Design ,Procurement,Construction
    installation,Commissioning and operation of
    Mashhad Urban line 2
  • Client Mashhad Urban Railway organization
    Consultant Moshaver Pajohesh Co
  • Design ,Procurement,Construction
    installation,Commissioning and operation of
    Mashhad Urban line 2
  • Client Mashhad Urban Railway organization
    Consultant Moshaver Pajohesh Co
  • Design ,Procurement, Construction installation,
    Commissioning and operation of MIS oil field
    Development project
  • Client CNPCI
    Consultant CNPCI
  • Design ,Procurement, Construction installation,
    Commissioning and operation of Saadat Abad
    400/63/20KV GIS Substation
  • Client Tehran Regional Electric Co

    Consultant Moshanir Co
  • Design ,Procurement, Construction installation,
    Commissioning of SSS Substations, phase 1, line 1
    shiraz urban railway
  • Client Shiraz Urban Railway organization
    Consultant IMER Co
  • Design ,Procurement, Construction installation,
    Commissioning of infrastructure of Ghazvin-
    Rasht- Anzali Transmission line
  • Client Islamic Republic of Iran Railways ( IRIR)

    ConsultantMetra
  • Design ,Procurement, Construction installation,
    Commissioning of Oromiyeh 132/20 kv Substation
  • Client Azarbayjan Regional Electric Co

    ConsultantAran Naghsh
  • Design ,Procurement, Construction installation,
    Commissioning and operation of MIS oil field
    Development project
  • Client CNPCI
    Consultant CNPCI
  • Design ,Procurement, Construction installation,
    Commissioning and operation of Saadat Abad
    400/63/20KV GIS Substation
  • Client Tehran Regional Electric Co

    Consultant Moshanir Co
  • Design ,Procurement, Construction installation,
    Commissioning of SSS Substations, phase 1, line 1
    shiraz urban railway
  • Client Shiraz Urban Railway organization
    Consultant IMER Co
  • Design ,Procurement, Construction installation,
    Commissioning of infrastructure of Ghazvin-
    Rasht- Anzali Transmission line
  • Client Islamic Republic of Iran Railways ( IRIR)

    ConsultantMetra
  • Design ,Procurement, Construction installation,
    Commissioning of Oromiyeh 132/20 kv Substation
  • Client Azarbayjan Regional Electric Co

    ConsultantAran Naghsh
  • Design ,Procurement, Construction installation,
    Commissioning of Load arms N.I.O.P.D.C
  • Client Palayesh Naft


  • Consultant-

56
Qualified Tenders
  • Design ,Procurement, Construction installation,
    Commissioning and operation of Bafgh-Baft-Sabzevar
    400/33 kv Substations
  • Client Shahid Rajayi Institute Consultant -
  • Design ,Procurement, Construction installation,
    Commissioning and operation of MVLV
    Distribution system network at Heart Province
  • Client Ministry of Energy Water

    Consultant MEW
  • Design ,Procurement, Construction installation,
    Commissioning of 400/132/6.6 kv substation of
    Jajarm Aluminum factory
  • Client Iran Alumina

    Consultant Namvaran
  • Design ,Procurement, Construction installation,
    Commissioning of 300 KM Ethiopia 230 kv
    transmission line
  • Client EEPCO

    Consultant -
  • Design ,Procurement, Construction installation,
    Commissioning of two 230 kv substations in
    Ethiopia
  • Client EEPCO

    Consultant -
  • Design ,Procurement, Construction installation,
    Commissioning of 120 MW Wind farm in Ethiopia
  • Client EEPCO
    Consultant -
  • Design ,Procurement, Construction installation,
    Commissioning of slurry transfer of Bauxite in
    Guinea
  • Client SBDT

    Consultant Nipec Co
  • Design ,Procurement, Construction installation,
    Commissioning and operation of Oman 33/11
    Substation
  • Client PDO

    Consultant -

57
Qualified Tenders
  • Optimizing of distribution network and design,
    procurement, commissioning of AMR
  • Client Tehran electric distributing Co
    Consultant Pajoheshgah Niro
  • Design ,Procurement, Construction installation,
    Commissioning of 33/11 kv Mobile Substation in
    Iraq
  • Client KRG Consultant-
  • Darbandikhan Hydro power Plant substations in
    Iraq
  • Client KRG Consultant-
  • Shiraz Urban railway Signaling System
  • Client Shiraz Urban railway
    Consultant
    IMER
  • Tabriz Urban Railway substation
  • Client Tabriz Urban Railway
    Consultant Railbandar
  • Shiraz Urban railway ventilation
  • Client Shiraz Urban railway
    Consultant IMER

58
Qualified Tenders
  • Kabul renovation of Contribution network (phase
    1) in Afghanistan
  • Client MEW
    Consultant SMEC
  • Supplying different electrical equipments in
    Afghanistan
  • Client DABM

    Consultant -
  • 4 km feeding system of Tehran Subway
  • Client Tehran Urban railway Organization

59
Barsan Certificates
60
Barsan Certificates
61
Barsan Certificates
62
Barsan Certificates
63
Barsan Certificates
64
Barsan Certificates
Consortium of DEALIM and IDRO PIDECO Certificate
of work Quality Dated 26May 2003 This is to
certify that Barsan Modiriat Co Has performed
Loop Check of Instrumentation in Area 1, 2, 4
13 of Phase 1 South Pars Gas Refinery, and has
been accepted by PIDECO. Out thanks are addressed
to management and technical staff of the
company. Letter signed by Mr. Riahi Pour (site
manage) And Saeed Asadi (EI manager)
65
Barsan Certificates
MAPNA Group Iranian Power plant Project
Management Company Dated 6 May 2006 To
Barsan Co. (CEO) Dear Sir, Hereby ref. your
letter no. LG700/031 dated 6-3-2006 you are
kindly informed that First inspection show that
in current time, not decreasing than the least
situation required of management and staff, your
company is qualified as a bidder for MAPNA
tenders, to execute transmission lines up to
400kV, Substations up to 230kV as EPC projects,
and also EPC projects of electrical
instrumentation. Letter signed by Behzad
Azam Commercial Manager
66