  • ????(process choice)
  • ????(vertical integration)
  • ???????????????,?????????????
  • ????(resource flexibility)
  • ?????????????????????????????
  • ????(customer involvement)
  • ??????(capital intensity)

4
Processes at manufacturing organizations
  • Project process
  • Selecting location for new plant in Europe
  • Installing ERP for a manufacturing firms
    business processes
  • Job process
  • Machining precision metal tubes
  • Internal consulting team at manufacturing firm
  • Batch process
  • Forging process to make fittings for pressure
    vessels access
  • Producing a batch of textbooks at R. R.
    Donnelleys plant
  • Line process
  • Auto assembly
  • King Soopers bread line
  • Continuous process
  • Oil refining process
  • Bordens pasta making process

High
Low
Volume
5
Processes at service providers
  • Project process
  • Real estate process for leasing and constructing
    facilities for large insurance company
  • Student teams field project
  • Job process
  • Customer service process at financial services
    firm
  • General medical practice
  • Batch process
  • Order fulfillment process of importer/distributor
  • Placing purchase orders at public relations agency
  • Line process
  • Cafeteria line
  • Teller line at bank
  • Continuous process
  • Power generation plant
  • Providing telephone line access

High
Low
Volume
6
Types of Processes
  • PROJECT BATCH MASS CONTINUOUS
  • Product Unique Made to order Made to stock
    Commodity
  • Customer One-at-a-time Few individuals Mass
    market Mass market
  • Demand Infrequent Fluctuates Stable Very stable
  • Volume Very low Low to med High Very high
  • No. of different Infinite Many, varied Few Very
    low
  • products
  • Production Long-term Discrete, job Repetitive,
    Process industry
  • System Project assembly lines
  • Equipment Varied General-purpose Special-purpose H
    ighly automated
  • Type of work Contracts Fabrication Assembly Mix,
    treat, refine
  • Skills Experts, Wide range Limited
    range Equipment
  • craftspeople of skills of skills monitors
  • Advantages Custom work, Flexibility, Efficiency, H
    ighly efficient
  • technology quality speed, low cost large
    capacity
  • Dis- Nonrepetitive, Costly, slow, Capital
    investment, Difficult to
  • advantages small customer difficult to lack of
    change
  • base, expensive manage responsiveness

7
???????
  • ????
  • ??????
  • ?????????????
  • ??????
  • ???????????

8
????
  • ?????(flexible work force)
  • ???????????????????????
  • ???? vs. ????

9
????
  • ?????(self-service)
  • ????(???)
  • ?????
  • ?????
  • ?????????????

10
??????
  • ??? vs. ????
  • ??????
  • ?????
  • ????
  • ??
  • ??????????,????????????

11
???????????????
Low volume, make-to-order process
  • Project process
  • Selecting location for new plant in Europe
  • Installing ERP for a manufacturing firms
    business processes
  • Less vertical integration
  • More resource flexibility
  • More customer involvement
  • Less capital intensity/automation
  • Job process
  • Machining precision metal tubes
  • Internal consulting team at manufacturing firm

Process design choices
High volume, make-to-stock process
  • More vertical integration
  • Less resource flexibility
  • Less customer involvement
  • More capital intensity/automation
  • Line process
  • Auto assembly
  • King Soopers bread line
  • Continuous process
  • Oil refining process
  • Bordens pasta making process

12
???????????????
Low volume, customized-service process
  • Less vertical integration
  • More resource flexibility
  • More customer involvement
  • Less capital intensity/automation
  • Project process
  • Real estate process for leasing and constructing
    facilities for large insurance company
  • Student teams field project
  • Job process
  • Customer service process at financial services
    firm
  • General medical practice

Process design choices
High volume, standardized-service process
  • Batch process
  • Order fulfillment process of importer/distributor
  • Placing purchase orders at public relations agency
  • More vertical integration
  • Less resource flexibility
  • Less customer involvement
  • More capital intensity/automation
  • Line process
  • Cafeteria line
  • Teller line at bank
  • Continuous process
  • Power generation plant
  • Providing telephone line access

13
??
  • Maxwell vs. Coffee shop

14
Process Selection with Break-Even Analysis
Total cost fixed cost total variable
cost TC cf vcv Total revenue volume x
price TR vp Profit total revenue - total
cost Z TR - TC vp - (cf vcv)
cf fixed cost v volume (i.e., number of units
produced and sold) cv variable cost per
unit p price per unit
15
Solving for Break-Even Volume
16
Break-Even Analysis
17
?????????
  • ??? vs. ???? vs. ??
  • ???120 vs. ???12000
  • ????????????????????
  • ?????????????

18
??????????
  • ??????
  • ????
  • ???????
  • ???????
  • ????
  • ???????
  • ??????
  • ??????

19
??????
  • ?????(type)
  • ?????(form)
  • ?????
  • ?????/????
  • ??????????(????)
  • ????
  • ????
  • ???????
  • ?????
  • ????

20
????
  • ????
  • ???
  • ????????
  • ????
  • ??
  • ??
  • ??
  • ?????
  • ??????
  • ????
  • ???????
  • ????
  • ????????
  • ??
  • ???(accuracy)
  • ??
  • ??
  • ????
  • ???
  • ??????
  • ????
  • ??????

21
???????
  • ??
  • ??
  • ??
  • ??
  • ??
  • ??
  • ??
  • ??
  • ????????????
  • ?????,??????????
  • ?????,????????????
  • ???????,?????????????

22
???????1
  • ??????
  • ????
  • ????
  • ??
  • ????
  • ?????
  • ????
  • ????
  • ???
  • ????
  • ?????????
  • ?????
  • ??????????

23
???????2
  • ???????
  • ?????????????
  • ????
  • ????
  • ??????
  • ????
  • ???
  • ?????
  • ????
  • ?????????????????
  • ?????(????????)?

24
???????3
  • ????
  • ?????
  • ????????????
  • ????????
  • ????
  • ????
  • ????????
  • ????????
  • ??????
  • ??????
  • ????
  • ??????
  • ??????
  • ??????

25
????
  • Purchase cost
  • Operating cost
  • Annual savings
  • Revenue enhancement
  • Replacement analysis
  • Risk and uncertainty
  • Piecemeal analysis

26
????????????
27
???????
  • Blueprints
  • Bill of material (????)
  • Assembly chart /product structure diagram
  • Operations process chart
  • Routing sheet

28
Assembly Chart
29
????????(computer-aided process planning, CAPP)
  • CAPP is a specialize software system for process
    planning.
  • Type of CAPP
  • Variant system
  • A variant system retrieves a standard process
    plan from a CAPP database and allows the planner
    or engineer to modify it for the new part.
  • Generative system
  • A generative system uses a knowledge base of
    rules gathered from expert machinists to create
    an individual process pan from scratch.

30
????
  • The systematic examination of all aspects of a
    process to improve its operation
  • Faster
  • More efficient
  • Less costly
  • More responsive
  • Basic tools
  • Process flowchart
  • Process diagrams
  • Process maps

31
Process Flowchart Symbols(?????)
32
Process Flowchart
33
Process Diagram
34
Process Map
35
??(Routing)1
  • ??????????????????????
  • ???????????????????????????
  • ??????,??????????????????????,????????????

36
??(Routing)2
  • ?????????(Operation),???????????????????????
  • ???????????????????????,???????????
  • ??????,???????,??????????????????,????????????????
    ???,?????????????????????,????????????????????

37
???(Process Sheet)??
38
??????
  • ???????????????????????????????,?????????????

39
??????
  • ?????????????????,?????????????????????,??????????
    ????

40
???????1
  • ??????????
  • ?????????
  • ???????????
  • ????????????????
  • ????????????????
  • ???????????
  • ????????????????????

41
??????2
  • ???????????
  • ???????????
  • ????????????????
  • ???????????
  • ???????????
  • ?????????
  • ???????
  • ???????

42
????????1
  • ??????????????134000?,?????????????2000??,???1?5??
    ???????4?5?2?3?2?????90,????????????

43
????????2
44
????????
90
45
?????????
  • ??????????????????
  • ??????,?????????????????????????????
  • ?????????????????
  • ???????????????????
  • ????????????????????

46
???????????
  • Information Technology
  • Artificial Intelligence
  • Advanced Communications
  • Manufacturing Technology

47
Information Technology
  • Management Information Systems (MIS)
  • Move large amounts of data
  • Decision Support Systems (DSS)
  • Add decision making support
  • Expert System
  • Recommend decision based on expert knowledge

48
Decision Support System
49
Artificial Intelligence
  • Neural networks
  • Emulate interconnections in brain
  • Genetic algorithms
  • Based on adaptive capabilities in nature
  • Fuzzy logic
  • Simulate human ability to deal with ambiguity

50
Advanced Communications
  • Electronic data interchange (EDI)
  • Internet, extranets
  • Wireless communications
  • Teleconferencing telecommuting
  • Bar coding, RFT
  • Virtual reality

51
Manufacturing Technology
  • Numerically controlled (NC) machines
  • Controlled by punched tape
  • Computer numerical controlled (CNC)
  • Controlled by attached computer
  • Direct numerical control (DNC)
  • Several NC machines controlled by single computer
  • Automated Material Handling
  • Robotics
  • Flexible manufacturing systems (FMS)
  • Includes automated material handling

52
Automated Material Handling
  • Conveyors
  • Automated guided vehicle (AGV)
  • Automated storage retrieval system (AS/RS)

53
Flexible Manufacturing Systems (FMS)
  • Programmable machine tools
  • Controlled by common computer network
  • Combines flexibility with efficiency
  • Reduces setup queue times

54
Flexible Manufacturing System
55
Robotics
  • Programmable manipulators
  • Follow specified path
  • Better than humans with respect to
  • Hostile environments
  • Long hours
  • Consistency
  • Adoption has been slowed by ineffective
    integration and adaptation of systems

56
e-Manufacturing
  • Real-time sharing of data with trading partners
    and customers to drive collaborative decisions
  • CAD - uses software to create modify designs
  • GT- classifies designs to benefit from prior
    experience
  • STEP - sets standards for communication
  • CAPP - creates processing instructions for CAM
  • CAM - uses programmable automation in
    manufacturing

57
Components of e-Manufacturing
Write a Comment
User Comments (0)
About PowerShow.com